Information based on query as of Friday, June 21, 2024.
Permit Information
Permit NumberBLD15-01982
StatusFinaled
Name ALPINE CONSTRUCTION INC
Site Address 2789 S BROADWAY AVE
Project NameJimmy John's Drive-Thru
Customer Number 
ePlanReviewYes
Description
(FUTURE JIMMY JOHN'S)(DRIVE-THRU)NO OCCUPANCY ALLOWED UNDER THIS PERMIT. PLAN MODIFICATION TO CHAGNE DRIVE THROUGH 1/8/16 AJS**This permit is for a a drive-thru lane and window to an existing shopping center. The new window will be installed in an existing CMU wall per attached engineering. This permit is not for occupancy. A separate MAJOR tenant imporvement must be submitted prior to occupancy for the proposed chagne in occupancy. Site work as shown on approved plans. **ajs**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  12/5/2016 DONE
Third Notice 10/15/201611/17/2016 DONE
Third Notice 9/24/201610/10/2016 DONE
Second Notice 8/22/20169/19/2016 DONE
First Notice7/15/20167/15/20168/12/2016 DONE
DetailsCarlos Velazquez
BLD-Aging Inspection7/15/20167/15/20167/15/2016 DONE
DetailsJim Storey
DOC - Permit Finaled7/15/20167/15/20167/15/2016PPASS
DetailsJim Storey
BLD-Final3/2/20163/3/20163/3/2016APART
DetailsJim Storey
final ok pending ele signoff
BLD-Final3/1/20163/2/20163/2/2016PDEFR
DetailsJim Storey
Garrett Phone #: ###-#### out of time
Zoning Approval3/2/20163/2/20163/2/2016 PASS
DetailsJosh Wilson
PubWorks Occupancy Approval3/2/20163/2/20163/2/2016 DONE
DetailsTiffany Lowery
BLD-Framing/Rough-in2/26/20162/26/20162/26/2016PPASS
DetailsJim Storey
Garrett-ADA ramp Phone #: ###-####
CHANGE STATUS TO (ISS)  1/28/2016 DONE
Plan Mod
(F) Reprint permit  1/28/2016 DONE
OVERRIDE  1/8/2016  
Plan assigned to (AJS)12/23/201512/23/20151/8/2016 PASS
DetailsAdele J Schaffeld-Griffin
Plan Mod - Jimmy Johns Drive Thru
Routing - PLANNING1/7/2016 1/8/2016 PASS
DetailsLeon Letson
SIGNED OFF IN E PLAN
Routing - Design Review1/7/2016 1/8/2016 PASS
DetailsJosh Wilson
PLANS/APPL TAKEN TO FRONT DESK  1/8/2016 DONE
Permit Ready to Issue  1/8/2016 DONE
DetailsChristina Prado
Do Not Re-issue - Plan Mod approved, Fire review fees due. No other paperwork needed to issue
Routing - PLANNING12/23/2015 12/30/2015 FAIL
DetailsLeon Letson
failed in e plan, need DR approval
Routing - Design Review12/23/2015 12/30/2015 FAIL
DetailsJosh Wilson
Revise landscape plan to show new landscape island layout
Routing - FIRE12/29/201512/29/201512/29/2015 PASS
DetailsKatie Marron
Modifications to drive thru include shortening curb and using pavement markings at the entrance to drive thru. Required FD access not affected.
Routing - PLAN CHECK12/23/2015 12/29/2015 PASS
DetailsAdele J Schaffeld-Griffin
Routing PW Drainage12/23/2015 12/28/2015 PASS
DetailsBrian Murphy
Routing - PUBLIC WORKS12/23/2015 12/23/2015 PASS
DetailsRachael Beierle
Plan Modification Accepted  12/23/2015 DONE
modification to curbing & landscape plans
BLD-Framing/Rough-in12/18/201512/18/201512/18/2015PPASS
DetailsJim Storey
cmu window support
OVERRIDE  12/9/2015  
Plan assigned to (AJS)12/9/201512/9/201512/9/2015 PASS
DetailsAdele J Schaffeld-Griffin
Plan mod
Routing - FIRE12/9/201512/9/201512/9/2015 PASS
DetailsKatie Marron
Modifications to the drive thru were reviewed for fire department vehicle access. No comments attached. Approval subject to satisfactory inspection by PDS Fire Inspector.
Routing - PUBLIC WORKS12/9/2015 12/9/2015 PASS
DetailsJennifer Bruner
Routing PW Drainage12/9/2015 12/9/2015 PASS
DetailsBrian Murphy
PLANS/APPL TAKEN TO FRONT DESK  12/9/2015 DONE
Permit Ready to Issue  12/9/2015 DONE
DetailsChristina Prado
Plan mod, no fees due
Routing - Design Review12/9/2015 12/9/2015 PASS
DetailsJosh Wilson
Routing - PLAN CHECK12/9/2015 12/9/2015 PASS
DetailsAdele J Schaffeld-Griffin
charge to drive isle only
CHANGE STATUS TO (ISS)  12/9/2015 DONE
DetailsChristina Prado
Plan mod, no fees due
Plan Modification Accepted  12/9/2015 DONE
DetailsChristina Prado
Plan mod requested by ALC
OVERRIDE  11/9/2015  
Plan assigned to (AJS)11/9/201511/9/201511/9/2015 PASS
DetailsAdele J Schaffeld-Griffin
Routing - FIRE11/9/201511/9/201511/9/2015 PASS
DetailsKatie Marron
Fire Department Vehicle Access must be maintained throughout construction. Signage will be required designating "No Parking Fire Lane" see plan sheet L1.0 for approved fire department access lane.
PLANS/APPL TAKEN TO FRONT DESK  11/9/2015 DONE
Permit Ready to Issue  11/9/2015 DONE
DetailsChristina Prado
Do not re-issue, plan mod only
CHANGE STATUS TO (ISS)  11/9/2015 DONE
DetailsChristina Prado
Plan Modification Accepted  11/9/2015 DONE
DetailsChristina Prado
Plan mod workflow started per AJS
Issue PAID IN FULL permit  11/3/2015 DONE
Inspection Record Card- Bld  11/2/2015 DONE
OVERRIDE  10/15/2015  
Plan assigned to (AJS)6/15/20156/15/201510/15/2015 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed, Future JimmyJohn'e Drie thru
Routing PW Drainage10/15/2015 10/15/2015 PASS
DetailsBrian Murphy
Routing PW Drainage10/7/2015 10/15/2015 PASS
DetailsBrian Murphy
signed off in e plan
PLANS/APPL TAKEN TO FRONT DESK  10/15/2015 DONE
Permit Ready to Issue  10/15/2015 DONE
NEED RP, GC, and Certificate of value
Routing - PLAN CHECK10/7/2015 10/9/2015 PASS
DetailsAdele J Schaffeld-Griffin
Routing - Design Review10/7/2015 10/8/2015 PASS
DetailsJosh Wilson
Routing - PLANNING10/7/2015 10/7/2015 PASS
DetailsLeon Letson
Routing - Erosion and Sediment10/7/2015 10/7/2015 PASS
DetailsEvan Jenkins
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)

(FUTURE JIMMY JOHN'S)(DRIVE-THRU)This permit is for a a drive-thru lane and window to an existing shopping center. The new window will be installed in an existing store front window. This permit is not for occupancy. A separate MAJOR tenant imporvement must be submitted prior to occupancy for the proposed chagne in occupancy. Site work as shown on approved plans.
Routing - PLAN CHECK6/15/2015 6/24/2015 FAIL
DetailsAdele J Schaffeld-Griffin
1st review completed  6/24/2015 FAIL
DetailsAdele J Schaffeld-Griffin
Routing PW Solid Waste6/15/2015 6/23/2015 PASS
DetailsMegan Durrell
Routing - PLANNING6/22/2015 6/22/2015 FAIL
DetailsLeon Letson
3-stall Bike Rack Required per CUP15-00008
Routing PW Drainage6/15/2015 6/18/2015 FAIL
DetailsBrian Murphy
NEED O M DRAINAGE REPORT
Routing - Design Review6/15/2015 6/16/2015 FAIL
DetailsSarah Schafer
Design Review approval required.
Routing - PLANNING6/15/2015 6/15/2015 FAIL
DetailsLeon Letson
3-stall Bike Rack required per CUP15-00008.
Routing - Addressing6/15/2015 6/15/2015 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS6/15/2015 6/15/2015 PASS
DetailsJennifer Bruner
Routing - Erosion and Sediment6/15/2015 6/15/2015 FAIL
DetailsEvan Jenkins
Per BCC 8-17 for Review Approval. Per BCC 8-17 or the Requirements stated directly above where you placed your area of disturbance of 14,813 SF. Threshold is 600 SF or More Requires a Full ESC Plan/Narrative and Site Maps.
Evan Jenkins 794.3958
Routing - Design Review6/15/2015 6/15/2015 FAIL
DetailsAndrea Tuning
Intake Approval  6/15/2015 PASS
DetailsAdele J Schaffeld-Griffin
Application received  6/11/2015 DONE
Application submitted via PDS Online on Jun 11 2015 8:24AM
Intake Approval  6/11/2015 FAIL
DetailsAdele J Schaffeld-Griffin
Please see mark ups on check list for missing and revisions needed for pre screen.