BLD-Final | 12/21/2015 | 12/22/2015 | 12/22/2015 | P | PASS |
Phil Shearer
|
|
|
Greg Phone #: ###-####
|
FIRE-Final Inspection | 12/21/2015 | 12/22/2015 | 12/22/2015 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
OVERRIDE | | | 12/21/2015 | | |
|
|
|
|
Plan assigned to (AJS) | 12/15/2015 | 12/15/2015 | 12/21/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 12/21/2015 | | 12/21/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/21/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/21/2015 | | DONE |
|
|
|
PLAN MOD--- NO FEES PER AJS- value did change so fees due for that- DO NOT RE-ISSUE
|
CHANGE STATUS TO (ISS) | | | 12/21/2015 | | DONE |
|
|
|
|
(F) Reprint permit | | | 12/21/2015 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 12/15/2015 | | DONE |
Christina Prado
|
|
|
Plan mod per the request of Ryan Drew with Larson Atchitects to make minor changes to the plans as requested by the structural inspector
|
BLD-Final | 12/10/2015 | 12/14/2015 | 12/14/2015 | A | NR |
Phil Shearer
|
|
|
Greg Phone #: ###-####
|
FIRE-Final Inspection | 12/14/2015 | 12/14/2015 | 12/14/2015 | P | FAIL |
Troy Cobbley
|
|
|
Provide city approved plans, provide revised plans showing the actual wall layout to plan review, mount fire extinguisher as discussed, remove the thumbturn dead bolts from both exit doors, keyed can be installed at the west exit door as discussed. Provide suite number.
|
BLD-Framing/Rough-in | 8/25/2015 | 8/26/2015 | 8/26/2015 | A | PASS |
Phil Shearer
|
|
|
Greg Phone #: ###-####
|
BLD-Energy code compliance | 8/26/2015 | 8/26/2015 | 8/26/2015 | P | PASS |
Phil Shearer
|
|
|
Greg Phone #: ###-####
|
BLD-Framing/Rough-in | 8/21/2015 | 8/24/2015 | 8/24/2015 | A | NR |
Phil Shearer
|
|
|
Greg Phone #: ###-####
|
Issue PAID IN FULL permit | | | 7/1/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/1/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 6/19/2015 | | |
|
|
|
|
OVERRIDE | | | 6/19/2015 | | |
|
|
|
|
OVERRIDE | | | 6/19/2015 | | |
|
|
|
|
OVERRIDE | | | 6/19/2015 | | |
|
|
|
|
Plan assigned to (AJS) | 6/11/2015 | 6/11/2015 | 6/19/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed Insight Center
|
Routing - Erosion and Sediment | 6/19/2015 | | 6/19/2015 | | PASS |
Evan Jenkins
|
|
|
Remove existing walls on second floor. Remodel existing restroom and provide new restroom. Add new accessible exterior route.
|
Routing - PLAN CHECK | 6/19/2015 | | 6/19/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/19/2015 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 6/19/2015 | | |
|
|
|
|
Permit Ready to Issue | | | 6/19/2015 | | DONE |
Christina Prado
|
|
|
Need GC, Revised Cert of value and RP for issuance
|
Routing - PLAN CHECK | 6/11/2015 | | 6/18/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
pending ESC
|
Routing - Addressing | 6/11/2015 | | 6/18/2015 | | PASS |
Emily Dixon
|
|
|
signed off in e plan
|
1st review completed | | | 6/18/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PUBLIC WORKS | 6/11/2015 | | 6/12/2015 | | PASS |
|
|
|
|
Routing PW Sewer Rating | 6/12/2015 | | 6/12/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Erosion and Sediment | 6/11/2015 | | 6/11/2015 | | FAIL |
Evan Jenkins
|
|
|
Remove existing walls on second floor. Remodel existing restroom and provide new restroom. Add new accessible exterior route.
|
Intake Approval | | | 6/11/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Application received | | | 6/4/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 4 2015 11:58AM
|