Permit Information
Permit NumberBLD15-01678
StatusIssued
Name IDAHO STATE CONSTRUCTION LLC
Site Address 1111 W JEFFERSON ST
Project NamePCA-Boise Building 2nd Floor
Customer Number 
ePlanReviewNo
Description
(PACKAGING CORPORATION OF AMERICA) (BOISE BUILDING-2nd FLOOR REMODEL) second floor remodel for tenant improvements to an existing tenant space. Approval contingent upon adhering to the approved plans on file. Work to include: the installation of a prefabricated server room, the removal of select interior nonbearing partition walls and the construction of select interior nonbearing partition walls and finishes in compliance with chapter 8 of the 2012 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection3/9/20163/9/20163/10/2016 PEND
DetailsTony Young
BLD-Aging Inspection3/8/20163/8/20163/9/2016 PEND
DetailsTony Young
BLD-Framing/Rough-in10/23/201510/26/201510/26/2015APASS
DetailsTony Young
Julie Phone #: ###-####,, walls ok
BLD-Ceiling Grid Inspection8/18/20158/18/20158/18/2015PPASS
DetailsTony Young
Juile Phone #: ###-####
BLD-Conference6/30/20157/1/20157/1/2015ADONE
DetailsMike Jordan
Julie Phone #: ###-####. Architect to submit plan mod for deletion of doors.
BLD-Framing/Rough-in6/1/20156/2/20156/2/2015APASS
DetailsDave Hannah
2nd floor, no ELE in wall - Mike Phone #: ###-####
Issue PAID IN FULL permit  5/28/2015 DONE
Plan assigned to (JG)5/19/20155/19/20155/27/2015 PASS
DetailsJavier Guzman
1st review completed, 6/2 T PCA SECOND FLOOR REMODEL
Case Summary (BLD)  5/27/2015 DONE
DetailsJavier Guzman
Plan Reviewer's activity  5/27/2015  
I called and spoke with Steven Call regarding the engineering which has a heading for the 1st floor remodel not the second floor remodel
Routing - PLAN CHECK5/27/2015 5/27/2015 PASS
DetailsJavier Guzman
recieved a phone call from steven Call explaining the engineering and ok to use the first floor calculations
PLANS/APPL TAKEN TO FRONT DESK  5/27/2015 DONE
Inspection Record Card- Bld  5/27/2015 DONE
Permit Ready to Issue  5/27/2015 DONE
need GC and rev cert of val. ALL REQUIREMENTS MET 5-28-15 blh
Routing - FIRE5/19/20155/19/20155/26/2015 PASS
DetailsKatie Marron
Attached comments to plans
1st review completed  5/26/2015 PASS
DetailsJavier Guzman
Routing - PLAN CHECK5/19/2015 5/22/2015 FAIL
DetailsJavier Guzman
engineering is for the 1st floor remodel not the second floor remodel level 2
Plan assigned to (CDM)5/19/20155/19/20155/19/2015 DEFR
DetailsCarl D Madsen
Plans ACCEPTED BY PLAN TECH  5/19/2015 DONE
Intake Approval  5/19/2015 PASS
Recd Pcfee & Taken To Pln CK  5/19/2015 DONE
Application received 5/19/2015