PubWorks Occupancy Approval | 1/27/2016 | 1/27/2016 | 1/27/2016 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Final | 1/25/2016 | 1/25/2016 | 1/25/2016 | P | PASS |
Dave Hannah
|
|
|
Chris Phone #: ###-####
|
DOC - Permit Finaled | | | 1/25/2016 | | DONE |
|
|
|
|
Letter of compliance/Occupancy | | | 1/25/2016 | | DONE |
|
|
|
|
Zoning Approval | 1/22/2016 | 1/22/2016 | 1/22/2016 | | PASS |
Josh Wilson
|
|
|
|
BLD-Final | 11/19/2015 | 11/20/2015 | 11/20/2015 | P | PART |
Jim Storey
|
|
|
Temporary Please call Chris when in route Phone #: ###-#### Inspection requested via web by Chris Fuhrman restaroom not complet/ pw on temp.
|
FIRE-Final Inspection | 11/19/2015 | 11/20/2015 | 11/20/2015 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection for core/shell complete, fire alarm inspection for core/shell complete. Life fire safety inspection passed/complete.
|
Zoning Approval Temp | 11/20/2015 | 11/20/2015 | 11/20/2015 | | PASS |
Josh Wilson
|
|
|
|
BLD-Conference | 11/12/2015 | 11/12/2015 | 11/12/2015 | P | DONE |
Dave Hannah
|
|
|
Call in route to meet there // Chris Phone #: ###-####
|
BLD-Framing/Rough-in | 10/8/2015 | 10/8/2015 | 10/8/2015 | A | PASS |
Dave Hannah
|
|
|
Please call Chris when in route Phone #: ###-#### Inspection requested via web by Chris Fuhrman
|
BLD-Framing/Rough-in | 10/1/2015 | 10/2/2015 | 10/6/2015 | P | PASS |
Dave Hannah
|
|
|
Chris Phone #: ###-####
|
BLD-Energy code compliance | 10/5/2015 | 10/5/2015 | 10/6/2015 | P | PASS |
Dave Hannah
|
|
|
Chris// please call before Phone #: ###-####
|
BLD-Framing/Rough-in | 9/15/2015 | 9/16/2015 | 9/16/2015 | A | PASS |
Jim Storey
|
|
|
would like call ahead; Chris Phone #: ###-#### front sheer and steel stud framing ok fire treated ply in place south east frame out
|
BLD-Framing/Rough-in | 8/24/2015 | 8/25/2015 | 8/25/2015 | A | PART |
Dave Hannah
|
|
|
would like call ahead; Chris Phone #: ###-#### shear wall ok to cover
|
Issue PAID IN FULL permit | | | 8/4/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/4/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 7/24/2015 | | |
|
|
|
|
Plan assigned to (TLW) | 6/17/2015 | | 7/24/2015 | | PASS |
Tim L. Woodard
|
|
|
Level 3 TI - ePlanReview - 111 Broadway Exterior Facade
|
Routing - PLAN CHECK | 7/24/2015 | | 7/24/2015 | | PASS |
Tim L. Woodard
|
|
|
|
1st review completed | | | 7/24/2015 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/24/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/24/2015 | | DONE |
Christina Prado
|
|
|
**ALL REQUIREMENTS MET** Need GC, RP & Revised cert of value for issuance
|
Routing - Erosion and Sediment | 7/22/2015 | | 7/22/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
(111 BROADWAY)(SOUTH BLDG) Shell improvements to an existing 6,249 sf building. Work to include exterior facade changes,... North building remodel being done under BLD15-01965.
|
Routing PW Solid Waste | 6/18/2015 | | 7/13/2015 | | PASS |
Megan Durrell
|
|
|
Approved in E-Plan. TLW
|
Routing PW Environmental | 6/18/2015 | | 7/13/2015 | | PASS |
Rick Christenson
|
|
|
Exterior Grease Interceptors 1500 gallon.
|
1st review completed | | | 7/13/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/17/2015 | | 7/13/2015 | | FAIL |
Tim L. Woodard
|
|
|
Corrections noted in E-Plan. TLW
|
Routing - Design Review | 6/17/2015 | | 6/24/2015 | | PASS |
Josh Wilson
|
|
|
Ok per DRH15-00244
|
Routing PW Drainage | 6/18/2015 | | 6/22/2015 | | PASS |
Brian Murphy
|
|
|
|
Routing - FIRE | 6/17/2015 | 6/17/2015 | 6/18/2015 | | PASS |
Katie Marron
|
|
|
Comments attached to case
|
Routing PW Street Lights | 6/18/2015 | | 6/18/2015 | | PASS |
Mike D Hedge
|
|
|
No new street lighting required.
|
Routing PW Sewer Rating | 6/18/2015 | | 6/18/2015 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PUBLIC WORKS | 6/17/2015 | | 6/18/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Erosion and Sediment | 6/17/2015 | | 6/18/2015 | | FAIL |
Evan Jenkins
|
|
|
Plan Designer did not Identify the contractors Inspection Frequency to meet the BCC 8-17 Requirements.
Plan Designer did not have "Schedule Site Prep Inspection" identified in the Construction Schedule".
|
Routing - Addressing | 6/17/2015 | | 6/17/2015 | | PASS |
Emily Dixon
|
|
|
Address changed to 139 S Broadway Ave.
|
Pending Assignment by JCB | 6/17/2015 | | 6/17/2015 | | DONE |
Jason Blais
|
|
|
|
Routing - PLUMBING | 6/17/2015 | | 6/17/2015 | | PASS |
Bill VanDegrift
|
|
|
Per plan and ISPC.
|
Intake Approval | | | 6/16/2015 | | PASS |
Jason Blais
|
|
|
Prescreen approved by Javier Guzman and plan review fees paid.
|
Application received | | | 6/10/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 10 2015 12:25PM
|