BLD-Conference | 1/25/2018 | 1/25/2018 | 1/26/2018 | P | DONE |
Tony Young
|
|
|
Sean Phone #: ###-####
|
BLD-Final | 1/25/2018 | 1/26/2018 | 1/26/2018 | P | PASS |
Tony Young
|
|
|
Sean Phone #: ###-####
|
DOC - Permit Finaled | 1/26/2018 | 1/26/2018 | 1/26/2018 | P | PASS |
Tony Young
|
|
|
C OF O issued
|
PubWorks Occupancy Approval | 1/26/2018 | 1/26/2018 | 1/26/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Conference | 12/7/2017 | 12/8/2017 | 12/8/2017 | A | DONE |
Dave Hannah
|
|
|
Call before // Bob Phone #: ###-####
|
BLD-Energy code compliance | 11/17/2016 | 11/18/2016 | 11/18/2016 | A | PASS |
Tony Young
|
|
|
Bob Phone #: ###-####
|
BLD-Framing/Rough-in | 11/17/2016 | 11/17/2016 | 11/17/2016 | P | PASS |
Tony Young
|
|
|
Bob Phone #: ###-####,, ok pending trades
|
BLD-Framing/Rough-in | 10/19/2016 | 10/20/2016 | 10/20/2016 | A | PART |
Tony Young
|
|
|
Bob Phone #: ###-####,, need sprinkler tent passed prior to sheet rock,, need full signoff in basement for trades,, ok to insulate,, received letter of ok from engineer on exterior shear
|
Plan Modification Accepted | | | 10/13/2016 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 10/13/2016 | | 10/13/2016 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Footing | 2/4/2016 | 2/5/2016 | 2/5/2016 | P | PART |
Tony Young
|
|
|
Chris Phone #: ###-####,, television vault ok
|
BLD-Foundation | 1/29/2016 | 2/1/2016 | 2/1/2016 | A | PART |
Tony Young
|
|
|
Chris Phone #: ###-####,, back fill in wall
|
BLD-Foundation | 1/7/2016 | 1/8/2016 | 1/8/2016 | A | PART |
Tony Young
|
|
|
Chris Phone #: ###-####,, house foundation wall
|
BLD-Wall cover | 1/7/2016 | 1/7/2016 | 1/7/2016 | P | PART |
Tony Young
|
|
|
Chris Phone #: ###-####,,house foundation walls only
|
BLD-Footing | 1/4/2016 | 1/5/2016 | 1/5/2016 | P | PART |
Tony Young
|
|
|
Chris Phone #: ###-####,, house ftgs,, work in progress
|
PubWorks Subgrade Approval | 1/5/2016 | 1/5/2016 | 1/5/2016 | | DONE |
Jason C. Taylor
|
|
|
**ALL PERIMETER FOOTINGS***A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 12/15/2015 | 12/16/2015 | 12/16/2015 | P | PART |
Tony Young
|
|
|
Chris Phone #: ###-####,, garage,, work in progress,, ok
|
PubWorks Subgrade Approval | 12/16/2015 | 12/16/2015 | 12/16/2015 | | DONE |
Jason C. Taylor
|
|
|
**GARAGE FOOTINGS ONLY***A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Foundation | 11/20/2015 | 11/23/2015 | 11/23/2015 | A | PART |
Tony Young
|
|
|
Chris Phone #: ###-####,, basement walls ok,, work in progress
|
BLD-Footing | 11/12/2015 | 11/12/2015 | 11/12/2015 | P | PART |
Tony Young
|
|
|
Shawn Phone #: ###-####,, basement slab area
|
PubWorks Subgrade Approval | 11/4/2015 | 11/4/2015 | 11/4/2015 | | DONE |
Jason C. Taylor
|
|
|
**BASEMENT AREA**A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 10/16/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/16/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 10/15/2015 | | |
|
|
|
|
Plan assigned to (AJS) | 7/1/2015 | 7/1/2015 | 10/15/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
resub review completed Resubmittals recieved 1st review completed Failed, all reviews completed sent to ousource 7/2
|
Routing - PLAN CHECK | 10/14/2015 | | 10/15/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing Off Site - STRUCTURAL | 10/14/2015 | | 10/15/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
3rd review AHJ
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/15/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/15/2015 | | DONE |
|
|
|
all requirements met
|
Routing - PLAN CHECK | 9/22/2015 | | 10/7/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
pending structural
|
Routing Off Site - STRUCTURAL | 9/22/2015 | | 10/7/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
2nd reivew ahj
|
Routing PW Grading-Hillside | 9/23/2015 | | 9/29/2015 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - FIRE | 9/23/2015 | 9/23/2015 | 9/23/2015 | | PASS |
Katie Marron
|
|
|
Modification do not affect fire code review report.
|
Routing - PLANNING | 9/23/2015 | | 9/23/2015 | | PASS |
|
|
|
Approved per Sue Cummings review 6/10/2015
|
Routing Off Site - STRUCTURAL | 7/2/2015 | | 7/17/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
AHJ 1st review
|
1st review completed | | | 7/17/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 6/10/2015 | | 7/2/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Plan assigned to (LEG) Tisha | 6/10/2015 | | 7/1/2015 | | DEFR |
Tisha Gallop
|
|
|
6/29 L2
|
Routing - MECHANICAL | 6/29/2015 | | 6/29/2015 | | PASS |
Troy James
|
|
|
|
Routing - FIRE | 6/22/2015 | 6/22/2015 | 6/22/2015 | | PASS |
Scott Arellano
|
|
|
Attached updated fire review comments to case.
|
Routing - FIRE | 6/10/2015 | 6/10/2015 | 6/22/2015 | | FAIL |
Scott Arellano
|
|
|
Emailed report to applicant. Attached Report to case.
|
Routing PW Grading-Hillside | 6/10/2015 | | 6/18/2015 | | PASS |
Jason C. Taylor
|
|
|
Shallow injection well form uploaded on 6-23-15. Jim Wyllie (###-####) for Jason Taylor ###-####.
|
Routing - MECHANICAL | 6/10/2015 | | 6/16/2015 | | FAIL |
Troy James
|
|
|
|
Routing - PUBLIC WORKS | 6/10/2015 | | 6/11/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Erosion and Sediment | 6/10/2015 | | 6/10/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval is Required Prior to Any Earth Disturbance)
Permit for the construction of a new 10,445 sq. ft., two story with a basement (first story 5,457 sq. ft., second story 4,076 sq. ft., basement level 912 sq. ft.) single family dwelling with 3 bedrooms, 5 bathrooms, approximately 643 sq. ft. of covered patio/porch and a 1,828 sq. ft. attached garage.
Dean Briggs was notified the 3rd time about his ESC Plans stating inspections will occur after Rain Event of 0.5". Per BCC8-17, inspections shall occur after 0.25" rain event. Future plans stating 0.5" will be failed.
|
Intake Approval | | | 6/10/2015 | | PASS |
|
|
|
|
Routing - PLANNING | 6/10/2015 | | 6/10/2015 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 6/10/2015 | | 6/10/2015 | | PASS |
Emily Dixon
|
|
|
|
Application received | | | 6/8/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 8 2015 4:42PM
|