Permit Information
Permit NumberBLD15-01964
StatusFinaled
Name HC COMPANY INC
Site Address 139 S BROADWAY AVE
Project Name139 Broadway South Building
Customer NumberBLD15-01965
ePlanReviewYes
Description
(139 BROADWAY – Shell and Core – South Bldg) Permit is to remodel an existing 6,249 square foot building. Remodel consists of a complete exterior façade remodel including new soffits and storefront. Scope of work includes: interior demolition, new mechanical, new plumbing, new electrical, installation of a new sprinkler system, exterior soffits, new storefronts, remodel one restroom to become fully accessible (the other restrooms will be remodeled with tenant improvements), and interior finishes. At the competition of this project the building will be Fully Fire Sprinklered. NOTE: Separate Building Permits are required prior to occupying this space. No tenant improvement permits will be issued until non-build agreement is recorded and approved by the City of Boise Legal Dept. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
PubWorks Occupancy Approval1/27/20161/27/20161/27/2016 DONE
DetailsTiffany Lowery
BLD-Final1/25/20161/25/20161/25/2016PPASS
DetailsDave Hannah
Chris Phone #: ###-####
DOC - Permit Finaled  1/25/2016 DONE
Letter of compliance/Occupancy  1/25/2016 DONE
Zoning Approval1/22/20161/22/20161/22/2016 PASS
DetailsJosh Wilson
BLD-Final11/19/201511/20/201511/20/2015PPART
DetailsJim Storey
Temporary
Please call Chris when in route Phone #: ###-#### Inspection requested via web by Chris Fuhrman restaroom not complet/ pw on temp.
FIRE-Final Inspection11/19/201511/20/201511/20/2015APASS
DetailsJim Page
Fire sprinkler inspection for core/shell complete, fire alarm inspection for core/shell complete. Life fire safety inspection passed/complete.
Zoning Approval Temp11/20/201511/20/201511/20/2015 PASS
DetailsJosh Wilson
BLD-Conference11/12/201511/12/201511/12/2015PDONE
DetailsDave Hannah
Call in route to meet there // Chris Phone #: ###-####
BLD-Framing/Rough-in10/8/201510/8/201510/8/2015APASS
DetailsDave Hannah
Please call Chris when in route Phone #: ###-#### Inspection requested via web by Chris Fuhrman
BLD-Framing/Rough-in10/1/201510/2/201510/6/2015PPASS
DetailsDave Hannah
Chris Phone #: ###-####
BLD-Energy code compliance10/5/201510/5/201510/6/2015PPASS
DetailsDave Hannah
Chris// please call before Phone #: ###-####
BLD-Framing/Rough-in9/15/20159/16/20159/16/2015APASS
DetailsJim Storey
would like call ahead; Chris Phone #: ###-#### front sheer and steel stud framing ok fire treated ply in place south east frame out
BLD-Framing/Rough-in8/24/20158/25/20158/25/2015APART
DetailsDave Hannah
would like call ahead; Chris Phone #: ###-#### shear wall ok to cover
Issue PAID IN FULL permit  8/4/2015 DONE
Inspection Record Card- Bld  8/4/2015 DONE
OVERRIDE  7/24/2015  
Plan assigned to (TLW)6/17/2015 7/24/2015 PASS
DetailsTim L. Woodard
Level 3 TI - ePlanReview - 111 Broadway Exterior Facade
Routing - PLAN CHECK7/24/2015 7/24/2015 PASS
DetailsTim L. Woodard
1st review completed  7/24/2015 DONE
PLANS/APPL TAKEN TO FRONT DESK  7/24/2015 DONE
Permit Ready to Issue  7/24/2015 DONE
DetailsChristina Prado
**ALL REQUIREMENTS MET** Need GC, RP & Revised cert of value for issuance
Routing - Erosion and Sediment7/22/2015 7/22/2015 PASS
DetailsEvan Jenkins
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)

(111 BROADWAY)(SOUTH BLDG) Shell improvements to an existing 6,249 sf building. Work to include exterior facade changes,... North building remodel being done under BLD15-01965.
Routing PW Solid Waste6/18/2015 7/13/2015 PASS
DetailsMegan Durrell
Approved in E-Plan. TLW
Routing PW Environmental6/18/2015 7/13/2015 PASS
DetailsRick Christenson
Exterior Grease Interceptors 1500 gallon.
1st review completed  7/13/2015 DONE
Routing - PLAN CHECK6/17/2015 7/13/2015 FAIL
DetailsTim L. Woodard
Corrections noted in E-Plan. TLW
Routing - Design Review6/17/2015 6/24/2015 PASS
DetailsJosh Wilson
Ok per DRH15-00244
Routing PW Drainage6/18/2015 6/22/2015 PASS
DetailsBrian Murphy
Routing - FIRE6/17/20156/17/20156/18/2015 PASS
DetailsKatie Marron
Comments attached to case
Routing PW Street Lights6/18/2015 6/18/2015 PASS
DetailsMike D Hedge
No new street lighting required.
Routing PW Sewer Rating6/18/2015 6/18/2015 PASS
DetailsConnie Baumgartner
Routing - PUBLIC WORKS6/17/2015 6/18/2015 PASS
DetailsJennifer Bruner
Routing - Erosion and Sediment6/17/2015 6/18/2015 FAIL
DetailsEvan Jenkins
Plan Designer did not Identify the contractors Inspection Frequency to meet the BCC 8-17 Requirements.
Plan Designer did not have "Schedule Site Prep Inspection" identified in the Construction Schedule".
Routing - Addressing6/17/2015 6/17/2015 PASS
DetailsEmily Dixon
Address changed to 139 S Broadway Ave.
Pending Assignment by JCB6/17/2015 6/17/2015 DONE
DetailsJason Blais
Routing - PLUMBING6/17/2015 6/17/2015 PASS
DetailsBill VanDegrift
Per plan and ISPC.
Intake Approval  6/16/2015 PASS
DetailsJason Blais
Prescreen approved by Javier Guzman and plan review fees paid.
Application received  6/10/2015 DONE