BLD-Final | 1/25/2016 | 1/25/2016 | 1/25/2016 | P | PASS |
Dave Hannah
|
|
|
Chris Phone #: ###-####
|
DOC - Permit Finaled | | | 1/25/2016 | | DONE |
|
|
|
|
Letter of compliance/Occupancy | | | 1/25/2016 | | DONE |
|
|
|
|
Zoning Approval | 1/22/2016 | 1/22/2016 | 1/22/2016 | | PASS |
Josh Wilson
|
|
|
|
BLD-Final | 12/10/2015 | 12/11/2015 | 12/11/2015 | A | PART |
Dave Hannah
|
|
|
Please call Chris when in route to meet on site Phone #: ###-#### Inspection requested via web by Chris Fuhrman ok for temp ok to final after zoning finals
|
FIRE-Final Inspection | 12/3/2015 | 12/3/2015 | 12/3/2015 | P | PASS |
Jim Page
|
|
|
Fire sprinkler inspection complete, fire alarm inspection complete. Life fire safety passed/complete.
|
Zoning Approval Temp | 11/20/2015 | 11/20/2015 | 11/20/2015 | | PASS |
Josh Wilson
|
|
|
|
PubWorks Temp Occupancy Appr | 11/19/2015 | 11/19/2015 | 11/19/2015 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Framing/Rough-in | 11/3/2015 | 11/3/2015 | 11/3/2015 | P | PASS |
Dave Hannah
|
|
|
Chris Phone #: ###-####
|
BLD-Framing/Rough-in | 10/30/2015 | 10/30/2015 | 10/30/2015 | P | PART |
Dave Hannah
|
|
|
Chris Phone #: ###-####
|
(F) Reprint permit | | | 10/15/2015 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 10/15/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 9/23/2015 | | |
|
|
|
|
Plan assigned to (TLW) | 9/15/2015 | | 9/23/2015 | | PASS |
Tim L. Woodard
|
|
|
Plan Mod
|
Routing - PLAN CHECK | 9/16/2015 | | 9/23/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - Design Review | 9/16/2015 | | 9/18/2015 | | PASS |
Josh Wilson
|
|
|
|
Routing - PUBLIC WORKS | 9/16/2015 | | 9/17/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - PLUMBING | 9/16/2015 | | 9/17/2015 | | PASS |
Daryl Spivey
|
|
|
ASSE 1070 mixing valves required at the lavs
|
Routing - FIRE | 9/16/2015 | 9/16/2015 | 9/16/2015 | | PASS |
Katie Marron
|
|
|
Revised report attached to case.
|
Plan Modification Accepted | | | 9/15/2015 | | DONE |
|
|
|
received modifications for the following plan sheets; architectural, mechanical, plumbing, electrical
|
BLD-Other | 9/14/2015 | 9/14/2015 | 9/14/2015 | P | PASS |
Jim Storey
|
|
|
Roof deck only - Chris Phone #: ###-#### insulation ok in stock/ per plan deck ok
|
BLD-Wall cover | 9/10/2015 | 9/10/2015 | 9/10/2015 | P | PART |
Tony Young
|
|
|
Please call Chris when in route to inspection. Thank you Phone #: ###-#### Inspection requested via web by Chris Fuhrman,, engineer was on site,, ok,, east walls
|
BLD-Conference | 9/1/2015 | 9/2/2015 | 9/2/2015 | A | DONE |
Dave Hannah
|
|
|
would like call ahead; Chris Phone #: ###-####
|
Issue PAID IN FULL permit | | | 8/4/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/4/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 7/24/2015 | | |
|
|
|
|
Plan assigned to (TLW) | 6/17/2015 | | 7/24/2015 | | PASS |
Tim L. Woodard
|
|
|
Level 3 TI - ePlanReview - 111 Broadway Exterior Facade
|
Plan resubmittals received | | | 7/24/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/24/2015 | | 7/24/2015 | | PASS |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/24/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/24/2015 | | DONE |
|
|
|
**ALL REQUIREMENTS MET** need GC and rev cert of val
|
Routing - PLAN CHECK | 6/17/2015 | | 7/16/2015 | | FAIL |
Tim L. Woodard
|
|
|
Refer to E-Plan Review Changemarks. TLW
|
1st review completed | | | 7/16/2015 | | DONE |
|
|
|
|
Routing PW Environmental | 6/18/2015 | | 7/13/2015 | | PASS |
Rick Christenson
|
|
|
Grease Interceptors shown BLD15-01964
|
Routing - Erosion and Sediment | 7/7/2015 | | 7/7/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance/Demo)
(111 BROADWAY)(NORTH BLDG) Demolition of one 3,129 sf building and provide "face lift" on remaining building. With minor interior work and site work. South building remodel being done under BLD15-01964.
|
Routing - Design Review | 6/17/2015 | | 6/24/2015 | | PASS |
Josh Wilson
|
|
|
Ok per DRH15-00244
|
Routing - FIRE | 6/17/2015 | 6/17/2015 | 6/18/2015 | | FAIL |
Katie Marron
|
|
|
Report sent to architect and attached to case
|
Routing PW Sewer Rating | 6/18/2015 | | 6/18/2015 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PUBLIC WORKS | 6/17/2015 | | 6/18/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Erosion and Sediment | 6/17/2015 | | 6/18/2015 | | FAIL |
Evan Jenkins
|
|
|
What is the Inspection Frequency?
Schedule: Site Prep Inspection Required Prior to Demo/Earth Disturbance.
|
Routing - PLUMBING | 6/17/2015 | | 6/17/2015 | | PASS |
Bill VanDegrift
|
|
|
Per plan and ISPC.
|
Routing - Addressing | 6/17/2015 | | 6/17/2015 | | PASS |
Emily Dixon
|
|
|
|
Pending Assignment by JCB | 6/17/2015 | | 6/17/2015 | | DONE |
Jason Blais
|
|
|
|
Intake Approval | | | 6/16/2015 | | FAIL |
Javier Guzman
|
|
|
Missing plan sheet C1.0 designating fire hydrants
|
Intake Approval | | | 6/16/2015 | | PASS |
Jason Blais
|
|
|
Prescreen approved by Javier Guzman and plan review fees paid.
|
Application received | | | 6/10/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 10 2015 12:25PM
|