Permit Information
Permit NumberBLD15-01806
StatusFinaled
Name ROCK SOLID CIVIL
Site Address 270 N 27TH ST
Project NameRock Solid Civil
Customer Number 
ePlanReviewNo
Description
(ROCK SOLID CIVIL – FIRST STORY – NORTH END) This building does not have a fire sprinkler system. Application for inspection to determine the requirements for the issuance of a Certificate of Occupancy for a 810 square foot office space located on the 1st story (lower level) within an existing 5,240 square foot, 2 story office building (2,620 square feet each story). No new work is authorized under this permit. Compliance with the items listed in the plan review report under Code Notes is required because noncompliance with these items is believed to constitute a distinct hazard to life or property. No change of occupancy classification is allowed under this permit. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy  2/12/2016 DONE
BLD-Final2/10/20162/10/20162/10/2016PPASS
DetailsDave Hannah
derritt Phone #: ###-####
FIRE-Final Inspection2/9/20162/9/20162/9/2016PPASS
DetailsJim Page
Previously noted items corrected/repaired. No fire sprinklers, no fire alarms, fire extinuishers have current inspection tag. Life fire safety inspection passed/complete
BLD-Final8/5/20158/12/20158/18/2015PPEND
DetailsDave Hannah
Jim// please call before Phone #: ###-#### ok after fire finals
FIRE-Final Inspection8/5/20158/12/20158/12/2015AFAIL
DetailsJim Page
Fire extinguisher needs to be inspected, tag on extinguisher shows the year 2000 as the last inspection year. Need to have property manager verify if tenant space is going to be labeled Suite C or Suite 100. Thumb turn deadblot needs to be replaced with double keyed deadbolt and a "Door to remain unlocked while space is occupied" sign installed.
Plan assigned to (CJW)5/29/20155/29/20158/5/2015 PASS
DetailsCarl Westfall
ROCK SOLID CIVIL (June 2 - 3 days) level 2 OAR - paper
Routing - PUBLIC WORKS8/4/2015 8/5/2015 PASS
DetailsJennifer Bruner
Routing - PLAN CHECK8/5/2015 8/5/2015  
DetailsCarl Westfall
Routing completed
PLANS/APPL TAKEN TO FRONT DESK  8/5/2015 DONE
Telephone call  8/5/2015 DONE
Left a message for Jim informing him that the occupancy permit is ready to be picked up.
Permit Ready to Issue  8/5/2015 DONE
ALL REQUIREMENTS MET
Print Occupancy Form  8/5/2015 DONE
Issue PAID IN FULL permit  8/5/2015 DONE
Routing - Addressing7/24/2015 8/4/2015 PASS
DetailsJason C. Taylor
Assigned new suites to building. Jason Taylor ###-####
1st review completed  7/23/2015 FAIL
Addressing not approved the 1st time.
Routing - PLAN CHECK7/21/2015 7/23/2015 PASS
DetailsCarl Westfall
This project was in PW for awhile.
Routing - PUBLIC WORKS6/4/2015 7/21/2015 FAIL
DetailsJennifer Bruner
Plan Reviewer's activity  6/19/2015 DONE
Talked to Jason Taylor about the status of the routing. He will verify.
Routing - Addressing5/29/2015 6/4/2015 FAIL
DetailsJason C. Taylor
Called applicant, left mesage. Suites need changed to numerical digits from alphanumeric digits. Jason Taylor ###-####.
Plans ACCEPTED BY PLAN TECH  5/29/2015 DONE
Intake Approval  5/29/2015 PASS
Recd Pcfee & Taken To Pln CK  5/29/2015 DONE
First Notice 2/22/2016   
Application received 5/29/2015