BLD-Final | 12/10/2015 | 12/11/2015 | 12/11/2015 | P | PASS |
Tony Young
|
|
|
Justin// please call for access Phone #: ###-#### or ###-####,, still working on exterior
|
DOC - Permit Finaled | 12/11/2015 | 12/11/2015 | 12/11/2015 | P | PASS |
Tony Young
|
|
|
|
BLD-Energy code compliance | 9/29/2015 | 9/29/2015 | 9/29/2015 | P | PASS |
Tony Young
|
|
|
Insulation// Justin Phone #: ###-####
|
BLD-Wall Bracing | 9/25/2015 | 9/28/2015 | 9/28/2015 | A | PASS |
Tony Young
|
|
|
Justin Phone #: ###-####
|
BLD-Wall Bracing | 9/24/2015 | 9/25/2015 | 9/25/2015 | P | NR |
Tony Young
|
|
|
Justin Phone #: ###-####,, need new hold downs per modification
|
BLD-Framing/Rough-in | 9/24/2015 | 9/25/2015 | 9/25/2015 | P | PASS |
Tony Young
|
|
|
Justin Phone #: ###-####
|
BLD-Wall Bracing | 9/25/2015 | 9/25/2015 | 9/25/2015 | A | NR |
Tony Young
|
|
|
Justin Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 9/24/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 9/23/2015 | | |
|
|
|
|
Plan assigned to (AJS) | 9/15/2015 | 9/15/2015 | 9/23/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
plan modification
|
Routing - PLAN CHECK | 9/21/2015 | | 9/23/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Case Summary (BLD) | | | 9/23/2015 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/23/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/23/2015 | | DONE |
|
|
|
DON NOT RE-ISSUE- THIS IS A PLAN MOD
|
Telephone call | | | 9/23/2015 | | DONE |
|
|
|
called Jayo- left message with receptionist that permit is ready for pick up
|
Routing - MECHANICAL | 9/21/2015 | | 9/21/2015 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 9/21/2015 | | 9/21/2015 | | PASS |
Susan Riggs
|
|
|
new modification since previous 9-15-15.
Plans haven't changed since the 9-17-15 sign-off by Susan Riggs.
|
Plan Modification Accepted | | | 9/18/2015 | | DONE |
|
|
|
received modified Manual D&J, Engineering letter, Erosion & Sediment Control plan and complete set of structural plans
|
Routing - PLANNING | | | 9/17/2015 | | PASS |
Susan Riggs
|
|
|
Added closet off bath are rear of home, outside of the setback.
|
Plan Modification Accepted | | | 9/15/2015 | | DONE |
|
|
|
|
BLD-Wall Bracing | 9/9/2015 | 9/10/2015 | 9/10/2015 | A | FAIL |
Tony Young
|
|
|
Justin Phone #: ###-####,, correction posted
|
BLD-Footing | 8/3/2015 | 8/3/2015 | 8/3/2015 | P | PASS |
Tony Young
|
|
|
customer said he is ready AM if possible. Phone #: ###-####
|
Routing PW Grading-Hillside | 8/3/2015 | | 8/3/2015 | | PASS |
Jim Wyllie
|
|
|
Received letter from geotechnical engineer approving footing subgrade. Okay to schedule a footing inspection.
Jim Wyllie / ###-####
|
BLD-Footing | 7/31/2015 | 7/31/2015 | 7/31/2015 | P | NR |
Tony Young
|
|
|
Pat Phone #: ###-####
|
Issue PAID IN FULL permit | | | 6/29/2015 | | DONE |
|
|
|
|
CHANGE ISSUED DATE | | | 6/29/2015 | | |
Rita DeYoung
|
|
|
|
OVERRIDE | | | 6/24/2015 | | |
|
|
|
|
Plan assigned to (AJS) | 6/24/2015 | 6/24/2015 | 6/24/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
6/15
|
Case Summary (BLD) | | | 6/24/2015 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
1st review completed | | | 6/24/2015 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/24/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/24/2015 | | DONE |
|
|
|
requirements met
|
Inspection Record Card- Bld | | | 6/24/2015 | | DONE |
|
|
|
|
Telephone call | | | 6/24/2015 | | DONE |
Christina Prado
|
|
|
Called Justin to advise permit is ready and gave fees due
|
Plan assigned to (LEG) Tisha | 5/27/2015 | | 6/24/2015 | | DEFR |
Tisha Gallop
|
|
|
6/15 L2
|
Routing - PLAN CHECK | 6/24/2015 | | 6/24/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - FIRE | 6/8/2015 | 5/27/2015 | 6/17/2015 | | PASS |
Katie Marron
|
|
|
No comments
|
Routing - Erosion and Sediment | 6/5/2015 | | 6/8/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
Permit for the construction of a new 1789 sq. ft., one story single family dwelling with 3 bedrooms, 2 bathrooms, approximately 175 sq. ft. of covered patio/porch and a 547 sq. ft. attached garage
|
Routing - MECHANICAL | 5/28/2015 | | 6/5/2015 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 5/28/2015 | | 5/28/2015 | | PASS |
Susan Riggs
|
|
|
|
Routing - Addressing | 5/27/2015 | | 5/28/2015 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | 5/28/2015 | | 5/28/2015 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Grading-Hillside | | | 5/28/2015 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Plans ACCEPTED BY PLAN TECH | | | 5/27/2015 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 5/27/2015 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/27/2015 | | DONE |
Christina Prado
|
|
|
|
Application received | | 5/27/2015 | | | |
|
|
|
|