Second Notice | | 12/20/2015 | 1/1/2016 | | DONE |
|
|
|
This permit finaled on the web by Dustyn Brownlee
|
First Notice | 11/13/2015 | 11/13/2015 | 12/10/2015 | | DONE |
Mike Jordan
|
|
|
Mailed 12-11-15
|
BLD-Final | 11/10/2015 | 11/13/2015 | 11/13/2015 | A | PASS |
Mike Jordan
|
|
|
Jim Phone #: ###-####
|
DOC - Permit Finaled | 11/13/2015 | 11/13/2015 | 11/13/2015 | P | PASS |
Mike Jordan
|
|
|
|
FIRE-Final Inspection | 11/12/2015 | 11/12/2015 | 11/12/2015 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 11/10/2015 | 11/12/2015 | 11/12/2015 | A | NR |
Mike Jordan
|
|
|
Jim Phone #: ###-####. Fire/life/safety final inspection has failed.
|
FIRE-Final Inspection | 11/9/2015 | 11/10/2015 | 11/10/2015 | P | FAIL |
Troy Cobbley
|
|
|
provide smoke evac testing, provide "clouds" around the lower pendant sprinkler heads.
|
BLD-Ceiling Grid Inspection | 11/5/2015 | 11/6/2015 | 11/6/2015 | P | PASS |
Mike Jordan
|
|
|
Mike Phone #: ###-####
|
BLD-Final | 10/28/2015 | 10/30/2015 | 10/30/2015 | A | CANC |
Mike Jordan
|
|
|
Mike Phone #: ###-####
|
FIRE-Final Inspection | 10/28/2015 | 10/29/2015 | 10/29/2015 | P | CANC |
Troy Cobbley
|
|
|
Mike Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 10/23/2015 | 10/26/2015 | 10/26/2015 | A | PASS |
Mike Jordan
|
|
|
Mike Phone #: ###-####
|
Issue PAID IN FULL permit | | | 10/19/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/19/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/23/2015 | | DONE |
Christina Prado
|
|
|
Need GC and Revised certificate of value fro issuance-- all requirements met BUT we need GC address put into the directory
|
Plan assigned to (CDM) | 7/16/2015 | 7/16/2015 | 7/22/2015 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 7/16/2015 | | 7/22/2015 | | PASS |
Carl D Madsen
|
|
|
|
1st review completed | | | 7/22/2015 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/22/2015 | | DONE |
|
|
|
|
Intake Approval | | | 7/16/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - Addressing | 7/16/2015 | | 7/16/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 7/16/2015 | | 7/16/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Intake Approval | | | 6/24/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
Please upload approval letter from the mall.
Please review the electronic submittal standards.
Each drawing sheet shall be stamped and signed by the architect of record not just the cover sheet.
The architects signature is required to be on the Idaho seal. The cover sheet has the approved seal and signature however the additional drawings only have a signature. Please provide the seal and signature on all drawings.
Please upload the 304 form completed.
Please upload the 518 check list completed.
|
Intake Approval | | | 6/24/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
Please upload approval letter from the mall.
Please review the electronic submittal standards.
Please upload the 304 form completed.
Please upload the 518 check list completed.
|
Intake Approval | | | 6/16/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
Please upload approval letter from the mall.
Please review the electronic submittal standards.
The drawings shall be uploaded in the drawings folder.
Each drawing sheet shall be uploaded individually with a conventional name, A.O-Cover Sheet for example.
Each drawing sheet shall be stamped and signed by the architect of record not just the cover sheet.
|
Application received | | | 6/11/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 11 2015 9:11AM
|