Permit Information
Permit NumberBLD15-01961
StatusFinaled
Name MICHAEL SMITH LLC
Site Address 797 E BRAEMERE RD
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit for replacement of failing existing retaining wall with new engineered wall approximately 97 linear feet. All work is to be done according to approved site plan, engineering, and erosion conditions. //leg ***A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/21/201510/22/201510/22/2015APASS
DetailsTony Young
Michael Phone #: ###-####,, hillside ok via ph call from J.T.
DOC - Permit Finaled10/22/201510/22/201510/22/2015PPASS
DetailsTony Young
BLD-Final10/20/201510/21/201510/21/2015APEND
DetailsTony Young
Michael Phone #: ###-####,, ok pending hill side sign off
BLD-Final10/20/201510/20/201510/20/2015PPEND
DetailsTony Young
Michael Phone #: ###-####,, ok pending hillside
BLD-Final10/19/201510/20/201510/20/2015ANR
DetailsTony Young
Michael Phone #: ###-####
BLD-Conference7/31/20158/3/20158/3/2015APASS
DetailsTony Young
Phone #: ###-####,, guard rail and handrail ?s
BLD-Foundation7/6/20157/6/20157/6/2015PPART
DetailsTony Young
Cal Phone #: ###-####
BLD-Footing6/30/20157/1/20157/1/2015APASS
DetailsMike Jordan
Cal Phone #: ###-####
BLD-Footing6/25/20156/25/20156/25/2015PPART
DetailsTony Young
Michael Phone #: ###-####,, forms not in place,, footing trenches are dug and soils report has been approved
Routing PW Grading-Hillside6/25/2015 6/25/2015 PASS
DetailsJim Wyllie
Letter from geotechnical engineer approving footing subgrade has been submitted. Okay to schedule a footing inspection. Jim Wyllie / ###-####
Issue PAID IN FULL permit  6/11/2015 DONE
OVERRIDE  6/10/2015  
Application received 6/10/20156/10/2015 DONE
Routing Walk-In (Zoning)6/10/20156/10/20156/10/2015APASS
DetailsColleen T Carroll
Routing Walk-In (PW Hillside)6/10/20156/10/20156/10/2015APASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been submitted to Public Works. Okay to schedulle a footing inspection. Jim Wyllie / ###-####
Routing Walk-In (BLD)6/10/20156/10/20156/10/2015APASS
DetailsTisha Gallop
Plan assigned to (LEG) Tisha6/10/2015 6/10/2015 DONE
DetailsTisha Gallop
hillside walk-in routed to ESC
Routing - Erosion and Sediment6/10/2015 6/10/2015 PASS
DetailsEvan Jenkins
Demo existing 97LF retaining wall, and rebuild new retaining wall in its place.
1st review completed  6/10/2015 DONE
DetailsTisha Gallop
PLANS/APPL TAKEN TO FRONT DESK  6/10/2015 DONE
Inspection Record Card- Bld  6/10/2015 DONE
Inspection Record Card- Bld  6/10/2015 DONE
Permit Ready to Issue  6/10/2015 DONE
Spoke with Michael. Asked him to verify RP, all info that we have does not match what Michael gave (phone, address, email etc)