BLD-Final | 9/14/2016 | 9/15/2016 | 9/15/2016 | A | PASS |
Dave Hannah
|
|
|
Roger Phone #: ###-####
|
DOC - Permit Finaled | 9/15/2016 | 9/15/2016 | 9/15/2016 | P | PASS |
Dave Hannah
|
|
|
|
PubWorks Occupancy Approval | 9/14/2016 | 9/14/2016 | 9/14/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Final | 8/23/2016 | 8/23/2016 | 8/23/2016 | P | NR |
Dave Hannah
|
|
|
John Phone #: ###-#### needs hillside signoff
|
BLD-Foundation | 6/1/2016 | 6/1/2016 | 6/1/2016 | P | PASS |
Phil Shearer
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Foundation | 6/1/2016 | 6/1/2016 | 6/1/2016 | A | NR |
Dave Hannah
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 5/30/2016 | 5/31/2016 | 5/31/2016 | A | PASS |
Phil Shearer
|
|
|
Phone #: 2086671241 >> Inspection requested via mobile web by Heron
|
BLD-Energy code compliance | 2/5/2016 | 2/8/2016 | 2/8/2016 | A | PASS |
Dave Hannah
|
|
|
John Phone #: ###-####
|
BLD-Conference | 1/28/2016 | 1/29/2016 | 1/29/2016 | A | PASS |
Phil Shearer
|
|
|
John Phone #: ###-####. Can light boxes OK
|
BLD-Framing/Rough-in | 1/13/2016 | 1/13/2016 | 1/13/2016 | P | PASS |
Dave Hannah
|
|
|
John Phone #: ###-####
|
Plan Modification Accepted | | | 12/14/2015 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 12/14/2015 | | 12/14/2015 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Foundation | 10/9/2015 | 10/9/2015 | 10/9/2015 | P | PASS |
Phil Shearer
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Foundation | 10/9/2015 | 10/9/2015 | 10/9/2015 | A | NR |
Phil Shearer
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Foundation | 9/2/2015 | 9/2/2015 | 9/2/2015 | A | PASS |
Dave Hannah
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 8/17/2015 | 8/17/2015 | 8/18/2015 | P | PASS |
Dave Hannah
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 8/17/2015 | 8/17/2015 | 8/17/2015 | A | NR |
Dave Hannah
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 8/14/2015 | 8/14/2015 | 8/14/2015 | P | NR |
Dave Hannah
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
PubWorks Subgrade Approval | 8/4/2015 | 8/4/2015 | 8/4/2015 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
OVERRIDE | | | 7/16/2015 | | |
|
|
|
|
Plan assigned to (CDM) | 7/1/2015 | 7/1/2015 | 7/16/2015 | | PASS |
Carl D Madsen
|
|
|
First review completed
|
Plan assigned to (CDM) | 6/24/2015 | 6/24/2015 | 7/16/2015 | | PASS |
Carl D Madsen
|
|
|
6/15 First review completed
|
Routing - PLAN CHECK | 7/16/2015 | | 7/16/2015 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/16/2015 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 7/16/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/16/2015 | | DONE |
|
|
|
ALL REQUIREMENTS MET
|
Inspection Record Card- Bld | | | 7/16/2015 | | DONE |
|
|
|
|
Telephone call | | | 7/16/2015 | | DONE |
|
|
|
called John- left message that permit is ready for pick up and fees due
|
Issue PAID IN FULL permit | | | 7/16/2015 | | DONE |
|
|
|
|
Plan resubmittals received | | | 7/1/2015 | | DONE |
|
|
|
received; (2) sets of plans- (A-3.0,A-3.1,A-4.0)
|
Routing - PLAN CHECK | 6/22/2015 | | 6/24/2015 | | FAIL |
Carl D Madsen
|
|
|
E-Mail sent to John Ryan 6-24-15
|
1st review completed | | | 6/24/2015 | | FAIL |
|
|
|
|
Plan assigned to (LEG) Tisha | 5/27/2015 | | 6/24/2015 | | DEFR |
Tisha Gallop
|
|
|
6/15 L2 First review completed.
|
Routing - FIRE | 6/8/2015 | | 6/22/2015 | | PASS |
Katie Marron
|
|
|
No comments
|
1st review completed | | | 6/22/2015 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 6/5/2015 | | 6/8/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
**POOL NOT INCLUDED IN THIS PERMIT***Permit for the construction of a new 3,650 sq. ft., two story (main level 2,081 sq. ft., finished basement 1,569 sq. ft.) single family dwelling with 5 bedrooms, 4 bathrooms, approximately 488 sq. ft. of covered patio/porch and a 852 sq. ft. attached garage
|
Routing - MECHANICAL | | | 6/5/2015 | | PASS |
|
|
|
|
Routing - PLANNING | 5/28/2015 | | 6/1/2015 | | PASS |
Leon Letson
|
|
|
Applicant must submit a letter from the El Paseo HOA indicating that Common Lot 5 of Block 1 of Boulder Heights Estates Subdivision #1 can be maintained by the home owners as part of the required defensible space.
|
Routing - Addressing | 5/27/2015 | | 5/28/2015 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | 5/28/2015 | | 5/28/2015 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Grading-Hillside | | | 5/28/2015 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Plans ACCEPTED BY PLAN TECH | | | 5/27/2015 | | DONE |
|
|
|
|
Intake Approval | | | 5/27/2015 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/27/2015 | | DONE |
|
|
|
|
Application received | | 5/27/2015 | | | |
|
|
|
|
Routing - PLAN CHECK | 5/27/2015 | | | | |
Tisha Gallop
|
|
|
|