BLD-Final | 11/10/2015 | 11/12/2015 | 11/12/2015 | A | PASS |
Phil Shearer
|
|
|
Matt Phone #: ###-####
|
DOC - Permit Finaled | 11/12/2015 | 11/12/2015 | 11/12/2015 | P | PASS |
Phil Shearer
|
|
|
|
BLD-Energy code compliance | 8/27/2015 | 8/28/2015 | 8/28/2015 | A | PASS |
Phil Shearer
|
|
|
Matt Phone #: ###-####
|
BLD-Framing/Rough-in | 8/28/2015 | 8/28/2015 | 8/28/2015 | P | PASS |
Phil Shearer
|
|
|
Matt Phone #: ###-####
|
BLD-Energy code compliance | 8/26/2015 | 8/27/2015 | 8/27/2015 | A | NR |
Phil Shearer
|
|
|
Matt Phone #: ###-####
|
BLD-Framing/Rough-in | 8/21/2015 | 8/21/2015 | 8/21/2015 | P | PART |
Phil Shearer
|
|
|
Truss bracing T24
|
BLD-Wall Bracing | 8/21/2015 | 8/21/2015 | 8/21/2015 | P | PART |
Phil Shearer
|
|
|
#2 shear panels on the front of the house need nailed at 4"
|
Plan Modification Accepted | | | 8/10/2015 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 8/10/2015 | | 8/10/2015 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Foundation | 7/14/2015 | 7/15/2015 | 7/15/2015 | A | PASS |
Phil Shearer
|
|
|
|
BLD-Foundation | 7/14/2015 | 7/14/2015 | 7/14/2015 | P | NR |
Phil Shearer
|
|
|
Closer to 4 if possible // James Phone #: ###-####
|
BLD-Footing | 7/13/2015 | 7/13/2015 | 7/14/2015 | P | PASS |
Phil Shearer
|
|
|
James Phone #: ###-####
|
(F) Reprint permit | | | 7/10/2015 | | DONE |
|
|
|
|
PubWorks Subgrade Approval | 7/8/2015 | 7/8/2015 | 7/8/2015 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
OVERRIDE | | | 7/6/2015 | | |
|
|
|
|
Plan assigned to (AJS) | 6/22/2015 | 6/22/2015 | 7/6/2015 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
1st review completed
|
Routing - PLAN CHECK | 6/23/2015 | | 7/6/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/6/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/6/2015 | | DONE |
Christina Prado
|
|
|
All requirements met
|
Issue PAID IN FULL permit | | | 7/6/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/6/2015 | | DONE |
|
|
|
|
Routing - MECHANICAL | 6/23/2015 | | 6/25/2015 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 6/16/2015 | | 6/24/2015 | | PASS |
Sue Cummings
|
|
|
See redlines. Driveway not to exceed 33 feet in width within the front setback.
|
1st review completed | | | 6/23/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 6/16/2015 | | 6/23/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Plan assigned to (LEG) Tisha | 6/16/2015 | | 6/22/2015 | | DEFR |
Tisha Gallop
|
|
|
6/26
|
Routing - MECHANICAL | 6/16/2015 | | 6/19/2015 | | PASS |
Troy James
|
|
|
|
Routing - Addressing | 6/16/2015 | | 6/17/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 6/16/2015 | | 6/17/2015 | | PASS |
Beverly Mountain
|
|
|
|
Intake Approval | | | 6/16/2015 | | FAIL |
|
|
|
applicant needs to submit drawings
|
Intake Approval | | | 6/16/2015 | | FAIL |
|
|
|
applicant needs to put drawings in drawings folder and upload individually
|
Intake Approval | | | 6/16/2015 | | FAIL |
|
|
|
applicant needs to upload drawings individually
|
Plans ACCEPTED BY PLAN TECH | | | 6/16/2015 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 6/16/2015 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/16/2015 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 6/15/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 15 2015 1:51PM
|