BLD-Final | 5/3/2017 | 5/3/2017 | 5/3/2017 | P | PASS |
Dave Hannah
|
|
|
Mike Phone #: ###-####
|
DOC - Permit Finaled | 5/3/2017 | 5/3/2017 | 5/3/2017 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 4/26/2017 | 4/27/2017 | 4/27/2017 | A | CANC |
Dave Hannah
|
|
|
Michael Phone #: ###-####
|
PubWorks Occupancy Approval | 4/27/2017 | 4/27/2017 | 4/27/2017 | | DONE |
Jason C. Taylor
|
|
|
Pool completed. Occupancy ok.
|
BLD-Aging Inspection | 12/31/2015 | 12/31/2015 | 1/6/2016 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 12/30/2015 | 12/30/2015 | 12/30/2015 | | PEND |
Dave Hannah
|
|
|
|
BLD-Foundation | 8/17/2015 | 8/18/2015 | 8/18/2015 | A | PASS |
Dave Hannah
|
|
|
Mike Phone #: ###-#### pool and spa ok to shut
|
PubWorks Subgrade Approval | 8/11/2015 | 8/11/2015 | 8/11/2015 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the pool subgrade is acceptable must be approved by Public Works prior to scheduling inspections. If you have any questions call Jason Taylor ###-####.
|
BLD-Framing/Rough-in | 7/27/2015 | 7/28/2015 | 7/28/2015 | A | CANC |
Mike Jordan
|
|
|
Mike Phone #: ###-####
|
BLD-Foundation | 7/28/2015 | 7/28/2015 | 7/28/2015 | A | PASS |
Mike Jordan
|
|
|
Mike Phone #: ###-####. Retaining wall ok.
|
BLD-Footing | 7/20/2015 | 7/21/2015 | 7/21/2015 | A | PASS |
Dave Hannah
|
|
|
Mike Phone #: ###-####
|
PubWorks Subgrade Approval | 7/20/2015 | 7/20/2015 | 7/20/2015 | | DONE |
Jason C. Taylor
|
|
|
***RETAINING WALL WEST SIDE OF RESIDENCE***A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Routing Walk-In (Zoning) | 7/14/2015 | 7/14/2015 | 7/14/2015 | A | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 7/14/2015 | 7/14/2015 | 7/14/2015 | A | FAIL |
David Ferguson
|
|
|
Need revised ESC narrative. Evan said ok to use existing permit from house. Homeowner needs to provide 2 copies of site plan. Structural calcs and/or engineering for the retaining wall.
|
Routing Walk-In (PW Hillside) | 7/14/2015 | 7/14/2015 | 7/14/2015 | A | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the retaining wall footing and pool subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Routing Walk-In (BLD) | 7/14/2015 | 7/14/2015 | 7/14/2015 | P | PASS |
Tisha Gallop
|
|
|
|
1st review completed | | | 7/14/2015 | | DONE |
|
|
|
|
Plan assigned to (LEG) Tisha | 7/14/2015 | | 7/14/2015 | | DONE |
Tisha Gallop
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/14/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/14/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/14/2015 | | DONE |
|
|
|
all requirments met
|
Issue PAID IN FULL permit | | | 7/14/2015 | | DONE |
|
|
|
|
Intake Approval | | | 7/14/2015 | | PASS |
Carlos Velazquez
|
|
|
|
Application received | | 6/12/2015 | | | |
|
|
|
|