CHANGE STATUS TO (ISS) | | | 9/18/2015 | | DONE |
Christina Prado
|
|
|
corrected status
|
BLD-Foundation | 7/8/2015 | 7/8/2015 | 7/8/2015 | P | DONE |
Tony Young
|
|
|
John Phone #: ###-####
|
BLD-Wall cover | 7/7/2015 | 7/8/2015 | 7/8/2015 | A | PART |
Tony Young
|
|
|
John Phone #: ###-####,, garage front has no room as the plan denotes,, all other brace panels and hold downs per plan
|
BLD-Footing | 7/6/2015 | 7/6/2015 | 7/6/2015 | P | PASS |
Tony Young
|
|
|
John Phone #: ###-####
|
Issue PAID IN FULL permit | | | 7/2/2015 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 7/1/2015 | 7/1/2015 | 7/1/2015 | P | PASS |
Matthew A Halitsky
|
|
|
Shore up garage only.
|
Routing Walk-In (BLD) | 7/1/2015 | 7/1/2015 | 7/1/2015 | P | PASS |
Tisha Gallop
|
|
|
|
Plan assigned to (LEG) Tisha | 7/1/2015 | | 7/1/2015 | | DONE |
Tisha Gallop
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/1/2015 | | DONE |
Tisha Gallop
|
|
|
|
Inspection Record Card- Bld | | | 7/1/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/1/2015 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 7/1/2015 | | DONE |
Christina Prado
|
|
|
Need GC infor for issuance
|
BLD-Conference | 6/11/2015 | 6/11/2015 | 6/11/2015 | A | PASS |
Bob Archibald
|
|
|
Conference with Larry Sundell (architect) on scope of work required for garage upgrade. Footings, hold downs and wall bracing upgrade will be required. All work will be performed on interior of structure.
|
Application received | | | 5/29/2015 | | DONE |
|
|
|
Application submitted via PDS Online on May 29 2015 8:09AM
|
Routing - PLAN CHECK | 5/29/2015 | | 5/29/2015 | | FAIL |
Tisha Gallop
|
|
|
|
1st review completed | | | 5/29/2015 | | FAIL |
Tisha Gallop
|
|
|
|