BLD-Aging Inspection | 5/22/2020 | 5/22/2020 | 5/22/2020 | | CANC |
Tell Riley
|
|
|
|
BLD-Aging Inspection | 5/21/2020 | 5/21/2020 | 5/22/2020 | | PEND |
Tell Riley
|
|
|
no activity//
|
BLD-Framing/Rough-in | 1/8/2020 | 1/8/2020 | 1/8/2020 | P | PART |
Brandon Shaw
|
|
|
Up stairs laundry room, Ok to cover, pending mech approval...
|
Routing Walk-In (BLD) | 1/8/2020 | 1/8/2020 | 1/8/2020 | A | PASS |
Jenny Nelson
|
|
|
|
Case Summary (BLD) | | | 1/8/2020 | | DONE |
Jenny Nelson
|
|
|
|
Routing - PLAN CHECK | 1/8/2020 | | 1/8/2020 | | PASS |
Jenny Nelson
|
|
|
Plan modification pass - 1 hour plan mod fee
|
Permit Ready to Issue | | | 1/8/2020 | | DONE |
|
|
|
plan mod approved
|
CHANGE STATUS TO (ISS) | | | 1/8/2020 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 12/5/2019 | 12/5/2019 | 12/5/2019 | A | FAIL |
Brian McGowan
|
|
|
submitting plans
|
Meeting | | | 12/5/2019 | | DONE |
|
|
|
Per Bob A conference on 12/4/19 permit could be reactivated with original approved plans and for 1/2 permit original fee.
|
Change Expiration Date Only | | | 12/5/2019 | | DONE |
|
|
|
|
BLD-Conference | 12/4/2019 | 12/4/2019 | 12/4/2019 | P | DONE |
Bob Archibald
|
|
|
Phone conference with Shawn informing him that permit could be reactivated with original approved plans and for 1/2 permit original fee. As only a footing inspection was performed all required code inspections must be verified/performed and trade inspections passed (stud framing must be visible).
|
Routing Walk-In (BLD) | 11/26/2019 | 11/26/2019 | 11/26/2019 | A | FAIL |
Brian McGowan
|
|
|
Had questions on continuing to remodel/final permit BLD15-01818 even though he does not live in the home anymore. The existin permit did not have all the required inspections logged into Tidemark. He says he has the approval stickers.
I am refering him to Bob Archibald for further help.
|
Routing Walk-In (BLD) | 8/24/2017 | 8/24/2017 | 8/24/2017 | P | FAIL |
Brian McGowan
|
|
|
Needs to bring in drawings showing existing and proposed.
|
1st review completed | | | 8/24/2017 | | FAIL |
Brian McGowan
|
|
|
Needs to bring in drawings showing existing and proposed.
|
Routing - PLAN CHECK | 8/24/2017 | | 8/24/2017 | | FAIL |
Brian McGowan
|
|
|
Needs to bring in drawings showing existing and proposed.
|
BLD-Conference | 2/25/2016 | 2/25/2016 | 2/25/2016 | P | DONE |
Jim Sly
|
|
|
Shawn Phone #: ###-####
|
Routing Walk-In (BLD) | 2/10/2016 | 2/10/2016 | 2/10/2016 | P | PASS |
Brian McGowan
|
|
|
Added bathroom and a washer and dryer to uppler floor
|
(F) Reprint permit | | | 2/10/2016 | | DONE |
|
|
|
|
BLD-Conference | 1/21/2016 | 1/22/2016 | 1/22/2016 | A | DONE |
Jim Sly
|
|
|
Shawn Phone #: ###-####
|
BLD-Conference | 1/12/2016 | 1/12/2016 | 1/12/2016 | P | DONE |
Jim Sly
|
|
|
Shawn Phone #: ###-####
|
BLD-Foundation | 1/11/2016 | 1/11/2016 | 1/11/2016 | P | PASS |
Jim Sly
|
|
|
Please call ahead for access - Shawn Phone #: ###-####
|
BLD-Conference | 1/6/2016 | 1/7/2016 | 1/7/2016 | A | PASS |
Jim Sly
|
|
|
Shawn Phone #: ###-#### OK to pour footing for Kitchen extension.
|
Plan assigned to (DAF) | 1/6/2016 | 1/6/2016 | 1/6/2016 | | DONE |
David Ferguson
|
|
|
|
Routing Walk-In (BLD) | 1/5/2016 | 1/5/2016 | 1/6/2016 | P | FAIL |
David Ferguson
|
|
|
Plans lacking detail. Sent applicant a letter of issues
|
Routing - PLAN CHECK | 1/6/2016 | | 1/6/2016 | | PASS |
David Ferguson
|
|
|
|
Inspection Record Card- Bld | | | 1/6/2016 | | DONE |
David Ferguson
|
|
|
|
Case Summary (BLD) | | | 1/6/2016 | | DONE |
David Ferguson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/6/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/6/2016 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 1/6/2016 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 1/5/2016 | 1/5/2016 | 1/5/2016 | P | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 6/1/2015 | 6/1/2015 | 6/1/2015 | A | FAIL |
Tisha Gallop
|
|
|
need legible plans, cross section, structural details, planning approval for duplex and 1-hr wall details.
|
1st review completed | | | 6/1/2015 | | FAIL |
Jason Blais
|
|
|
|
Application received | | 6/1/2015 | | | |
|
|
|
|