Permit Information
Permit NumberBLD15-01864
StatusIssued
Name PANORAMA CONSTRUCTION
Site Address 2995 N FIVE MILE RD
Project NameComba Park Shelter
Customer Number 
ePlanReviewYes
Description
(COMBA PARK – Open Park shelter / Gazebo) Permit is to add a 28 ft. diameter gazebo open structure. Approval contingent upon adhering to the approved plans on file. Work to include: construction of foundation, installation of prefabricated steel structure, and related site improvements. This building is not fire sprinklered. NOTE: A Certificate of Occupancy cannot be issued unless an approved “Accessible route” is installed to the new shelter. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection1/26/20161/26/20162/1/2016 PASS
DetailsJim Sly
FIRE-Final Inspection9/14/20159/14/20159/14/2015PPASS
DetailsTroy Cobbley
life safety passed
Issue PAID IN FULL permit  7/9/2015 DONE
Print Occupancy Form  7/9/2015 DONE
OVERRIDE  6/12/2015  
Permit Ready to Issue  6/12/2015 DONE
Needs G.C. Form, Revised Certificate of Value, & Responsible Person-7-8-15 recevied rev cert of val CAN
1st review completed  6/11/2015 DONE
PLANS/APPL TAKEN TO FRONT DESK  6/11/2015 DONE
Plan assigned to (TLW)6/8/2015 6/11/2015 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK6/8/2015 6/11/2015 PASS
DetailsTim L. Woodard
Approved with redlines about accessible route and existing Building on site needing finaled prior to Occupancy of this building. TLW
Routing - FIRE6/8/20156/8/20156/10/2015 PASS
DetailsKatie Marron
No Comments
Routing PW Drainage6/8/2015 6/9/2015 PASS
DetailsBrian Murphy
Routing - Design Review6/8/2015 6/8/2015 PASS
DetailsSarah Schafer
No planning approvals. TLW The steel canopy is allowed use as part of the park and is in a location meeting all setbacks. No design review application is needed because no design overlay is applied.
Routing - Addressing6/8/2015 6/8/2015 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS6/8/2015 6/8/2015 PASS
DetailsJennifer Bruner
Routing - Erosion and Sediment6/8/2015 6/8/2015 PASS
DetailsEvan Jenkins
Install 28' diameter, steel shelter near the garden in Comba Park.
Intake Approval  6/8/2015 PASS
Pending Assignment by TLW6/8/2015 6/8/2015 DONE
DetailsTim L. Woodard
Intake Approval  6/5/2015 FAIL
DetailsAdele J Schaffeld-Griffin
Please complete and upload the 502 check list. An any additional documents needed as noted on the check list such as fire flow and ESC requirements.
Please complete the 304 design professional form.
All drawings are required to be a minimum 18"x24".
Please provide the required stamping area on the drawings, see electronic submittal standards.
All drawings are required to be uploaded individually with conventional names such as A0.1 Cover Sheet.
All drawings are required to be uploaded to read left to right.
All drawings are required to be stamped by a design professional.
Recd Pcfee & Taken To Pln CK  6/5/2015 DONE
as per Rita DeYoung-Rita contacted Wendy for inner office payment
Application received  6/3/2015 DONE
Application submitted via PDS Online on Jun 3 2015 10:02AM