Information based on query as of Saturday, June 22, 2024.
Permit Information
Permit NumberBLD15-01887
StatusFinaled
Name FORREST LEBARON INC
Site Address 874 W ROLLINS ST
Project NameHarris projects
Customer Number 
ePlanReviewYes
Description
Permit for the construction of a new 1,696 sq. ft., two story (main level 1,116 sq. ft., upper level 580 sq. ft.) single family dwelling with 3 bedrooms, 2 and a half bathrooms, and a 426 sq. ft. attached garage per the approved plans, ResCheck, ACCA report and any notations. R-2D zoning and setbacks per planning.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance/Occupancy  12/29/2015 DONE
DetailsChristina Prado
BLD-Final12/1/201512/1/201512/1/2015PPASS
DetailsJim Storey
Forrest Phone #: ###-#### per aproved plan back door exit
DOC - Permit Finaled12/1/201512/1/201512/1/2015PPASS
DetailsJim Storey
FIRE-Final Inspection12/1/201512/1/201512/1/2015PCANC
DetailsJim Page
Please call when you are going to be inspecting. ###-####. Key is in electrical outlet by front door on front side of home. Phone #: ###-#### >> Inspection requested via web by Forrest LeBaron
BLD-Energy code compliance9/28/20159/28/20159/28/2015APASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Forrest LeBaron
BLD-Conference9/28/20159/28/20159/28/2015ACANC
DetailsJim Storey
Phone #: ###-#### >> Inspection requested via web by Forrest LeBaron Inspection cancelled from web by: Forrest LeBaron
BLD-Energy code compliance9/28/20159/29/20159/28/2015ACANC
DetailsJim Storey
Phone #: ###-#### >> Inspection requested via web by Forrest LeBaron Inspection cancelled from web by: Forrest LeBaron
BLD-Framing/Rough-in9/21/20159/21/20159/21/2015PPASS
DetailsJim Storey
Forresst or ###-#### Roger Phone #: ###-####
Plan Modification Accepted  9/1/2015 DONE
new manual j report
Routing - MECHANICAL9/1/2015 9/1/2015 PASS
DetailsTroy James
resubmitted manual j report
BLD-Wall Bracing8/25/20158/25/20158/25/2015PPASS
DetailsJim Storey
Shear // Michael Phone #: ###-####
BLD-Wall Bracing8/24/20158/25/20158/25/2015APASS
DetailsJim Storey
Michael Phone #: ###-####
BLD-Foundation7/20/20157/20/20157/20/2015PPASS
DetailsJim Storey
Mana Phone #: ###-####
BLD-Footing7/16/20157/17/20157/17/2015PPASS
DetailsJim Storey
Mana Phone #: ###-####
BLD-Foundation7/14/20157/15/20157/15/2015PNR
DetailsJim Storey
Mana Phone #: ###-####
Issue PAID IN FULL permit  7/10/2015 DONE
Inspection Record Card- Bld  7/10/2015 DONE
OVERRIDE  7/8/2015  
Routing - PLAN CHECK7/8/2015 7/8/2015 PASS
DetailsTisha Gallop
PLANS/APPL TAKEN TO FRONT DESK  7/8/2015 DONE
DetailsTisha Gallop
Permit Ready to Issue  7/8/2015 DONE
Needs; responsible person
Plan assigned to (LEG) Tisha6/19/2015 7/8/2015 DONE
DetailsTisha Gallop
1st review 7/6; need PF header and girder eng
Routing - PLAN CHECK6/19/2015 7/6/2015 FAIL
DetailsTisha Gallop
need portal frame header size and girder engineering; e-mailed Forrest Lebaron
1st review completed  7/6/2015 FAIL
DetailsTisha Gallop
Routing - MECHANICAL6/24/2015 6/24/2015 PASS
DetailsTroy James
Routing - MECHANICAL6/19/2015 6/22/2015 FAIL
DetailsTroy James
Routing - PLANNING6/19/2015 6/22/2015 PASS
DetailsSue Cummings
Routing - Addressing6/19/2015 6/22/2015 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS6/19/2015 6/22/2015 PASS
DetailsBeverly Mountain
Plans ACCEPTED BY PLAN TECH  6/19/2015 DONE
DetailsChristina Prado
Intake Approval  6/19/2015 PASS
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  6/19/2015 DONE
DetailsChristina Prado
Intake Approval  6/10/2015 FAIL
Applicant needs to seperate and upload drawings to individual sheets, needs RES check and only one Manual J
Application received  6/4/2015 DONE
Application submitted via PDS Online on Jun 4 2015 8:06AM