Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD15-01789
StatusFinaled
Name FALASH & ROSS CONSTRUCTION
Site Address 250 E PARKCENTER BLVD
Project NameAlbertsons G.O. 2nd Phase 2
Customer Number 
ePlanReviewYes
Description
(ALBERTSON'S GENERAL OFFICE)(SECOND FLOOR PHASE 2) This building is fully fire sprinklered for area increase and has 60 ft yards on all sides for unlimited area. Permit to renovate the approx. 30,000 sq ft of existing SW office space. Scope of work to include minor demolitions as shown on approved plans, new interior nonbearing partition walls to create new offices and add new systems furniture to open work space. New finishes shall meet IBC chapter 8. New lighting to be installed, the mechanical system will remain and be modified to accommodate the new layout. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. The entire buildng except for the atrium has had the sprinkler heads upgraded to QR heads under FIR07-01005. No rated corridors are required under current code with upgraded spirinkler heads. **ajs**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Telephone call  12/22/2015 DONE
Left a message with the secretary to have Mike give me a call back about the three permits for albertsons
Telephone call  12/10/2015 DONE
Left a message for Mike to give me a call back so that we can figure out the values that were given for the MEC's on final value but no permits were pulled
Print Statement  11/23/2015 DONE
First Notice10/19/201510/19/201511/9/2015 DONE
DetailsJim Storey
Mailed 11-10-15
BLD-Final10/16/201510/19/201510/19/2015APASS
DetailsJim Storey
Gil Phone #: ###-####
DOC - Permit Finaled10/19/201510/19/201510/19/2015PPASS
DetailsJim Storey
FIRE-Final Inspection10/14/201510/15/201510/14/2015APASS
DetailsJim Page
Life fire safety passed/complete
BLD-Ceiling Grid Inspection8/14/20158/17/20158/17/2015APASS
DetailsJim Storey
15 minute call before // Gill Phone #: ###-####
BLD-Framing/Rough-in7/31/20157/31/20157/31/2015PPASS
DetailsDave Hannah
Call before to get inside // Gil Phone #: ###-####
BLD-Framing/Rough-in6/30/20156/30/20156/30/2015PPASS
DetailsJim Storey
Gil Phone #: ###-####
Issue PAID IN FULL permit  6/4/2015 DONE
DetailsChristina Prado
Inspection Record Card- Bld  6/4/2015 DONE
DetailsChristina Prado
Plan assigned to (AJS)5/29/20155/29/20156/1/2015 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed Albertson's
Routing - PLAN CHECK5/29/2015 6/1/2015 FAIL
DetailsAdele J Schaffeld-Griffin
1st review completed  6/1/2015 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - PLAN CHECK6/1/2015 6/1/2015 PASS
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  6/1/2015 DONE
Permit Ready to Issue  6/1/2015 DONE
need GC and rev cert of val/// Requirements met 6-3-15 KRS
Routing - Addressing5/29/2015 5/29/2015 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS5/29/2015 5/29/2015 PASS
DetailsJennifer Bruner
Intake Approval  5/29/2015 PASS
DetailsAdele J Schaffeld-Griffin
Application received  5/28/2015 DONE
Application submitted via PDS Online on May 28 2015 4:22PM