BLD-Aging Inspection | 3/9/2016 | 3/9/2016 | 3/10/2016 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 3/8/2016 | 3/8/2016 | 3/9/2016 | | PEND |
Tony Young
|
|
|
|
BLD-Framing/Rough-in | 10/23/2015 | 10/26/2015 | 10/26/2015 | A | PASS |
Tony Young
|
|
|
Julie Phone #: ###-####,, walls ok
|
BLD-Ceiling Grid Inspection | 8/18/2015 | 8/18/2015 | 8/18/2015 | P | PASS |
Tony Young
|
|
|
Juile Phone #: ###-####
|
BLD-Conference | 6/30/2015 | 7/1/2015 | 7/1/2015 | A | DONE |
Mike Jordan
|
|
|
Julie Phone #: ###-####. Architect to submit plan mod for deletion of doors.
|
BLD-Framing/Rough-in | 6/1/2015 | 6/2/2015 | 6/2/2015 | A | PASS |
Dave Hannah
|
|
|
2nd floor, no ELE in wall - Mike Phone #: ###-####
|
Issue PAID IN FULL permit | | | 5/28/2015 | | DONE |
|
|
|
|
Plan assigned to (JG) | 5/19/2015 | 5/19/2015 | 5/27/2015 | | PASS |
Javier Guzman
|
|
|
1st review completed, 6/2 T PCA SECOND FLOOR REMODEL
|
Case Summary (BLD) | | | 5/27/2015 | | DONE |
Javier Guzman
|
|
|
|
Plan Reviewer's activity | | | 5/27/2015 | | |
|
|
|
I called and spoke with Steven Call regarding the engineering which has a heading for the 1st floor remodel not the second floor remodel
|
Routing - PLAN CHECK | 5/27/2015 | | 5/27/2015 | | PASS |
Javier Guzman
|
|
|
recieved a phone call from steven Call explaining the engineering and ok to use the first floor calculations
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/27/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/27/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/27/2015 | | DONE |
|
|
|
need GC and rev cert of val. ALL REQUIREMENTS MET 5-28-15 blh
|
Routing - FIRE | 5/19/2015 | 5/19/2015 | 5/26/2015 | | PASS |
Katie Marron
|
|
|
Attached comments to plans
|
1st review completed | | | 5/26/2015 | | PASS |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 5/19/2015 | | 5/22/2015 | | FAIL |
Javier Guzman
|
|
|
engineering is for the 1st floor remodel not the second floor remodel level 2
|
Plan assigned to (CDM) | 5/19/2015 | 5/19/2015 | 5/19/2015 | | DEFR |
Carl D Madsen
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/19/2015 | | DONE |
|
|
|
|
Intake Approval | | | 5/19/2015 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/19/2015 | | DONE |
|
|
|
|
Application received | | 5/19/2015 | | | |
|
|
|
|