BLD-Aging Inspection | 1/26/2016 | 1/26/2016 | 2/1/2016 | | PASS |
Jim Sly
|
|
|
|
FIRE-Final Inspection | 9/14/2015 | 9/14/2015 | 9/14/2015 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
Issue PAID IN FULL permit | | | 7/9/2015 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/9/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 6/12/2015 | | |
|
|
|
|
Permit Ready to Issue | | | 6/12/2015 | | DONE |
|
|
|
Needs G.C. Form, Revised Certificate of Value, & Responsible Person-7-8-15 recevied rev cert of val CAN
|
1st review completed | | | 6/11/2015 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/11/2015 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 6/8/2015 | | 6/11/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 6/8/2015 | | 6/11/2015 | | PASS |
Tim L. Woodard
|
|
|
Approved with redlines about accessible route and existing Building on site needing finaled prior to Occupancy of this building. TLW
|
Routing - FIRE | 6/8/2015 | 6/8/2015 | 6/10/2015 | | PASS |
Katie Marron
|
|
|
No Comments
|
Routing PW Drainage | 6/8/2015 | | 6/9/2015 | | PASS |
Brian Murphy
|
|
|
|
Routing - Design Review | 6/8/2015 | | 6/8/2015 | | PASS |
Sarah Schafer
|
|
|
No planning approvals. TLW The steel canopy is allowed use as part of the park and is in a location meeting all setbacks. No design review application is needed because no design overlay is applied.
|
Routing - Addressing | 6/8/2015 | | 6/8/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 6/8/2015 | | 6/8/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Erosion and Sediment | 6/8/2015 | | 6/8/2015 | | PASS |
Evan Jenkins
|
|
|
Install 28' diameter, steel shelter near the garden in Comba Park.
|
Intake Approval | | | 6/8/2015 | | PASS |
|
|
|
|
Pending Assignment by TLW | 6/8/2015 | | 6/8/2015 | | DONE |
Tim L. Woodard
|
|
|
|
Intake Approval | | | 6/5/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
Please complete and upload the 502 check list. An any additional documents needed as noted on the check list such as fire flow and ESC requirements.
Please complete the 304 design professional form.
All drawings are required to be a minimum 18"x24".
Please provide the required stamping area on the drawings, see electronic submittal standards.
All drawings are required to be uploaded individually with conventional names such as A0.1 Cover Sheet.
All drawings are required to be uploaded to read left to right.
All drawings are required to be stamped by a design professional.
|
Recd Pcfee & Taken To Pln CK | | | 6/5/2015 | | DONE |
|
|
|
as per Rita DeYoung-Rita contacted Wendy for inner office payment
|
Application received | | | 6/3/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 3 2015 10:02AM
|