Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD15-01677
StatusIssued
Name ST LUKES HEALTH SYSTEM LTD
Site Address 222 N 2ND ST Unit: 109
Project NameSLHS Anderson Plaza #109
Customer Number 
ePlanReviewNo
Description
(ST. LUKE'S ANDERSON PLAZA #109 X-RAY)This is a fully fire sprinklered building of Type III 1 hour construction. Permit for renovation of existing imaging room, 198 sq ft. This renovation is entirely within an existing suite. Minor demolition shall be per the approved plans. Structural renovation and special inspections required per attached documents. The 1 hour corridor shall be maintained in the existing building . New imaging equipment shall meet NEC requirements. Please contact the City of Boise electrical divisions for requirements for the new equipment. All new interior finish shall meet IBC chapter 8 requirements. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **ajs**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/9/201512/10/201512/10/2015ANR
DetailsDave Hannah
If no answer please try ###-#### Thank You. Phone #: ###-#### Inspection requested via web by Rock Self
FIRE-Final Inspection12/9/201512/9/201512/9/2015PPASS
DetailsJim Page
Fire alarm inspection complete, no fire sprinklers. Life fire safety inspection passed/complete
BLD-Ceiling Grid Inspection11/28/201511/30/201511/30/2015APASS
DetailsDave Hannah
If no answer please call ###-#### Thank You Phone #: ###-#### Inspection requested via web by Rock Self
Issue PAID IN FULL permit  6/4/2015 DONE
Plan assigned to (AJS)5/20/20155/20/20155/27/2015 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed SLHS
Routing - PLAN CHECK5/27/2015 5/27/2015 PASS
DetailsAdele J Schaffeld-Griffin
Case Summary (BLD)  5/27/2015 DONE
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  5/27/2015 DONE
Inspection Record Card- Bld  5/27/2015 DONE
Permit Ready to Issue  5/27/2015 DONE
DetailsChristina Prado
Need GC Form and Revised Cert of Value

All requirements met
Telephone call  5/27/2015 DONE
called Scott to let permit is ready and that we need the GC and rev cert of val
1st review completed  5/26/2015 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - PLAN CHECK5/19/2015 5/26/2015 FAIL
DetailsAdele J Schaffeld-Griffin
Plan assigned to (TLW)5/19/2015 5/20/2015 DEFR
DetailsTim L. Woodard
Plans ACCEPTED BY PLAN TECH  5/19/2015 DONE
Intake Approval  5/19/2015 PASS
Recd Pcfee & Taken To Pln CK  5/19/2015 DONE
Application received 5/19/2015