BLD-Final | 12/3/2019 | 12/4/2019 | 12/4/2019 | P | PASS |
Jim Storey
|
|
|
call 10 mins ahead for access- Ren Phone #: ###-####
|
DOC - Permit Finaled | 12/4/2019 | 12/4/2019 | 12/4/2019 | P | PASS |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 11/24/2017 | 11/24/2017 | 11/24/2017 | | PASS |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 7/13/2017 | 7/13/2017 | 7/13/2017 | | PASS |
Jim Storey
|
|
|
no call for final
|
BLD-Aging Inspection | 7/12/2017 | 7/12/2017 | 7/12/2017 | | DONE |
Jim Storey
|
|
|
no call for final
|
BLD-Final | 2/28/2017 | 2/28/2017 | 2/28/2017 | P | PASS |
Jim Storey
|
|
|
Ren Phone #: ###-#### house ok garge under const.
|
BLD-Wall Bracing | 2/2/2017 | 2/3/2017 | 2/3/2017 | A | PASS |
Jim Storey
|
|
|
Ren Phone #: ###-####
|
BLD-Framing/Rough-in | 10/17/2016 | 10/17/2016 | 10/17/2016 | P | PASS |
Jim Storey
|
|
|
Ren Phone #: ###-####
|
BLD-Framing/Rough-in | 9/23/2016 | 9/26/2016 | 9/26/2016 | A | PART |
Jim Storey
|
|
|
Ren Phone #: ###-#### c/n okto insulate
|
BLD-Footing | 7/5/2016 | 7/6/2016 | 7/6/2016 | A | PASS |
Phil Shearer
|
|
|
Ren Phone #: ###-####,, verify setbacks
|
BLD-Foundation | 7/5/2016 | 7/6/2016 | 7/6/2016 | A | PASS |
Phil Shearer
|
|
|
Late morning // Ren Phone #: ###-####
|
BLD-Footing | 7/5/2016 | 7/5/2016 | 7/5/2016 | P | PART |
Tony Young
|
|
|
Ren Phone #: ###-####,, work in progress,, no plans,, contractor to verify porch footing setbacks,, ok to pour at contractors risk
|
BLD-Wall Bracing | 3/14/2016 | 3/15/2016 | 3/15/2016 | A | PASS |
Phil Shearer
|
|
|
Ren Phone #: ###-####
|
BLD-Aging Inspection | 2/9/2016 | 2/9/2016 | 2/10/2016 | | PEND |
Phil Shearer
|
|
|
|
BLD-Aging Inspection | 2/10/2016 | 2/10/2016 | 2/10/2016 | | PEND |
Phil Shearer
|
|
|
Owner said that he is almost ready for shear inspection.
|
BLD-Footing | 9/25/2015 | 9/28/2015 | 9/28/2015 | A | PART |
Mike Jordan
|
|
|
Ren Phone #: ###-####. ICF block, Need to check smoke and flame spread.
|
BLD-Footing | 9/18/2015 | 9/21/2015 | 9/21/2015 | A | PASS |
Phil Shearer
|
|
|
Ren Phone #: ###-####
|
BLD-Foundation | 8/28/2015 | 8/28/2015 | 8/28/2015 | P | PASS |
Mike Jordan
|
|
|
Ren Phone #: ###-####
|
BLD-Footing | 8/13/2015 | 8/14/2015 | 8/14/2015 | A | PASS |
Phil Shearer
|
|
|
Garage footing only
|
Issue PAID IN FULL permit | | | 8/13/2015 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 8/7/2015 | | |
|
|
|
|
Plan assigned to (BJM) | 7/28/2015 | 7/28/2015 | 8/7/2015 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 8/7/2015 | | DONE |
|
|
|
|
Telephone call | | | 8/7/2015 | | DONE |
|
|
|
Spoke with Ren informing him that the permit is ready and the amount that is due.
|
Routing - PLAN CHECK | 8/4/2015 | | 8/7/2015 | | PASS |
Brian McGowan
|
|
|
|
1st review completed | | | 8/7/2015 | | DONE |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 8/7/2015 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/7/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/7/2015 | | DONE |
|
|
|
All requiements met
|
Plan resubmittals received | | | 8/6/2015 | | DONE |
|
|
|
received (2) sets of site plan, frame, foundation for detached garage
|
Routing - PLANNING | 8/6/2015 | | 8/6/2015 | | PASS |
Andrea Tuning
|
|
|
|
Plan resubmittals received | | | 8/4/2015 | | DONE |
|
|
|
received (2) copies of; Truss/Wall Section & Elevation plans
|
Routing - PLAN CHECK | 7/28/2015 | | 8/3/2015 | | FAIL |
Brian McGowan
|
|
|
Additional information needed. Wall bracing, dimensions, floor plan to match elevations.
|
1st review completed | | | 8/3/2015 | | FAIL |
Brian McGowan
|
|
|
|
Plan assigned to (AJS) | 6/22/2015 | 6/22/2015 | 7/28/2015 | | DEFR |
Adele J Schaffeld-Griffin
|
|
|
!st review completed, no review failed planning
|
Routing - MECHANICAL | 7/27/2015 | | 7/28/2015 | | PASS |
Troy James
|
|
|
|
Plan resubmittals received | | | 7/27/2015 | | DONE |
Christina Prado
|
|
|
Received two sets of revised site plan, both 8 1/2 X 11 and 24 X 36 sizes; Plans take to AJS for review and rerouting
|
Routing - PLANNING | 7/27/2015 | | 7/27/2015 | | PASS |
Andrea Tuning
|
|
|
Approve per DRH15-00283 and ROS14-00070.
|
1st review completed | | | 6/23/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 6/17/2015 | | 6/23/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
called and left message for Ren, no plan review will be done until DR of substandard lot is completed for PZ.6/23/15 ajs
|
Routing - PLANNING | 6/15/2015 | | 6/22/2015 | | FAIL |
Colleen T Carroll
|
|
|
Needs Design Review for a Substandard Lot
|
Plan assigned to (LEG) Tisha | 6/12/2015 | | 6/22/2015 | | DEFR |
Tisha Gallop
|
|
|
6/24
|
Routing - MECHANICAL | 6/15/2015 | | 6/17/2015 | | PASS |
Troy James
|
|
|
|
Routing - PUBLIC WORKS | 6/12/2015 | | 6/15/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Addressing | 6/12/2015 | | 6/12/2015 | | PASS |
Emily Dixon
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/12/2015 | | DONE |
|
|
|
|
Intake Approval | | | 6/12/2015 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/12/2015 | | DONE |
|
|
|
|
Application received | | 6/9/2015 | | | |
|
|
|
|