Second Notice | | 10/22/2015 | 10/19/2015 | | DONE |
|
|
|
This permit finaled on the web by Brian McCoy
|
First Notice | | 10/9/2015 | 10/12/2015 | | DONE |
|
|
|
Mailed 10-13-15
|
BLD-Final | 9/28/2015 | 9/29/2015 | 9/29/2015 | A | PASS |
Jim Storey
|
|
|
Doug Phone #: ###-####
|
Permanent Occupancy | | | 9/29/2015 | | DONE |
|
|
|
|
FIRE-Final Inspection | 9/25/2015 | 9/28/2015 | 9/28/2015 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
Zoning Approval | 9/25/2015 | 9/25/2015 | 9/25/2015 | | PASS |
Josh Wilson
|
|
|
|
BLD-Ceiling Grid Inspection | 9/17/2015 | 9/17/2015 | 9/17/2015 | P | PASS |
Jim Storey
|
|
|
Doug Phone #: ###-####
|
BLD-Framing/Rough-in | 8/18/2015 | 8/18/2015 | 8/18/2015 | P | PASS |
Jim Storey
|
|
|
Doug Phone #: ###-####
|
BLD-Foundation | 8/17/2015 | 8/17/2015 | 8/17/2015 | P | PASS |
Jim Storey
|
|
|
Rebar// Corwin Phone #: ###-####
|
BLD-Footing | 8/11/2015 | 8/12/2015 | 8/12/2015 | A | PASS |
Jim Storey
|
|
|
Korwin Phone #: ###-####
|
BLD-Footing | 7/30/2015 | 8/5/2015 | 8/5/2015 | P | PASS |
Jim Storey
|
|
|
Change time and day per Corwin Phone #: ###-####
|
Issue PAID IN FULL permit | | | 7/8/2015 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/8/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 6/22/2015 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/22/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/22/2015 | | DONE |
|
|
|
***ALL REQUIREMENTS MET*** Need GC Form, Revised Cert of Value and RP
|
Routing - Erosion and Sediment | 6/22/2015 | | 6/22/2015 | | PASS |
Evan Jenkins
|
|
|
(UNIFIRST) Permit is to remodel an existing 9,830 square foot office warehouse space for a new tenant. This space was created after a permit for “Idaho Youth Ranch” expanded into one half of the previously existing space.
|
Routing - Design Review | 6/22/2015 | | 6/22/2015 | | PASS |
Josh Wilson
|
|
|
Ok per CZC15-00156
|
Plan assigned to (TLW) | 5/29/2015 | | 6/22/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 5/29/2015 | | 6/19/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLUMBING | 5/29/2015 | | 6/19/2015 | | PASS |
Daryl Spivey
|
|
|
Approved in e-plan. TLW
|
1st review completed | | | 6/19/2015 | | DONE |
|
|
|
|
Routing - FIRE | 6/5/2015 | | 6/19/2015 | | PASS |
Katie Marron
|
|
|
Comments attached to case
|
Application received | | | 5/29/2015 | | DONE |
|
|
|
Application submitted via PDS Online on May 29 2015 10:20AM
|
Intake Approval | | | 5/29/2015 | | PASS |
|
|
|
|
Pending Assignment by TLW | 5/29/2015 | | 5/29/2015 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - Design Review | 5/29/2015 | | 5/29/2015 | | PASS |
Sarah Schafer
|
|
|
NO DR. - A zoning certificate is required for the addition of the loading dock and the stair. Office space is at 24% which is allowed as accessory through the ordinance. I called Matt Rhees to let him know the CZC was required.
|
Routing - Addressing | 5/29/2015 | | 5/29/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 5/29/2015 | | 5/29/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Erosion and Sediment | 5/29/2015 | | 5/29/2015 | | FAIL |
Evan Jenkins
|
|
|
ESC Waiver Request Letter Required for Approval:
Especially due to the fact the saw cutting in prep for a new Concrete Loading Dock and Ramp. Evan Jenkins 794.3958
|
Routing PW Sewer Rating | 5/29/2015 | | 5/29/2015 | | PASS |
Jennifer Bruner
|
|
|
|