BLD-Final | 1/7/2016 | 1/8/2016 | 1/8/2016 | P | PASS |
Tony Young
|
|
|
Monica Phone #: ###-####
|
DOC - Permit Finaled | 1/8/2016 | 1/8/2016 | 1/8/2016 | P | PASS |
Tony Young
|
|
|
6 ft fence wrapping around pool in place,, workers 90 % done
|
BLD-Final | 12/22/2015 | 12/23/2015 | 12/23/2015 | A | NR |
Tony Young
|
|
|
Monica Phone #: ###-####,, needs barrier requirement per code
|
BLD-Footing | 7/29/2015 | 7/29/2015 | 7/29/2015 | P | PASS |
Tony Young
|
|
|
Rebar for pool - Monica Phone #: ###-####
|
BLD-Footing | 7/28/2015 | 7/29/2015 | 7/29/2015 | A | PEND |
Tony Young
|
|
|
Rebar for pool - Monica Phone #: ###-####,, still need soils report
|
Routing PW Grading-Hillside | 7/29/2015 | | 7/29/2015 | | PASS |
Jim Wyllie
|
|
|
Received pool subgrade approval from geotechnical engineer. Okay to shchedule a pool subgrade inspection.
Jim Wyllie / ###-####
|
BLD-Footing | 7/27/2015 | 7/28/2015 | 7/28/2015 | A | PEND |
Tony Young
|
|
|
Rebar for pool - Monica Phone #: ###-####,, still need a soils report approved by public works,, called and left a messege
|
BLD-Other | 7/27/2015 | 7/27/2015 | 7/27/2015 | P | NR |
Tony Young
|
|
|
Rebar for pool - Monica Phone #: ###-####,, needs soil report
|
OVERRIDE | | | 7/15/2015 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 7/15/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/15/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/15/2015 | | 7/15/2015 | | PASS |
Tisha Gallop
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/15/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/15/2015 | | DONE |
|
|
|
|
Plan assigned to (LEG) Tisha | 6/9/2015 | | 7/15/2015 | | DONE |
Tisha Gallop
|
|
|
walk-in L2 pool; 1st review 6/9 // 2nd review 7/14, engineering needs code year and two copies
|
Routing Walk-In (BLD) | 7/14/2015 | 7/14/2015 | 7/14/2015 | P | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Plan Reviewer's activity | | | 7/14/2015 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
Gave entire packet and drawings back to applicant. Engineering needs to specify the design standards and code the plans were designed for.
|
Routing - PLAN CHECK | 7/14/2015 | | 7/14/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Plan resubmittals received | | | 7/9/2015 | | DONE |
|
|
|
received one copy of: sheet L2, detail #501, detail #552, and sheet 100- put on Tisha's desk
|
Plan resubmittals received | | | 6/26/2015 | | DONE |
|
|
|
received Geotechnical report; forwarded e-mail to Jason Taylor
|
Routing - Erosion and Sediment | 6/11/2015 | | 6/11/2015 | | PASS |
Evan Jenkins
|
|
|
New pool, BBQ pit, and patio
|
Routing Walk-In (Zoning) | 6/9/2015 | 6/9/2015 | 6/9/2015 | P | PASS |
Sue Cummings
|
|
|
|
Routing Walk-In (PW Hillside) | 6/9/2015 | 6/9/2015 | 6/9/2015 | P | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the pool subgrade is acceptable must be approved by Public Works prior to scheduling inspections. If you have any questions call Jason Taylor ###-####.
|
Routing Walk-In (BLD) | 6/9/2015 | 6/9/2015 | 6/9/2015 | P | FAIL |
Tisha Gallop
|
|
|
need second copy of ESC plan and structural engineering for pool.
|
1st review completed | | | 6/9/2015 | | FAIL |
Tisha Gallop
|
|
|
|
Application received | | 6/9/2015 | | | |
|
|
|
|