Permit Information
Permit NumberBLD15-01869
StatusFinaled
Name LAYTON CONSTRUCTION
Site Address 11196 W FAIRVIEW AVE
Project NameLarry H. Miller Boise Subaru
Customer Number 
ePlanReviewYes
Description
(Larry H. Miller Boise Subaru) Permit to construct a new 39,000 square foot two story automobile dealership. The second floor is 2,098 square feet. This building is fire sprinklered with a NFPA 13 system for Unlimited Area Building provisions (Section 507.4 / 2012 IBC). Work to include: new foundation, new exterior walls, new roof construction, new interior walls to define spaces as noted on approved plans, new electrical, new mechanical, new plumbing, new interior finishes, new equipment, and related site improvments. This building is required to be fully fire spinklered in accordance with NFPA 13 and alarmed in accordance with NFPA 72. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 11/12/201811/19/2018 DONE
This permit finaled on the web by Jeff Miller
Second Notice 10/22/201811/7/2018 DONE
mailed 11-12
First Notice 10/4/201810/12/2018 DONE
mailed 10-12-18
Permanent Occupancy  9/24/2018 DONE
BLD-Final8/28/20188/29/20188/29/2018APASS
DetailsJim Sly
Quinton Phone #: ###-####
OK for Perm Occ.
FIRE-Final Inspection8/28/20188/28/20188/28/2018PPASS
DetailsTroy Cobbley
Life safety passed. FIre pump and building expansion covered under new permits


Quentin Phone #: ###-####
Temporary Occupancy8/28/201811/26/20188/28/2018 DONE
DetailsCandy A. Nichols
Jason B ok'd 30 day ext on Temp C of O
Telephone call  8/27/2018 DONE
sent email to Quinton B about the tmep c of o expiring today
Telephone call  8/23/2018 DONE
called Quinton to remind him about the temp c of o that will expire on 8/27/18-he will call or email Jasom Blais
Telephone call  5/29/2018 DONE
Jason B ok'd ext on temp c of o for 90 days 8/27/18
Telephone call  5/22/2018 DONE
emailed dminegar@laytonconstruction.com to let know temp c of o expired 5/18 and htey need to final the permit or extend the temp c of o
Temporary Occupancy3/9/20186/7/20183/9/2018 DONE
DetailsCandy A. Nichols
Jason B ok'd ext
Telephone call  3/7/2018 DONE
sent email to David asking if he can help with getting either an extension for this permit or call in the final
Telephone call  3/7/2018 DONE
emailed Quinton that the other permit BLD17-02975 may not be picked up by McAlvain for a while so they need to request an extension on the temp c of o
Telephone call  2/14/2018 DONE
called to let know temp c of o will expire on 2/18/18-left message on the main line at Layton Construction
BLD-Final12/1/201712/1/201712/3/2017PPEND
DetailsJim Sly
See Fire.........
Temporary Occupancy11/20/20172/18/201811/20/2017 DONE
DetailsCandy A. Nichols
as per Jason B-ok to extend Temp C of O for 90 days
Telephone call  11/15/2017 DONE
Jason emailed Quinton-he needs to request a extension or tey need to psyu and issue the other permit-see attached
Telephone call  11/6/2017 DONE
emailed dminegar@laytonconstruction.com to let know the temp c of o is going to expire on the 8th
BLD-Aging Inspection9/6/20179/6/20179/14/2017 CANC
DetailsJim Sly
Temporary Occupancy8/10/201711/8/20178/10/2017 DONE
DetailsCandy A. Nichols
Jason Blais ok'd temp c of o extension good threw 11/8/17
Telephone call  8/7/2017 DONE
called general mail box-left message that the temp c of o will expire on 8-10-17
Temporary Occupancy5/12/20178/10/20175/12/2017 DONE
DetailsChristina Prado
BLD-Aging Inspection5/9/20175/9/20175/9/2017 CANC
DetailsJim Sly
Temporary Occupancy6/8/20167/9/20165/8/2017 DONE
DetailsChristina Prado
Temp CO never formally requested in June 2016, 30day temp CO issued for documentation per the inspection results 6/8/2016
Print Occupancy Form  5/8/2017 DONE
DetailsChristina Prado
Case Summary (BLD)  5/8/2017 DONE
DetailsChristina Prado
FIRE-Conference8/15/20168/15/20168/15/2016PDONE
DetailsTroy Cobbley
Per Assistant Chief Ron Johnson the Temporary Occupancy is to continue until directed otherwise. Included is the email dated 8/15/16 giving current status.



From: Ronald Johnson
Sent: Monday, August 15, 2016 10:04 AM
To: Quinton Boyer
Cc: Tom Easton ; Randy Bowron ; Mike Bierman ; Tim Frost ; Scott Arellano ; Romeo Gervais
Subject: Fire Flow for Larry Miller Subaru



Mr. Boyer,



I met Suez Water field techs last week to witness a flow test at the fire hydrant at the northwest corner of Larry Miller Subaru. The results of the flow test are as follows.



Outlet: 4.5”, Discharge Coefficient .9

Static: 57

Pitot: 26

Residual: 45

Actual Flow: 2772 gpm

Flow at 20psi: 5092 gpm



The available fire flow as calculated using the flow test does not support a properly functioning fire sprinkler system as designed. I discussed these results with Suez and inquired if there would be any stability increase in the system in the near future. There are no plans for any improvements that would stabilize or increase the pressure in this area in the foreseeable future. Unfortunately, the sprinkler system for Larry Miller Subaru was designed using a fire flow that does not reflect the significant daily drop in pressure. This daily drop in pressure lasts several hours and is expected to occur at least 3.5 to 4 months of the year. If a fire were to occur in the building, the sprinkler system may not be sufficient to keep it in check or extinguish the fire during several hours of the day. I know this is very inconvenient and will likely be expensive to resolve, so I am open to a reasonable timeline for repairs. Please respond with a plan and proposed timeline. I am willing to discuss this and answer questions you and the owner may have by phone or in person. Would you mind forwarding owner contact information to me so I can contact them?



Regards,




cid:image001.jpg@01CE20C9.F3E72450

Ron Johnson

Division Chief – Assistant Fire Marshal

FIRE-Conference7/8/20167/8/20167/8/2016ADONE
DetailsTroy Cobbley
60 psi on the guage this morning
FIRE-Conference7/6/20167/7/20167/7/2016ADONE
DetailsTroy Cobbley
Pressure was 64psi this morning
FIRE-Conference7/6/20167/6/20167/6/2016ADONE
DetailsTroy Cobbley
Pressure was 62psi this morning
FIRE-Conference7/5/20167/5/20167/5/2016ADONE
DetailsTroy Cobbley
Reading on the guage this morning was 70psi
FIRE-Conference7/1/20167/1/20167/1/2016ADONE
DetailsTroy Cobbley
57psi on the guage this morning
FIRE-Conference6/30/20166/30/20166/30/2016ADONE
DetailsTroy Cobbley
Pressure this morning was 69psi
FIRE-Conference6/29/20166/29/20166/29/2016ADONE
DetailsTroy Cobbley
57psi on the guage at 7:00 am this morning
FIRE-Conference6/28/20166/28/20166/28/2016ADONE
DetailsTroy Cobbley
I witnessed 64psi at the base of riser.
FIRE-Conference6/28/20166/28/20166/28/2016ADONE
DetailsTroy Cobbley
This inspection actually occured on 6/27/16 where I witnessed pressure at the base of riser at 59psi
BLD-Final6/8/20166/8/20166/8/2016PPART
DetailsJim Sly
Quinton Phone #: ###-####
OK For Temp. Occ. OK for Perm Occ. when ACHD, Electrical, Mechanical, and the Three fire inspections are finaled.
BLD-Final6/8/20166/8/20166/8/2016APART
DetailsTroy Cobbley
Per the Fire Marshal, a TCO can be issued for the building permit (BLD15-01869) for the next 30 days. The static pressure at the base of the fire riser will need to be monitored and recorded over the next 30 days by the general contractor. These readings will be evaluated by the Fire Marshal at the end of the 30 days to determine if fire sprinkler system design changes will be necessary under (FIR15-00822) to accommodate the actual water supply available onsite.
PubWorks Occupancy Approval6/8/20166/8/20166/8/2016 DONE
DetailsTiffany Lowery
Meeting  6/7/2016 DONE
DetailsScott Arellano
Per the Fire Marshal, a TCO can be issued for the building permit (BLD15-01869) for the next 30 days. The static pressure at the base of the fire riser will need to be monitored and recorded over the next 30 days by the general contractor. These readings will be evaluated by the Fire Marshal at the end of the 30 days to determine if fire sprinkler system design changes will be necessary under (FIR15-00822) to accommodate the actual water supply available onsite.
BLD-Final6/2/20166/3/20166/3/2016ANR
DetailsJim Sly
Temp Final - Quinton Phone #: ###-####
FIRE-Final Inspection6/2/20166/3/20166/3/2016APART
DetailsTroy Cobbley
Temp 30 day Final - Quinton Phone #: ###-####
FIRE-Final Inspection6/1/20166/2/20166/2/2016AFAIL
DetailsTroy Cobbley
Need the project related fire sprinkler permit finaled prior to a life safety final being given. All other life safety items have been addressed.
BLD-Final6/1/20166/2/20166/2/2016PCANC
DetailsJim Sly
Layton Phone #: ###-####
Zoning Approval5/31/20165/31/20165/31/2016 PASS
DetailsJosh Wilson
PubWorks Occupancy Approval5/31/20165/31/20165/31/2016 DONE
DetailsJosh Wilson
FIRE-Conference5/26/20165/26/20165/26/2016PDONE
DetailsTroy Cobbley
For a final sign off the project related fire alarm and fire sprinkler permits need addressed. Fire alarm plans need resubmitted and notification tested. Fire sprinkler forward flow is only proving half of the required water for the system. For life safety the signage needs to be provided as discussed for the Oil Storage room.
BLD-Final5/25/20165/26/20165/26/2016PCANC
DetailsJim Sly
Cancele per Clayton Phone #: ###-####
FIRE-Final Inspection5/25/20165/25/20165/25/2016PFAIL
DetailsTroy Cobbley
Todays inspection I verified that the exit signs and emergency lights have been repaired/completed
FIRE-Final Inspection5/20/20165/24/20165/24/2016PCANC
DetailsTroy Cobbley
Clinton Phone #: ###-####
FIRE-Conference5/23/20165/23/20165/23/2016PDONE
DetailsTroy Cobbley
I performed a life safety inspection. I noted exit signs and emergency lights that are non functional, not all fire extinguishers are mounted and not all of the door hardware is installed. Emergency lights are missing at the east end of the show room, three thumbturn dead bolts need to be removed from office doors, address numbers on three sides of the building need installed, signage at facp/riser and electrical rooms needs installed.
FIRE-Conference4/29/20165/11/20165/11/2016ADONE
DetailsTroy Cobbley
Quinon and I went over general life safety requirements
FIRE-Conference4/29/20164/29/20164/29/2016PDONE
DetailsTroy Cobbley
The project superintendant and I spoke about general life safety requirements and he provided documentation that the wood sheating that had been installed above the showroom windows was fire treated.
BLD-Ceiling Grid Inspection4/28/20164/29/20164/29/2016APASS
DetailsJim Sly
CLINTON Phone #: ###-####
BLD-Energy code compliance3/17/20163/18/20163/18/2016APASS
DetailsJim Sly
Insulation // Clinton Phone #: ###-####
BLD-Framing/Rough-in3/17/20163/18/20163/18/2016APASS
DetailsJim Sly
Clinton Phone #: ###-####
BLD-Framing/Rough-in3/14/20163/15/20163/15/2016APART
DetailsJim Sly
Interior only, showroom - Quinton Phone #: ###-####
Everything except restrooms ......OK.
BLD-Framing/Rough-in2/29/20162/29/20162/29/2016PPART
DetailsJim Sly
Quiton-partial-exterior farming on radius wall Phone #: ###-####
Front radius soffit .....OK.
BLD-Foundation2/9/20162/9/20162/9/2016PPART
DetailsJim Sly
Quintin Phone #: ###-####
OK pending MTI special insp, tests and approvals.
BLD-Concrete2/9/20162/9/20162/9/2016PPART
DetailsJim Sly
service area; Quintin Phone #: ###-####
OK pending MTI special insp, tests and approvals.
Second Notice 12/20/20151/13/2016 DONE
Mailed 1-14-16
First Notice11/24/201511/24/201512/10/2015 DONE
DetailsJim Sly
Mailed 12-11-15
BLD-Other12/1/201512/3/201512/3/2015PPART
DetailsJim Sly
masonary grout pour (12ft lift on east side, 16ft lift west side), reinforced slab (showroom side slab area C ) - Clinton Phone #: ###-####
OK pending MTI specvial insp, tests and approvals.
BLD-Foundation11/23/201511/25/201511/25/2015APEND
DetailsDave Hannah
concrete pour, showroom ; Quintin Phone #: ###-####
BLD-Foundation11/23/201511/24/201511/24/2015PPART
DetailsJim Sly
grout, service side - 12'' tall lift ; Quintin Phone #: ###-####
MTI on site.
DOC - Permit Finaled11/24/201511/24/201511/24/2015PPASS
DetailsJim Sly
CHANGE STATUS TO (ISS)  11/24/2015 DONE
was dinaled by mistake
BLD-Foundation11/23/201511/23/201511/23/2015PPART
DetailsJim Sly
grout, service side - 8'' tall lift ; Quintin Phone #: ###-####
MTI on site.
BLD-Foundation11/19/201511/20/201511/20/2015APART
DetailsJim Sly
rebar; Quintin Phone #: ###-####
MTI on site.
BLD-Concrete11/2/201511/3/201511/4/2015PPART
DetailsJim Sly
showroom side, Grout, 2pm pour; Quintin Phone #: ###-####
OK pending MTI special insp, tests and approvals.
BLD-Footing10/28/201510/29/201510/29/2015APASS
DetailsJim Sly
exterior footing for showroom side (south side)Pouring at 3 - Quinton Phone #: ###-####
OK pending MTI special insp, tests and approvals.
BLD-Foundation10/27/201510/27/201510/27/2015PPART
DetailsMike Jordan
Quinten-as late as possible wants to pour at 7:00 AM tomorrow-interior footing on north side of the project Phone #: ###-####. INterior footings for service bay area. Work in progress, pending special inspection.
BLD-Foundation10/26/201510/26/201510/26/2015PPART
DetailsJim Sly
Quinten Phone #: ###-####
Grid line 3 and Int pads North of. OK pending MTI special inspections, tests and approvals.
BLD-Conference10/9/201510/9/201510/9/2015PDONE
DetailsJim Sly
Please call ahead to meet - Clinton Phone #: ###-####
Issue PAID IN FULL permit  10/7/2015 DONE
Print Occupancy Form  10/7/2015 DONE
Route to Impact Fee Review7/29/20158/3/20157/30/2015 PASS
DetailsCindy M. Gould
OVERRIDE  7/28/2015  
PLANS/APPL TAKEN TO FRONT DESK  7/28/2015 DONE
Case Summary (BLD)  7/28/2015 DONE
Permit Ready to Issue  7/28/2015 DONE
DetailsChristina Prado
All requirements met as of 10/6/15
Routing - Design Review7/27/2015 7/28/2015 PASS
DetailsSarah Schafer
Approved per version 2 C1.1 locations for display vehicles. Landscape and other plans must match the indicated display vehicle locations on this sheet.
Plan assigned to (TLW)6/12/2015 7/28/2015 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK7/17/2015 7/27/2015 PASS
DetailsTim L. Woodard
Routing Off Site - STRUCTURAL7/17/2015 7/27/2015 PASS
DetailsTim L. Woodard
Routing PW Environmental6/15/2015 7/10/2015 PASS
DetailsRick Christenson
2-2500 Gallon Interceptor Shown
1st review completed  7/10/2015 DONE
DetailsTim L. Woodard
Routing PW Solid Waste6/15/2015 7/9/2015 PASS
DetailsMegan Durrell
Approved in E-Plan Review. TLW
Routing PW Drainage6/15/2015 7/9/2015 PASS
DetailsBrian Murphy
Approved in E-Plan Review. TLW
Routing Off Site - STRUCTURAL6/12/2015 7/9/2015 FAIL
DetailsTim L. Woodard
Corrections attached
Routing - PLAN CHECK6/12/2015 7/9/2015 PASS
DetailsTim L. Woodard
Approved with markups in E-Plan Review. TLW
Routing - FIRE6/12/2015 6/23/2015 PASS
DetailsScott Arellano
Comments attached to case
Routing - MECHANICAL6/12/2015 6/17/2015 PASS
DetailsTroy James
Routing - PLUMBING6/12/2015 6/16/2015 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Routing - Erosion and Sediment6/12/2015 6/16/2015 PASS
DetailsEvan Jenkins
(Site Prep Inspection and Approval Required Prior to Any Earth Disturbing Activity

The Construction of a new 39,000 s.f. auto dealership building, parking lot and site improvements
Routing PW Sewer Rating6/15/2015 6/16/2015 PASS
DetailsJennifer Bruner
Routing - PUBLIC WORKS6/12/2015 6/15/2015 PASS
DetailsJennifer Bruner
Routing PW Street Lights6/15/2015 6/15/2015 PASS
DetailsMike D Hedge
No new streetl lighting required.
Routing PW Sewer Design6/15/2015 6/15/2015 PASS
DetailsKyle S. Rosenmeyer
Routing - PLANNING Land Div6/12/2015 6/15/2015 PASS
DetailsDave Abo
Parcel over 5 acres in size.
Routing - Design Review6/12/2015 6/15/2015 FAIL
DetailsJosh Wilson
Revise Sheet L1.1- vehicle display pads not allowed within 10 foot parking setback
Intake Approval  6/12/2015 PASS
Pending Assignment by TLW6/12/2015 6/12/2015 DONE
DetailsTim L. Woodard
Routing - Addressing6/12/2015 6/12/2015 PASS
DetailsEmily Dixon
Application received  6/3/2015 DONE
Application submitted via PDS Online on Jun 3 2015 10:56AM
Temporary Occupancy5/29/20188/27/2018