Information based on query as of Friday, June 21, 2024.
Permit Information
Permit NumberBLD15-01997
StatusFinaled
Name ZWICK CONSTRUCTION COMPANY INC
Site Address 8303 S FEDERAL WAY
Project NameThermo King Intermountain
Customer Number 
ePlanReviewYes
Description
**Project Management-Ron Hill**(THERMO KING INTERMOUNTAIN) **plan modification for review of deferred structural calculations for wash bay membrane structure 8/29/16 ajs**Permit to construct a new 21,636 square foot office / shop building. This building is fire sprinklered for area increase and utilizes enhanced lighting to comply with the 2012 IECC. Scope of work includes: construction of poured concrete foundation, construction of reinforced concrete tilt-up exterior wall panels, construction of new steel bar-joist roof framing / steel pan deck, [construction of interior nonbearing walls to create: service area, cutomer lounge, janitor closet, separate sex accessible restrooms, vestibule, guest office, five individual offices, a conference room, a parts / service counter area, parts warehouse, fire riser room electrical closet, fabrication closet, mens lockeroom, and a break room], new electrical, new plumbing, new mechanical, new interior / exterior finishes, new accessible doors / hardware, new front awning, new exterior dock canopy, and related site work. NOTE: a separate racking permit is required and the exterior wash bay is required to be submitted as a Defered Submittal. This building is fully fire sprinklered for area increase. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 8/7/20178/10/2017 DONE
went out in mail 8-10-17
Permanent Occupancy  7/28/2017 DONE
Telephone call  7/25/2017 DONE
emailed Ryan at rhill@zwickconstruction.com to let know taht the Temp C of O expires on 7/29/17
BLD-Aging Inspection7/3/20177/3/20177/10/2017 PASS
DetailsJim Storey
Jason Blais ok's a 60 day extension grood from 5/31/17
Zoning Approval6/27/20176/27/20176/27/2017 PASS
DetailsSarah Schafer
Approved.
BLD-Aging Inspection5/1/20175/1/20175/1/2017 PASS
DetailsJim Storey
Jason Blais ok's a 60 day extension grood from 5/31/17
Temporary Occupancy4/28/20177/27/20174/28/2017 DONE
DetailsCandy A. Nichols
Jason Blais ok's a 60 day extension grood from 5/31/17
Temporary Occupancy4/28/20177/27/20174/28/2017 DONE
DetailsCandy A. Nichols
as per Jason Blais -request for extension is good for 60 days starting from 5/31/2017
Temporary Occupancy3/2/20175/31/20173/2/2017 DONE
DetailsCarlos Velazquez
FIRE-Final Inspection2/27/20172/27/20172/27/2017APASS
DetailsJim Page
Racking permit inspection complete, final for life fire safety passed/complete
BLD-Final2/23/20172/23/20172/23/2017APASS
DetailsJim Storey
This inspection is for a T-CO. Sign off card is on counter of sales area. Phone #: ###-#### Inspection requested via web by Arn Kniffen pending pw and p&z and mech temp.
PubWorks Temp Occupancy Appr2/23/20172/23/20172/23/2017 DONE
DetailsTiffany Lowery
FIRE-Final Inspection2/17/20172/21/20172/21/2017APART
DetailsJim Page
Partial life fire safety inspection complete. Final fire sprinkler inspection complete, final fire alarm inspection complete, fire extinguishers are in place with current inspection tags, knox box is in place. There is a building permit for racking associated with this tenant that is not attached to this project (BLD17-00043), this permit is in issued status, the racking permit will need a final inspection performed, when the racking permit inspection is complete and passed BLD15-01997 permit can be finaled for fire life safety. Signage for the FACP room as well as signage for fire sprinkler riser access will be installed, will verify installation of signage during racking permit inspection
BLD-Ceiling Grid Inspection1/12/20171/13/20171/13/2017APASS
DetailsJim Storey
arn Phone #: ###-####
BLD-Framing/Rough-in12/29/201612/30/201612/30/2016PPASS
DetailsJim Storey
arn Phone #: ###-#### ceilling ok pending others
BLD-Energy code compliance11/18/201611/21/201611/21/2016PPASS
DetailsJim Storey
Arn Phone #: ###-#### insulation ok to cover all walls
BLD-Framing/Rough-in11/16/201611/17/201611/17/2016APASS
DetailsJim Storey
Arn Phone #: ###-#### framing a insulation
BLD-Framing/Rough-in11/10/201611/14/201611/14/2016APASS
DetailsPhil Shearer
Arn-ada in bathrooms Phone #: ###-####
BLD-Energy code compliance11/10/201611/14/201611/14/2016APASS
DetailsPhil Shearer
Arn Phone #: ###-####
BLD-Energy code compliance11/4/201611/7/201611/7/2016APASS
DetailsJim Storey
Arn Phone #: ###-#### office exterior walls ok
BLD-Framing/Rough-in11/2/201611/3/201611/3/2016APART
DetailsJim Storey
Part // Arn Phone #: ###-#### office ok one side pending backing ada
BLD-Energy code compliance9/22/20169/22/20169/22/2016APASS
DetailsJim Storey
As early as possible Phone #: 3852260488 >> Inspection requested via mobile web by Arn Kniffen foam insulation at grade ok to cover exterior permiter of building
BLD-Conference9/22/20169/22/20169/22/2016ACANC
DetailsJim Storey
>> Inspection requested via mobile web by Arn Kniffen Inspection cancelled via mobile web on Thursday, September 22, 2016.
BLD-Footing9/16/20169/16/20169/16/2016APASS
DetailsJim Storey
ft at loading dock pass with si pending
CHANGE STATUS TO (ISS)  9/14/2016 DONE
(F) Reprint permit  9/14/2016 DONE
OVERRIDE  9/8/2016  
Plan assigned to (AJS)8/29/20168/29/20169/8/2016 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed
Permit Ready to Issue  9/8/2016 DONE
PLAN MOD DO NOT RE-ISSUE
Routing Off Site - STRUCTURAL9/6/2016 9/7/2016 PASS
DetailsRon Hill
Routing - PLAN CHECK8/29/2016 9/2/2016 FAIL
DetailsAdele J Schaffeld-Griffin
pending structural approval
Routing Off Site - STRUCTURAL8/29/2016 9/2/2016 FAIL
DetailsAdele J Schaffeld-Griffin
1hr
Plan Modification Accepted  8/29/2016 DONE
DetailsChristina Prado
Per Ron Hill - to add previous deferred wash bay to submittal
BLD-Footing8/24/20168/25/20168/25/2016APASS
DetailsJim Storey
Ron Phone #: ###-#### ft ok
BLD-Concrete8/10/20168/10/20168/10/2016PPASS
DetailsJim Storey
BLD-Footing6/29/20166/30/20166/30/2016APASS
DetailsJim Storey
Arn-partial inspection-grid C & 8 spot footings thru shop ingrid C-pour time 11:00 Phone #: ###-#### si mti
OVERRIDE  4/26/2016  
Issue PAID IN FULL permit  4/26/2016 DONE
Print Occupancy Form  4/26/2016 DONE
Inspection Record Card- Bld  4/26/2016 DONE
Permit Ready to Issue  4/26/2016 DONE
DetailsChristina Prado
Need RP for issuance, all other requirements met
Plan assigned to (TLW)4/13/2016 4/26/2016 PASS
DetailsTim L. Woodard
1st Review Complete. TLW
Routing - PUBLIC WORKS4/18/2016 4/26/2016 PASS
DetailsJennifer Bruner
Modification to civil plans. Changes sidewalk sizes. TLW

Approved in E-Plan. TLW
Routing PW Street Lights4/18/2016 4/26/2016 PASS
DetailsTom Marshall
Approved in E-Plan. TLW
Routing PW Environmental4/18/2016 4/25/2016 PASS
DetailsRick Christenson
Routing PW Drainage4/18/2016 4/20/2016 PASS
DetailsBrian Murphy
Routing - Design Review4/18/2016 4/20/2016 PASS
DetailsJosh Wilson
DRH15-00093. Plan mod reduces sidewalk size. TLW
Routing PW Solid Waste4/18/2016 4/19/2016 PASS
DetailsMegan Durrell
Routing PW Sewer Design4/18/2016 4/18/2016 PASS
DetailsKyle S. Rosenmeyer
Routing - PLAN CHECK4/18/2016 4/18/2016 PASS
DetailsTim L. Woodard
Plan mod doesn't affect building. Civil and Lanscape only. TLW
Plan Modification Accepted  4/13/2016 DONE
DetailsChristina Prado
PLan Mod for changes to civil plans
OVERRIDE  3/15/2016  
Permit Ready to Issue  3/15/2016 DONE
DetailsChristina Prado
Need RP for issuance
Routing - PLAN CHECK2/24/2016 3/14/2016 PASS
DetailsTim L. Woodard
Routing Off Site - STRUCTURAL2/24/2016 3/14/2016 PASS
DetailsTim L. Woodard
Routing PW Street Lights3/14/2016 3/14/2016 PASS
DetailsMike D Hedge
PLANS/APPL TAKEN TO FRONT DESK  3/14/2016 DONE
Plan assigned to (TLW)6/24/2015 3/14/2016 PASS
DetailsTim L. Woodard
1st Review Completed. TLW
Plan resubmittals received  2/24/2016 DONE
Extend Review Timeline  12/7/2015 DONE
DetailsJason Blais
Routing PW Drainage9/18/2015 10/27/2015 PASS
DetailsJim Wyllie
Routing Off Site - STRUCTURAL9/18/2015 9/30/2015 FAIL
DetailsTim L. Woodard
Routing - PLAN CHECK9/18/2015 9/30/2015 FAIL
DetailsTim L. Woodard
Defered Submittal not allowed on canopy structure. TLW
Routing PW Environmental9/18/2015 9/29/2015 PASS
DetailsRick Christenson
Routing PW Sewer Design9/18/2015 9/25/2015 PASS
DetailsKyle S. Rosenmeyer
Routing PW Sewer Rating9/18/2015 9/23/2015 PASS
DetailsJennifer Bruner
Routing PW Street Lights9/18/2015 9/22/2015 FAIL
DetailsMike D Hedge
Routing - FIRE9/18/20159/18/20159/21/2015 PASS
DetailsKatie Marron
Updated report attached to case.
Routing - PLUMBING9/18/2015 9/21/2015 PASS
DetailsDaryl Spivey
grease interceptor approved through public works pretreatment
Plan resubmittals received  9/18/2015 DONE
Routing - Design Review9/18/2015 9/18/2015 PASS
DetailsJosh Wilson
Routing - Erosion and Sediment9/18/2015 9/18/2015 PASS
DetailsEvan Jenkins
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)

(THERMO KING INTERMOUNTAIN) New construction of office and shop space for Thermo King Intermountain; which includes sales; service and repair of over-the-road refrigeration equipment. Truck and trailer service shop and parts warehouse.
Route to Impact Fee Review9/16/20159/19/20159/17/2015 PASS
DetailsStephanie Jensen
1st review completed  7/23/2015 DONE
DetailsTim L. Woodard
Routing - PLAN CHECK6/24/2015 7/23/2015 FAIL
DetailsTim L. Woodard
Routing PW Solid Waste6/25/2015 7/20/2015 PASS
DetailsMegan Durrell
Approved in E-Plan Review. TLW
Routing PW Sewer Design6/25/2015 7/13/2015 FAIL
DetailsKyle S. Rosenmeyer
Spoke with Civil Engineer Week of July 6-10. Engineer plans to revise sewer connection and use existing sewer stubs.
Routing PW Drainage6/25/2015 7/8/2015 FAIL
DetailsJim Wyllie
NEEDS POND DETAIL WIT C33 INTO CLEAN LAVA ROCK L XW SNOUTS NEEDED O M SEDIMENT LEVEL
Routing Off Site - STRUCTURAL6/24/2015 7/8/2015 FAIL
DetailsTim L. Woodard
Routing - PUBLIC WORKS7/2/2015 7/2/2015 PASS
DetailsJennifer Bruner
PW Drainage reassigned to BGM
Routing PW Sewer Rating6/25/2015 6/29/2015 PASS
DetailsJennifer Bruner
Routing - FIRE6/24/2015 6/29/2015 FAIL
DetailsScott Arellano
Comments attached to case and emailed to architect.
Routing - Design Review6/24/2015 6/29/2015 PASS
DetailsJosh Wilson
Routing - MECHANICAL6/24/2015 6/26/2015 PASS
DetailsTroy James
Routing - PLUMBING6/24/2015 6/26/2015 PASS
DetailsDaryl Spivey
1) see SP-100 for exterior rain water piping
2) water to eyewash to be upstream of r.p.
3) vent chamber of flammable liquids interceptor
Routing - PLANNING Land Div6/24/2015 6/25/2015 PASS
DetailsDave Abo
Approved in E-Plan By Todd Tucker. TLW
Routing - PUBLIC WORKS6/24/2015 6/25/2015 PASS
DetailsJennifer Bruner
Routing - Erosion and Sediment6/24/2015 6/25/2015 FAIL
DetailsEvan Jenkins
Per BCC 8-17, a Full ESC Narrative is required for Approval. Since your project is over 1 Acre, you will need to file an eNOI with the EPA and develop a Full SWPPP. You may Submit that SWPPP to the City for Review and Approval. Evan Jenkins 794.3958


New construction of office and shop space for Thermo King Intermountain; which includes sales; service and repair of over-the-road refrigeration equipment. Truck and trailer service shop and parts warehouse.
Routing PW Environmental6/25/2015 6/25/2015 PASS
DetailsRick Christenson
Wash Bay connnected to Sand and Oil Interceptor
Routing PW Street Lights6/25/2015 6/25/2015 FAIL
DetailsMike D Hedge
Required Info missing.
Routing - Addressing6/24/2015 6/24/2015 PASS
DetailsEmily Dixon
Intake Approval  6/24/2015 PASS
Pending Assignment by TLW6/24/2015 6/24/2015 DONE
DetailsTim L. Woodard
Application received  6/11/2015 DONE
Application submitted via PDS Online on Jun 11 2015 4:43PM