BLD-Final | 7/31/2015 | 8/3/2015 | 8/3/2015 | A | DONE |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Beck
|
DOC - Permit Finaled | 8/3/2015 | 8/3/2015 | 8/3/2015 | P | PASS |
Tony Young
|
|
|
done
|
BLD-Final | 7/31/2015 | 7/31/2015 | 7/31/2015 | P | PEND |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Beck,, ok pending public works
|
BLD-Final | 7/30/2015 | 7/31/2015 | 7/31/2015 | A | PEND |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Beck
|
BLD-Final | 7/30/2015 | 7/30/2015 | 7/30/2015 | P | PEND |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Beck,, need to see if public works needs to sign off 1st
|
BLD-Final | 7/29/2015 | 7/30/2015 | 7/30/2015 | A | PEND |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Beck,, needs final hillside approval from public works
|
BLD-Foundation | 6/18/2015 | 6/19/2015 | 6/19/2015 | A | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Ben Sears
|
Case Summary (BLD) | | | 6/11/2015 | | DONE |
Javier Guzman
|
|
|
|
Plan Reviewer's activity | | | 6/11/2015 | | DONE |
Javier Guzman
|
|
|
plans were resubmitted to show the placement of a moisture barrier between the non-treated wood and the concrete wall on 6/11/2015 and uploaded into the case documents **JG**
|
BLD-Footing | 6/9/2015 | 6/10/2015 | 6/10/2015 | A | PART |
Jim Storey
|
|
|
Beck Phone #: ###-#### ft ok c/n isued
|
PubWorks Subgrade Approval | 6/10/2015 | 6/10/2015 | 6/10/2015 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical/civil engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 6/3/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 6/2/2015 | | |
|
|
|
|
Telephone call | | | 6/2/2015 | | DONE |
|
|
|
called Gary to let know permit is ready and how much is owed
|
Permit Ready to Issue | | | 6/2/2015 | | DONE |
|
|
|
requirements met
|
1st review completed | | | 6/2/2015 | | DONE |
Javier Guzman
|
|
|
|
Inspection Record Card- Bld | | | 6/2/2015 | | DONE |
Javier Guzman
|
|
|
|
Case Summary (BLD) | | | 6/2/2015 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/2/2015 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 6/2/2015 | | 6/2/2015 | | PASS |
Evan Jenkins
|
|
|
Permit is for the engineered retaining wall per the attached engineering, all work to be per the attached engineering, approved plans and current local codes
|
Routing Walk-In (PW Hillside) | 5/29/2015 | 5/29/2015 | 6/1/2015 | P | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Routing Walk-In (Zoning) | 5/29/2015 | 5/29/2015 | 5/29/2015 | P | PASS |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 5/29/2015 | 5/29/2015 | 5/29/2015 | P | PASS |
Javier Guzman
|
|
|
|
Application received | | 5/29/2015 | | | |
|
|
|
|
Routing - FRONT DESK | 6/2/2015 | | | | |
|
|
|
|