Permit NumberBLD15-01921
StatusFinaled
Name KW HOMES INC
Site Address 8813 W ARDENE ST
Project NameLinh Thu'u Temple
Customer Number 
ePlanReviewYes
Description
(LINH THU'U TEMPLE) ""MODIFICATION TO ADRESS A FOOTING/FOUNDATION FOR THE STATUE THAT WAS SHOWN ON THE PLANS"" "" PLAN MODIFICATION TO THE MECHANICAL SYSTEM "" ""PLAN MODIFICATION TO INSTALL SPRAY FOAM INSULATION ON THE UNDERSIDE OF THE ROOF SHEETING TO CREEATE A CONDITIONED ATTIC"" (ESRs ARE ATTACHED) For the construction of a new 4900 sq. ft. wood framed religious building with an associated residential unit (1740 sq. ft.) with work to include all related site work, utilities mechanical plumbing and electrical work per the approved plans and the attached engineering. This building is fully fire sprinklered because of the r occupancy. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 9/22/201610/18/2016 DONE
Mailed 10-18-16
First Notice 9/11/20169/12/2016 DONE
Mailed 9-13-16
Permanent Occupancy  9/1/2016 DONE
BLD-Final8/31/20168/31/20168/31/2016PPASS
DetailsMike Jordan
Late PM Phone #: ###-####. Ok for perm occ.
BLD-Final8/29/20168/30/20168/30/2016APART
DetailsMike Jordan
Kent Phone #: ###-####. Ok for temp occ. Vertical grab bars mmounted incorrectly.
BLD-Final8/23/20168/23/20168/23/2016PFAIL
DetailsPhil Shearer
Kent// please call before Phone #: ###-####. Missing fire door at kitchen, ADA grab bars in restrooms.
FIRE-Final Inspection8/23/20168/23/20168/23/2016APASS
DetailsTroy Cobbley
life safety passed
FIRE-Final Inspection8/19/20168/22/20168/22/2016ACANC
DetailsJim Page
Inspection request will be rescheduled for 23AUG2016 to coincide with FIR sprinkler permit final inspection.
PubWorks Occupancy Approval8/12/20168/12/20168/12/2016 DONE
DetailsTiffany Lowery
Zoning Approval8/11/20168/11/20168/11/2016 PASS
DetailsJosh Wilson
CHANGE STATUS TO (ISS)  7/26/2016 DONE
Print Occupancy Form  7/26/2016 DONE
(F) Reprint permit  7/26/2016 DONE
OVERRIDE  6/23/2016  
Plan assigned to (CDM)6/15/20166/15/20166/23/2016 PASS
DetailsCarl D Madsen
Routing - PLAN CHECK6/23/2016 6/23/2016 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  6/23/2016 DONE
Permit Ready to Issue  6/23/2016 DONE
DO NOT REISSUE PLAN MOD
Plan Modification Accepted  6/15/2016 DONE
DetailsChristina Prado
Plan mod for new statue placement
BLD-Other6/2/20166/6/20166/6/2016APASS
DetailsMike Jordan
would like call ahead; Brian Phone #: ###-####. base layer of 5/8 type x rock for roof/ceiling assembly ok.
BLD-Framing/Rough-in6/2/20166/2/20166/2/2016PPASS
DetailsMike Jordan
Kent Phone #: ###-####
OVERRIDE  5/16/2016  
Plan assigned to (CDM)5/5/20165/5/20165/16/2016 PASS
DetailsCarl D Madsen
Routing - PLAN CHECK5/11/2016 5/16/2016 PASS
DetailsCarl D Madsen
CHANGE STATUS TO (ISS)  5/16/2016 DONE
(F) Reprint permit  5/16/2016 DONE
PLANS/APPL TAKEN TO FRONT DESK  5/16/2016 DONE
Permit Ready to Issue  5/16/2016 DONE
plan mod fees due - DO NOT RE-ISSUE
Routing - MECHANICAL5/11/2016 5/13/2016 PASS
DetailsTroy James
Plan Modification Accepted  5/5/2016 DONE
DetailsChristina Prado
As requested by Arch firm to update review recent mechanical changes
BLD-Energy code compliance5/2/20165/2/20165/2/2016PPASS
DetailsMike Jordan
would like call ahead; Kent Phone #: ###-####. Ok to sheet rock the public side only.
BLD-Energy code compliance4/19/20164/19/20164/19/2016PPEND
DetailsMike Jordan
Kent Phone #: ###-####. Energy code ok. Pending resolution of mech. issues.
BLD-Conference4/18/20164/18/20164/18/2016ADONE
DetailsMike Jordan
Went over Roof ceiling assembly with contractor.
BLD-Framing/Rough-in4/14/20164/14/20164/14/2016PPASS
DetailsMike Jordan
Kent-early if possible Phone #: ###-####. All framing issues have been resolved. Ok to insulate. Advise Kent to reschedule mech. rough in inspection and noted to him the correction notice from mech. to resubmit plans.
BLD-Conference4/7/20164/7/20164/7/2016PPEND
DetailsBill VanDegrift
needed contact number to tell contractor I left a correction notice for dampers.
BLD-Framing/Rough-in4/6/20164/7/20164/7/2016PPART
DetailsMike Jordan
would like call ahead; Kent Phone #: ###-####. Transfer showers have been replaced and our now compliant. Anchor bolts installed on interior bearing walls. Fire dampers still need to be installed on resident/living side and plate washers on exterior shear walls.
BLD-Framing/Rough-in3/2/20163/3/20163/3/2016APART
DetailsMike Jordan
would like call 30min ahead; Kent Phone #: ###-####. . ok to insulate interior walls. Transfer shower issue not yet resolved. Provide fix from enginner of record on miising anchor bolts and interior bearing walls. BAthroom vent fans in residence require fire dampers. All other issues have been resolved.
BLD-Conference2/5/20162/8/20162/8/2016ADONE
DetailsMike Jordan
BLD-Framing/Rough-in2/5/20162/5/20162/5/2016PFAIL
DetailsMike Jordan
Kent Phone #: ###-####. Provide truss enginering for framing inspection. Providte the required48 inch clearance on transfer shower from control wall. Provide membrane penetration protection on can lights. Provide additional details on how to provide continous 1hr. protection on ceiling at archway. All penetrating items through the double top plates shall be protected with an approved 1hr. listed fire stop. Correction notice posted.
BLD-Framing/Rough-in12/29/201512/29/201512/29/2015PNR
DetailsMike Jordan
Kent Phone #: ###-####. Needs sprinkler rough in inspection.
OVERRIDE  12/28/2015  
Plan assigned to (CDM)12/17/201512/17/201512/28/2015 PASS
DetailsCarl D Madsen
Routing - PLAN CHECK12/28/2015 12/28/2015 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  12/28/2015 DONE
Permit Ready to Issue  12/28/2015 DONE
DetailsChristina Prado
Plan mod approved, no fees due per CDM
CHANGE STATUS TO (ISS)  12/28/2015 DONE
DetailsChristina Prado
Plan mod approved, no fees due per CDM
Plan Modification Accepted  12/17/2015 DONE
BLD-Wall Bracing11/12/201511/12/201511/12/2015PPASS
DetailsMike Jordan
Kent Phone #: ###-####. Exterior shear walls only ok.
BLD-Conference11/10/201511/12/201511/12/2015APART
DetailsMike Jordan
Ken Phone #: ###-####. Ok to set windows. No approved plans on site. contractor to recall inspection.
BLD-Footing10/29/201510/30/201510/30/2015APASS
DetailsMike Jordan
Jerry Phone #: ###-####
BLD-Energy code compliance9/23/20159/24/20159/24/2015APASS
DetailsMike Jordan
Insultaion // Rob Phone #: ###-####. Rigid insulation ok. Contacted rob to let him know that there is vegetation on interior portion of pad that will need to bo removed prior to backfilling.
BLD-Foundation9/21/20159/22/20159/22/2015PPASS
DetailsMike Jordan
Jerry Phone #: ###-####
BLD-Footing9/18/20159/21/20159/21/2015PPASS
DetailsMike Jordan
Jerry Phone #: ###-####
BLD-Conference9/16/20159/17/20159/17/2015ADONE
DetailsMike Jordan
Jerry Phone #: ###-####
Issue PAID IN FULL permit  9/11/2015 DONE
OVERRIDE  9/9/2015  
Plan assigned to (CDM)6/16/20156/16/20159/9/2015 PASS
DetailsCarl D Madsen
First review completed
Routing - PLAN CHECK9/9/2015 9/9/2015 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  9/9/2015 DONE
Permit Ready to Issue  9/9/2015 DONE
DetailsChristina Prado
Need GC, RP & Revised cert of value for issuance 9-10-15 received RP CAN
Routing - MECHANICAL8/10/2015 9/9/2015 PASS
DetailsTroy James
per E-Plan
Routing PW Drainage9/8/2015 9/8/2015 PASS
DetailsBrian Murphy
Routing - PUBLIC WORKS9/8/2015 9/8/2015 PASS
DetailsBeverly Mountain
Routing Off Site - STRUCTURAL8/10/2015 8/17/2015 PASS
DetailsCarl D Madsen
Routing - PLAN CHECK8/10/2015 8/17/2015 FAIL
DetailsCarl D Madsen
Routing - Design Review8/10/2015 8/14/2015 PASS
DetailsJosh Wilson
Ok per revised site and landscape plans
Routing - FIRE8/10/20158/10/20158/13/2015 PASS
DetailsScott Arellano
Revised comments attached to case.
Routing PW Sewer Design8/10/2015 8/12/2015 PASS
DetailsKyle S. Rosenmeyer
Routing PW Drainage8/10/2015 8/11/2015 FAIL
DetailsJason C. Taylor
needs geo depth to free draining stucture 10 feet? swale letter
Routing - PUBLIC WORKS8/10/2015 8/10/2015 PASS
DetailsBeverly Mountain
Route to Impact Fee Review7/21/20157/24/20157/23/2015 PASS
DetailsCindy M. Gould
Routing Off Site - STRUCTURAL6/16/2015 7/21/2015 FAIL
DetailsCarl D Madsen
1st review completed  7/21/2015 FAIL
Routing - PLAN CHECK6/16/2015 7/21/2015 FAIL
DetailsCarl D Madsen
Routing - FIRE6/16/2015 6/29/2015 FAIL
DetailsScott Arellano
Comments attached to case and emailed to architect.
Routing - MECHANICAL6/16/2015 6/22/2015 FAIL
DetailsTroy James
Routing - Erosion and Sediment6/16/2015 6/18/2015 PASS
DetailsEvan Jenkins
(Site Prep Inspection and Approval Required Prior to any Earth Disturbance)
(LING THU'U TEMPLE) New Religious Institution with associated Caretaker Residence on undeveloped site
Routing - Design Review6/16/2015 6/17/2015 FAIL
DetailsJosh Wilson
Sheet A.10 Relocate the ceremonail gate or reduce the overhang to protrude no more than 2 feet into the required 10 foot street setback.

Sheet LS-1 Upload revised landscape plan to match revised site plan.
Routing PW Sewer Rating6/16/2015 6/17/2015 PASS
DetailsJennifer Bruner
Routing PW Drainage6/16/2015 6/16/2015 FAIL
DetailsBrian Murphy
NEED SHEET C1.1
Routing PW Sewer Design6/16/2015 6/16/2015 FAIL
DetailsKyle S. Rosenmeyer
Indicate point of connection to public sewer.
Routing - PLUMBING6/16/2015 6/16/2015 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Routing - PLANNING Land Div6/16/2015 6/16/2015 PASS
DetailsDave Abo
Lot 7, Block 1 of Calderwood West Subdivision
Routing - Addressing6/16/2015 6/16/2015 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS6/16/2015 6/16/2015 PASS
DetailsJennifer Bruner
Pending Assignment by TLW6/16/2015 6/16/2015 DONE
DetailsTim L. Woodard
Intake Approval  6/12/2015 PASS
DetailsTim L. Woodard
Intake Approval  6/10/2015 FAIL
DetailsAdele J Schaffeld-Griffin
Please see comments on check list for additional information needed
Application received  6/5/2015 DONE
Application submitted via PDS Online on Jun 5 2015 3:26PM