Third Notice | | 9/24/2017 | 10/12/2017 | | DONE |
|
|
|
Mailed 10-13-17
|
Second Notice | | 8/20/2017 | 9/19/2017 | | DONE |
|
|
|
Mailed 9-20-17
|
First Notice | | 7/31/2017 | 8/10/2017 | | DONE |
|
|
|
Mailed 8-11-17
|
BLD-Final | 7/20/2017 | 7/21/2017 | 7/21/2017 | A | PASS |
Mike Jordan
|
|
|
Joe or ###-#### Stacey-please call for access Phone #: ###-####. All issues were resolved. Ok for perm. occ. No card on site to sign.
|
Zoning Approval | 7/21/2017 | 7/21/2017 | 7/21/2017 | | PASS |
Brent Moore
|
|
|
|
Print Occupancy Form | | | 7/21/2017 | | DONE |
|
|
|
|
Permanent Occupancy | | | 7/21/2017 | | DONE |
|
|
|
|
BLD-Final | 7/19/2017 | 7/20/2017 | 7/20/2017 | P | NH |
Mike Jordan
|
|
|
Ryan or ###-#### Joe Phone #: ###-####. No access.
|
FIRE-Final Inspection | 7/19/2017 | 7/20/2017 | 7/20/2017 | A | PASS |
Troy Cobbley
|
|
|
life safety passed. Sticker at exit not installed yet
|
BLD-Conference | 7/18/2017 | 7/19/2017 | 7/19/2017 | A | DONE |
Mike Jordan
|
|
|
Brian or ###-#### Joe Phone #: ###-####. Walk through with owner. Needs to remove thumb turn from main exit/enterance door, provide code compliant threshold at main door. Wall that was built not on plans is being removed along with non compliant doublr door that was installed. Also provide transition from carpet to tile.
|
BLD-Final | 7/17/2017 | 7/18/2017 | 7/18/2017 | P | CANC |
Mike Jordan
|
|
|
Call for access code - Ryan Phone #: ###-####
|
FIRE-Final Inspection | 7/17/2017 | 7/18/2017 | 7/18/2017 | A | FAIL |
Troy Cobbley
|
|
|
Provide address, repair the exit discharge light, remove the thumbturn lock from the exit door (keyed,sticker,indicator ok), resubmit plans showing the revised wall layout and get plan review approval for non-ADA hardware and threshold height.
|
BLD-Energy code compliance | 11/21/2016 | 11/22/2016 | 11/22/2016 | A | PASS |
Mike Jordan
|
|
|
Joe Phone #: ###-####
|
BLD-Framing/Rough-in | 11/21/2016 | 11/22/2016 | 11/22/2016 | A | PASS |
Mike Jordan
|
|
|
Joe Phone #: ###-####
|
BLD-Framing/Rough-in | 10/13/2016 | 10/13/2016 | 10/13/2016 | P | PART |
Mike Jordan
|
|
|
Joe Phone #: ###-####. Provide truss engineering. ok to insulate.
|
BLD-Energy code compliance | 10/13/2016 | 10/13/2016 | 10/13/2016 | P | CANC |
Mike Jordan
|
|
|
Joe Phone #: ###-####
|
BLD-Framing/Rough-in | 10/11/2016 | 10/12/2016 | 10/12/2016 | A | NH |
Mike Jordan
|
|
|
Joe Phone #: ###-####. No access. Door locked. Caleed Joe, no awnser, left message.
|
BLD-Energy code compliance | 10/11/2016 | 10/12/2016 | 10/12/2016 | A | CANC |
Mike Jordan
|
|
|
Joe Phone #: ###-####
|
BLD-Foundation | 10/22/2015 | 10/23/2015 | 10/23/2015 | P | PASS |
Mike Jordan
|
|
|
Nate Phone #: ###-####
|
BLD-Footing | 10/19/2015 | 10/19/2015 | 10/19/2015 | P | PASS |
Mike Jordan
|
|
|
After 2 // Nate Phone #: ###-####
|
BLD-Footing | 10/14/2015 | 10/15/2015 | 10/15/2015 | A | FAIL |
Mike Jordan
|
|
|
Nate Phone #: ###-####. no reinforcement. Approve plans shows reinforcent in footings.
|
OVERRIDE | | | 8/26/2015 | | |
|
|
|
|
Print Occupancy Form | | | 8/26/2015 | | DONE |
|
|
|
|
Telephone call | | | 8/26/2015 | | DONE |
|
|
|
Spoke with Joe informing him that the permit is ready and just need to know who the RP will be, he'll need to bring a receipt and/or letter from ACHD and we need a 302 and a 306 as well
|
Issue PAID IN FULL permit | | | 8/26/2015 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/26/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/26/2015 | | DONE |
|
|
|
need RP, ACHD, GC & Rev cert of val-parcel owner is GC so no rev cert of val needed-requirements met
|
Routing - PLAN CHECK | 7/24/2015 | | 8/25/2015 | | PASS |
Tim L. Woodard
|
|
|
Joe brought down Architecturally stamped plans. TLW
|
Plan assigned to (TLW) | 6/12/2015 | | 8/25/2015 | | PASS |
Tim L. Woodard
|
|
|
First Review Completed. T & R Ventures Addition
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/25/2015 | | DONE |
|
|
|
|
Routing - FIRE | 7/22/2015 | 7/22/2015 | 7/24/2015 | | PASS |
Katie Marron
|
|
|
Comments attached to plans.
|
1st review completed | | | 6/19/2015 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - Erosion and Sediment | 6/18/2015 | | 6/19/2015 | | PASS |
Evan Jenkins
|
|
|
465sf exterior addition to an existing building. Site is surrounded by existing paved parking areas. No Modifications to existing stormwater features onsite.
|
Routing - PLAN CHECK | 6/19/2015 | | 6/19/2015 | | PASS |
Tim L. Woodard
|
|
|
Plan Review cannot progress until Stamped and Signed Plans are submitted. TLW
|
Routing - Design Review | 6/17/2015 | | 6/18/2015 | | PASS |
Andrea Tuning
|
|
|
|
Routing PW Drainage | 6/16/2015 | | 6/17/2015 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Sewer Rating | 6/16/2015 | | 6/17/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - PLANNING Land Div | 6/12/2015 | | 6/17/2015 | | PASS |
Dave Abo
|
|
|
|
Routing - PUBLIC WORKS | 6/15/2015 | | 6/17/2015 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PLANNING | 6/17/2015 | | 6/17/2015 | | PASS |
Cody Riddle
|
|
|
The expanded space is not approved for additional salon stations. Office/showroom space only, as approved by DRH15-002018.
|
Routing - Addressing | | | 6/15/2015 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/12/2015 | | DONE |
|
|
|
|
Intake Approval | | | 6/12/2015 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/12/2015 | | DONE |
|
|
|
|
Pending Assignment by TLW | 6/12/2015 | | 6/12/2015 | | DONE |
Tim L. Woodard
|
|
|
|
Application received | | 6/12/2015 | | | |
|
|
|
|