Third Notice | | 11/12/2018 | 11/19/2018 | | DONE |
|
|
|
This permit finaled on the web by Jeff Miller
|
Second Notice | | 10/22/2018 | 11/7/2018 | | DONE |
|
|
|
mailed 11-12
|
First Notice | | 10/4/2018 | 10/12/2018 | | DONE |
|
|
|
mailed 10-12-18
|
Permanent Occupancy | | | 9/24/2018 | | DONE |
|
|
|
|
BLD-Final | 8/28/2018 | 8/29/2018 | 8/29/2018 | A | PASS |
Jim Sly
|
|
|
Quinton Phone #: ###-#### OK for Perm Occ.
|
FIRE-Final Inspection | 8/28/2018 | 8/28/2018 | 8/28/2018 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. FIre pump and building expansion covered under new permits
Quentin Phone #: ###-####
|
Temporary Occupancy | 8/28/2018 | 11/26/2018 | 8/28/2018 | | DONE |
Candy A. Nichols
|
|
|
Jason B ok'd 30 day ext on Temp C of O
|
Telephone call | | | 8/27/2018 | | DONE |
|
|
|
sent email to Quinton B about the tmep c of o expiring today
|
Telephone call | | | 8/23/2018 | | DONE |
|
|
|
called Quinton to remind him about the temp c of o that will expire on 8/27/18-he will call or email Jasom Blais
|
Telephone call | | | 5/29/2018 | | DONE |
|
|
|
Jason B ok'd ext on temp c of o for 90 days 8/27/18
|
Telephone call | | | 5/22/2018 | | DONE |
|
|
|
emailed dminegar@laytonconstruction.com to let know temp c of o expired 5/18 and htey need to final the permit or extend the temp c of o
|
Temporary Occupancy | 3/9/2018 | 6/7/2018 | 3/9/2018 | | DONE |
Candy A. Nichols
|
|
|
Jason B ok'd ext
|
Telephone call | | | 3/7/2018 | | DONE |
|
|
|
sent email to David asking if he can help with getting either an extension for this permit or call in the final
|
Telephone call | | | 3/7/2018 | | DONE |
|
|
|
emailed Quinton that the other permit BLD17-02975 may not be picked up by McAlvain for a while so they need to request an extension on the temp c of o
|
Telephone call | | | 2/14/2018 | | DONE |
|
|
|
called to let know temp c of o will expire on 2/18/18-left message on the main line at Layton Construction
|
BLD-Final | 12/1/2017 | 12/1/2017 | 12/3/2017 | P | PEND |
Jim Sly
|
|
|
See Fire.........
|
Temporary Occupancy | 11/20/2017 | 2/18/2018 | 11/20/2017 | | DONE |
Candy A. Nichols
|
|
|
as per Jason B-ok to extend Temp C of O for 90 days
|
Telephone call | | | 11/15/2017 | | DONE |
|
|
|
Jason emailed Quinton-he needs to request a extension or tey need to psyu and issue the other permit-see attached
|
Telephone call | | | 11/6/2017 | | DONE |
|
|
|
emailed dminegar@laytonconstruction.com to let know the temp c of o is going to expire on the 8th
|
BLD-Aging Inspection | 9/6/2017 | 9/6/2017 | 9/14/2017 | | CANC |
Jim Sly
|
|
|
|
Temporary Occupancy | 8/10/2017 | 11/8/2017 | 8/10/2017 | | DONE |
Candy A. Nichols
|
|
|
Jason Blais ok'd temp c of o extension good threw 11/8/17
|
Telephone call | | | 8/7/2017 | | DONE |
|
|
|
called general mail box-left message that the temp c of o will expire on 8-10-17
|
Temporary Occupancy | 5/12/2017 | 8/10/2017 | 5/12/2017 | | DONE |
Christina Prado
|
|
|
|
BLD-Aging Inspection | 5/9/2017 | 5/9/2017 | 5/9/2017 | | CANC |
Jim Sly
|
|
|
|
Temporary Occupancy | 6/8/2016 | 7/9/2016 | 5/8/2017 | | DONE |
Christina Prado
|
|
|
Temp CO never formally requested in June 2016, 30day temp CO issued for documentation per the inspection results 6/8/2016
|
Print Occupancy Form | | | 5/8/2017 | | DONE |
Christina Prado
|
|
|
|
Case Summary (BLD) | | | 5/8/2017 | | DONE |
Christina Prado
|
|
|
|
FIRE-Conference | 8/15/2016 | 8/15/2016 | 8/15/2016 | P | DONE |
Troy Cobbley
|
|
|
Per Assistant Chief Ron Johnson the Temporary Occupancy is to continue until directed otherwise. Included is the email dated 8/15/16 giving current status.
From: Ronald Johnson Sent: Monday, August 15, 2016 10:04 AM To: Quinton Boyer Cc: Tom Easton ; Randy Bowron ; Mike Bierman ; Tim Frost ; Scott Arellano ; Romeo Gervais Subject: Fire Flow for Larry Miller Subaru
Mr. Boyer,
I met Suez Water field techs last week to witness a flow test at the fire hydrant at the northwest corner of Larry Miller Subaru. The results of the flow test are as follows.
Outlet: 4.5”, Discharge Coefficient .9
Static: 57
Pitot: 26
Residual: 45
Actual Flow: 2772 gpm
Flow at 20psi: 5092 gpm
The available fire flow as calculated using the flow test does not support a properly functioning fire sprinkler system as designed. I discussed these results with Suez and inquired if there would be any stability increase in the system in the near future. There are no plans for any improvements that would stabilize or increase the pressure in this area in the foreseeable future. Unfortunately, the sprinkler system for Larry Miller Subaru was designed using a fire flow that does not reflect the significant daily drop in pressure. This daily drop in pressure lasts several hours and is expected to occur at least 3.5 to 4 months of the year. If a fire were to occur in the building, the sprinkler system may not be sufficient to keep it in check or extinguish the fire during several hours of the day. I know this is very inconvenient and will likely be expensive to resolve, so I am open to a reasonable timeline for repairs. Please respond with a plan and proposed timeline. I am willing to discuss this and answer questions you and the owner may have by phone or in person. Would you mind forwarding owner contact information to me so I can contact them?
Regards,
cid:image001.jpg@01CE20C9.F3E72450 Ron Johnson
Division Chief – Assistant Fire Marshal
|
FIRE-Conference | 7/8/2016 | 7/8/2016 | 7/8/2016 | A | DONE |
Troy Cobbley
|
|
|
60 psi on the guage this morning
|
FIRE-Conference | 7/6/2016 | 7/7/2016 | 7/7/2016 | A | DONE |
Troy Cobbley
|
|
|
Pressure was 64psi this morning
|
FIRE-Conference | 7/6/2016 | 7/6/2016 | 7/6/2016 | A | DONE |
Troy Cobbley
|
|
|
Pressure was 62psi this morning
|
FIRE-Conference | 7/5/2016 | 7/5/2016 | 7/5/2016 | A | DONE |
Troy Cobbley
|
|
|
Reading on the guage this morning was 70psi
|
FIRE-Conference | 7/1/2016 | 7/1/2016 | 7/1/2016 | A | DONE |
Troy Cobbley
|
|
|
57psi on the guage this morning
|
FIRE-Conference | 6/30/2016 | 6/30/2016 | 6/30/2016 | A | DONE |
Troy Cobbley
|
|
|
Pressure this morning was 69psi
|
FIRE-Conference | 6/29/2016 | 6/29/2016 | 6/29/2016 | A | DONE |
Troy Cobbley
|
|
|
57psi on the guage at 7:00 am this morning
|
FIRE-Conference | 6/28/2016 | 6/28/2016 | 6/28/2016 | A | DONE |
Troy Cobbley
|
|
|
I witnessed 64psi at the base of riser.
|
FIRE-Conference | 6/28/2016 | 6/28/2016 | 6/28/2016 | A | DONE |
Troy Cobbley
|
|
|
This inspection actually occured on 6/27/16 where I witnessed pressure at the base of riser at 59psi
|
BLD-Final | 6/8/2016 | 6/8/2016 | 6/8/2016 | P | PART |
Jim Sly
|
|
|
Quinton Phone #: ###-#### OK For Temp. Occ. OK for Perm Occ. when ACHD, Electrical, Mechanical, and the Three fire inspections are finaled.
|
BLD-Final | 6/8/2016 | 6/8/2016 | 6/8/2016 | A | PART |
Troy Cobbley
|
|
|
Per the Fire Marshal, a TCO can be issued for the building permit (BLD15-01869) for the next 30 days. The static pressure at the base of the fire riser will need to be monitored and recorded over the next 30 days by the general contractor. These readings will be evaluated by the Fire Marshal at the end of the 30 days to determine if fire sprinkler system design changes will be necessary under (FIR15-00822) to accommodate the actual water supply available onsite.
|
PubWorks Occupancy Approval | 6/8/2016 | 6/8/2016 | 6/8/2016 | | DONE |
Tiffany Lowery
|
|
|
|
Meeting | | | 6/7/2016 | | DONE |
Scott Arellano
|
|
|
Per the Fire Marshal, a TCO can be issued for the building permit (BLD15-01869) for the next 30 days. The static pressure at the base of the fire riser will need to be monitored and recorded over the next 30 days by the general contractor. These readings will be evaluated by the Fire Marshal at the end of the 30 days to determine if fire sprinkler system design changes will be necessary under (FIR15-00822) to accommodate the actual water supply available onsite.
|
BLD-Final | 6/2/2016 | 6/3/2016 | 6/3/2016 | A | NR |
Jim Sly
|
|
|
Temp Final - Quinton Phone #: ###-####
|
FIRE-Final Inspection | 6/2/2016 | 6/3/2016 | 6/3/2016 | A | PART |
Troy Cobbley
|
|
|
Temp 30 day Final - Quinton Phone #: ###-####
|
FIRE-Final Inspection | 6/1/2016 | 6/2/2016 | 6/2/2016 | A | FAIL |
Troy Cobbley
|
|
|
Need the project related fire sprinkler permit finaled prior to a life safety final being given. All other life safety items have been addressed.
|
BLD-Final | 6/1/2016 | 6/2/2016 | 6/2/2016 | P | CANC |
Jim Sly
|
|
|
Layton Phone #: ###-####
|
Zoning Approval | 5/31/2016 | 5/31/2016 | 5/31/2016 | | PASS |
Josh Wilson
|
|
|
|
PubWorks Occupancy Approval | 5/31/2016 | 5/31/2016 | 5/31/2016 | | DONE |
Josh Wilson
|
|
|
|
FIRE-Conference | 5/26/2016 | 5/26/2016 | 5/26/2016 | P | DONE |
Troy Cobbley
|
|
|
For a final sign off the project related fire alarm and fire sprinkler permits need addressed. Fire alarm plans need resubmitted and notification tested. Fire sprinkler forward flow is only proving half of the required water for the system. For life safety the signage needs to be provided as discussed for the Oil Storage room.
|
BLD-Final | 5/25/2016 | 5/26/2016 | 5/26/2016 | P | CANC |
Jim Sly
|
|
|
Cancele per Clayton Phone #: ###-####
|
FIRE-Final Inspection | 5/25/2016 | 5/25/2016 | 5/25/2016 | P | FAIL |
Troy Cobbley
|
|
|
Todays inspection I verified that the exit signs and emergency lights have been repaired/completed
|
FIRE-Final Inspection | 5/20/2016 | 5/24/2016 | 5/24/2016 | P | CANC |
Troy Cobbley
|
|
|
Clinton Phone #: ###-####
|
FIRE-Conference | 5/23/2016 | 5/23/2016 | 5/23/2016 | P | DONE |
Troy Cobbley
|
|
|
I performed a life safety inspection. I noted exit signs and emergency lights that are non functional, not all fire extinguishers are mounted and not all of the door hardware is installed. Emergency lights are missing at the east end of the show room, three thumbturn dead bolts need to be removed from office doors, address numbers on three sides of the building need installed, signage at facp/riser and electrical rooms needs installed.
|
FIRE-Conference | 4/29/2016 | 5/11/2016 | 5/11/2016 | A | DONE |
Troy Cobbley
|
|
|
Quinon and I went over general life safety requirements
|
FIRE-Conference | 4/29/2016 | 4/29/2016 | 4/29/2016 | P | DONE |
Troy Cobbley
|
|
|
The project superintendant and I spoke about general life safety requirements and he provided documentation that the wood sheating that had been installed above the showroom windows was fire treated.
|
BLD-Ceiling Grid Inspection | 4/28/2016 | 4/29/2016 | 4/29/2016 | A | PASS |
Jim Sly
|
|
|
CLINTON Phone #: ###-####
|
BLD-Energy code compliance | 3/17/2016 | 3/18/2016 | 3/18/2016 | A | PASS |
Jim Sly
|
|
|
Insulation // Clinton Phone #: ###-####
|
BLD-Framing/Rough-in | 3/17/2016 | 3/18/2016 | 3/18/2016 | A | PASS |
Jim Sly
|
|
|
Clinton Phone #: ###-####
|
BLD-Framing/Rough-in | 3/14/2016 | 3/15/2016 | 3/15/2016 | A | PART |
Jim Sly
|
|
|
Interior only, showroom - Quinton Phone #: ###-#### Everything except restrooms ......OK.
|
BLD-Framing/Rough-in | 2/29/2016 | 2/29/2016 | 2/29/2016 | P | PART |
Jim Sly
|
|
|
Quiton-partial-exterior farming on radius wall Phone #: ###-#### Front radius soffit .....OK.
|
BLD-Foundation | 2/9/2016 | 2/9/2016 | 2/9/2016 | P | PART |
Jim Sly
|
|
|
Quintin Phone #: ###-#### OK pending MTI special insp, tests and approvals.
|
BLD-Concrete | 2/9/2016 | 2/9/2016 | 2/9/2016 | P | PART |
Jim Sly
|
|
|
service area; Quintin Phone #: ###-#### OK pending MTI special insp, tests and approvals.
|
Second Notice | | 12/20/2015 | 1/13/2016 | | DONE |
|
|
|
Mailed 1-14-16
|
First Notice | 11/24/2015 | 11/24/2015 | 12/10/2015 | | DONE |
Jim Sly
|
|
|
Mailed 12-11-15
|
BLD-Other | 12/1/2015 | 12/3/2015 | 12/3/2015 | P | PART |
Jim Sly
|
|
|
masonary grout pour (12ft lift on east side, 16ft lift west side), reinforced slab (showroom side slab area C ) - Clinton Phone #: ###-#### OK pending MTI specvial insp, tests and approvals.
|
BLD-Foundation | 11/23/2015 | 11/25/2015 | 11/25/2015 | A | PEND |
Dave Hannah
|
|
|
concrete pour, showroom ; Quintin Phone #: ###-####
|
BLD-Foundation | 11/23/2015 | 11/24/2015 | 11/24/2015 | P | PART |
Jim Sly
|
|
|
grout, service side - 12'' tall lift ; Quintin Phone #: ###-#### MTI on site.
|
DOC - Permit Finaled | 11/24/2015 | 11/24/2015 | 11/24/2015 | P | PASS |
Jim Sly
|
|
|
|
CHANGE STATUS TO (ISS) | | | 11/24/2015 | | DONE |
|
|
|
was dinaled by mistake
|
BLD-Foundation | 11/23/2015 | 11/23/2015 | 11/23/2015 | P | PART |
Jim Sly
|
|
|
grout, service side - 8'' tall lift ; Quintin Phone #: ###-#### MTI on site.
|
BLD-Foundation | 11/19/2015 | 11/20/2015 | 11/20/2015 | A | PART |
Jim Sly
|
|
|
rebar; Quintin Phone #: ###-#### MTI on site.
|
BLD-Concrete | 11/2/2015 | 11/3/2015 | 11/4/2015 | P | PART |
Jim Sly
|
|
|
showroom side, Grout, 2pm pour; Quintin Phone #: ###-#### OK pending MTI special insp, tests and approvals.
|
BLD-Footing | 10/28/2015 | 10/29/2015 | 10/29/2015 | A | PASS |
Jim Sly
|
|
|
exterior footing for showroom side (south side)Pouring at 3 - Quinton Phone #: ###-#### OK pending MTI special insp, tests and approvals.
|
BLD-Foundation | 10/27/2015 | 10/27/2015 | 10/27/2015 | P | PART |
Mike Jordan
|
|
|
Quinten-as late as possible wants to pour at 7:00 AM tomorrow-interior footing on north side of the project Phone #: ###-####. INterior footings for service bay area. Work in progress, pending special inspection.
|
BLD-Foundation | 10/26/2015 | 10/26/2015 | 10/26/2015 | P | PART |
Jim Sly
|
|
|
Quinten Phone #: ###-#### Grid line 3 and Int pads North of. OK pending MTI special inspections, tests and approvals.
|
BLD-Conference | 10/9/2015 | 10/9/2015 | 10/9/2015 | P | DONE |
Jim Sly
|
|
|
Please call ahead to meet - Clinton Phone #: ###-####
|
Issue PAID IN FULL permit | | | 10/7/2015 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/7/2015 | | DONE |
|
|
|
|
Route to Impact Fee Review | 7/29/2015 | 8/3/2015 | 7/30/2015 | | PASS |
Cindy M. Gould
|
|
|
|
OVERRIDE | | | 7/28/2015 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/28/2015 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 7/28/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/28/2015 | | DONE |
Christina Prado
|
|
|
All requirements met as of 10/6/15
|
Routing - Design Review | 7/27/2015 | | 7/28/2015 | | PASS |
Sarah Schafer
|
|
|
Approved per version 2 C1.1 locations for display vehicles. Landscape and other plans must match the indicated display vehicle locations on this sheet.
|
Plan assigned to (TLW) | 6/12/2015 | | 7/28/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 7/17/2015 | | 7/27/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Routing Off Site - STRUCTURAL | 7/17/2015 | | 7/27/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Routing PW Environmental | 6/15/2015 | | 7/10/2015 | | PASS |
Rick Christenson
|
|
|
2-2500 Gallon Interceptor Shown
|
1st review completed | | | 7/10/2015 | | DONE |
Tim L. Woodard
|
|
|
|
Routing PW Solid Waste | 6/15/2015 | | 7/9/2015 | | PASS |
Megan Durrell
|
|
|
Approved in E-Plan Review. TLW
|
Routing PW Drainage | 6/15/2015 | | 7/9/2015 | | PASS |
Brian Murphy
|
|
|
Approved in E-Plan Review. TLW
|
Routing Off Site - STRUCTURAL | 6/12/2015 | | 7/9/2015 | | FAIL |
Tim L. Woodard
|
|
|
Corrections attached
|
Routing - PLAN CHECK | 6/12/2015 | | 7/9/2015 | | PASS |
Tim L. Woodard
|
|
|
Approved with markups in E-Plan Review. TLW
|
Routing - FIRE | 6/12/2015 | | 6/23/2015 | | PASS |
Scott Arellano
|
|
|
Comments attached to case
|
Routing - MECHANICAL | 6/12/2015 | | 6/17/2015 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 6/12/2015 | | 6/16/2015 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - Erosion and Sediment | 6/12/2015 | | 6/16/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Any Earth Disturbing Activity
The Construction of a new 39,000 s.f. auto dealership building, parking lot and site improvements
|
Routing PW Sewer Rating | 6/15/2015 | | 6/16/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - PUBLIC WORKS | 6/12/2015 | | 6/15/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing PW Street Lights | 6/15/2015 | | 6/15/2015 | | PASS |
Mike D Hedge
|
|
|
No new streetl lighting required.
|
Routing PW Sewer Design | 6/15/2015 | | 6/15/2015 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing - PLANNING Land Div | 6/12/2015 | | 6/15/2015 | | PASS |
Dave Abo
|
|
|
Parcel over 5 acres in size.
|
Routing - Design Review | 6/12/2015 | | 6/15/2015 | | FAIL |
Josh Wilson
|
|
|
Revise Sheet L1.1- vehicle display pads not allowed within 10 foot parking setback
|
Intake Approval | | | 6/12/2015 | | PASS |
|
|
|
|
Pending Assignment by TLW | 6/12/2015 | | 6/12/2015 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - Addressing | 6/12/2015 | | 6/12/2015 | | PASS |
Emily Dixon
|
|
|
|
Application received | | | 6/3/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 3 2015 10:56AM
|
Temporary Occupancy | 5/29/2018 | 8/27/2018 | | | |
|
|
|
|