Permit Information
Permit NumberBLD15-02043
StatusIssued
Name Michael Brown
Site Address 505 W BROAD ST
Project NameThe Fowler Project
Customer Number 
ePlanReviewYes
Description
(THE FOWLER – Structural Podium Permit)(Formerly the Roost)(GREEN BUILDING) Permit is to construct the super structure of the podium and slabs. This permit does not include any of the build out below the podium nor does in cover anything above the podium. Approval contingent upon adhering to the approved plans on file. Work to include: construct foundation, construct structural steel, and construct PT concrete slab. This building will be fully fire sprinklered in accordance with an NFPA 13 system in order to comply with “Special Design Standards for Type V Construction”. The Fowler is proposed to meet LEED V4.00, Gold certification for Homes. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
PubWorks Occupancy Approval5/29/20195/29/20195/29/2019 DONE
DetailsTiffany Lowery
Street Lights are bonded for per Jason Taylor
BLD-Final3/7/20183/8/20183/8/2018PPASS
DetailsDave Hannah
Jason Phone #: ###-####
PubWorks Temp Occupancy Appr2/20/20182/20/20182/20/2018 DONE
DetailsTiffany Lowery
For onsite drainage only.
BLD-Wall cover12/1/201712/4/201712/4/2017APASS
DetailsDave Hannah
Inspection request for shaft covering in trash room level 1. Phone #: ###-#### Inspection requested via web by Guillaume Chatelus
BLD-Energy code compliance10/31/201711/1/201711/1/2017APASS
DetailsDave Hannah
Inspection request for Fire Caulking at the 1st and 2nd floors. Phone #: ###-#### Inspection requested via web by Carl Benjamin
BLD-Other10/17/201710/18/201710/18/2017APASS
DetailsDave Hannah
Inspection request for drop ceiling cover. Phone #: ###-#### Inspection requested via web by Carl Benjamin
Plan Reviewer's activity  10/18/2017 DONE
DetailsAdele J Schaffeld-Griffin
Uploaded cable barrier approval from engineer and special inspection firm into ePlan.
BLD-Other10/13/201710/16/201710/16/2017APEND
DetailsDave Hannah
Inspection request for the vehicle Cable Barrier sign off. Phone #: ###-#### Inspection requested via web by Carl Benjamin
BLD-Wall cover10/10/201710/11/201710/10/2017ACANC
DetailsDave Hannah
Inspection request for the soffit sheetrock at the 3rd floor. Phone #: ###-#### >> Inspection requested via web by Carl Benjamin Inspection cancelled from web by: Carl Benjamin
BLD-Conference10/4/201710/5/201710/5/2017APEND
DetailsDave Hannah
Inspection request for vehicle barrier cable code compliance in the parking garage. Phone #: ###-#### Inspection requested via web by Guillaume Chatelus
BLD-Energy code compliance8/11/20178/14/20178/14/2017APASS
DetailsDave Hannah
Inspection request for Insulation Barrier at the 4th floor of Tower A and 3rd Floor of Tower B. Phone #: ###-#### Inspection requested via web by Carl Benjamin
BLD-Framing/Rough-in8/3/20178/4/20178/4/2017APASS
DetailsDave Hannah
Inspection request for duct chases. Phone #: ###-#### Inspection requested via web by Carl Benjamin
BLD-Other8/1/20178/2/20178/3/2017ANR
DetailsDave Hannah
Inspection request for the base of the 2 hour shaft assemblies. Phone #: ###-#### Inspection requested via web by Carl Benjamin
BLD-Other7/26/20177/27/20177/28/2017APASS
DetailsDave Hannah
Inspection request for Intumescent Paint at the Live Works Unit Columns per ASI 81 and Structural Shaft at Unit 725. Thank you. Phone #: ###-#### Inspection requested via web by Carl Benjamin
BLD-Framing/Rough-in7/25/20177/26/20177/26/2017APART
DetailsDave Hannah
Inspection request for the structural wall framing where the plumbing compromised the structural integrity at multiple areas. Reference RFI #300 Phone #: ###-#### Inspection requested via web by Carl Benjamin
BLD-Energy code compliance7/13/20177/14/20177/14/2017APART
DetailsDave Hannah
Inspection request is for the 4th floor of Tower B. Fire Caulking. Phone #: ###-#### Inspection requested via web by Carl Benjamin ok to insulate but the plumbing walls the studs have been over cut on some walls needs engineer to ok
BLD-Aging Inspection7/7/20177/7/20177/7/2017 PASS
DetailsDave Hannah
BLD-Conference3/20/20173/21/20173/21/2017ADONE
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Carl Benjamin
BLD-Conference3/14/20173/15/20173/15/2017ADONE
DetailsDave Hannah
Inspection request for Live Works Area 2hr rated walls Conference Phone #: ###-#### Inspection requested via web by Carl Benjamin
BLD-Conference2/24/20172/27/20172/27/2017ADONE
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Carl Benjamin
BLD-Framing/Rough-in2/22/20172/22/20172/23/2017PPART
DetailsDave Hannah
Chris Phone #: ###-#### ext framing first and second floor ok to cover ext.
BLD-Conference12/7/201612/8/201612/8/2016APASS
DetailsDave Hannah
Chris Phone #: ###-####
BLD-Conference6/6/20166/6/20166/6/2016PPASS
DetailsDave Hannah
Chris Phone #: ###-####
BLD-Conference5/31/20166/1/20166/1/2016ADONE
DetailsDave Hannah
Chris Phone #: ###-#### talked about sprinklers in roof
BLD-Foundation4/5/20164/8/20164/9/2016PPEND
DetailsDave Hannah
Rebar // Chris Phone #: ###-####
BLD-Foundation4/5/20164/6/20164/7/2016PPEND
DetailsDave Hannah
Chris Phone #: ###-####
BLD-Foundation4/5/20164/5/20164/7/2016PPEND
DetailsDave Hannah
Chris-Rebar Phone #: ###-####
BLD-Foundation3/30/20163/31/20163/31/2016APEND
DetailsDave Hannah
Rebar // Chris Phone #: ###-#### on site 2;30 crews are placing walls and one grade beam mti will do final inspection of rebar
BLD-Conference3/28/20163/29/20163/30/2016APART
DetailsDave Hannah
Inspection ow wall rebar and column rebar--Pour at 2pm
MTI also will be here to inspect Phone #: ###-#### Inspection requested via web by Tom Hayes
BLD-Foundation3/25/20163/28/20163/29/2016APART
DetailsDave Hannah
Chris-rebar Phone #: ###-#### column pads elev. foundation spec inspecion will do final and pull concrete test cyl.
BLD-Conference3/24/20163/25/20163/25/2016APART
DetailsMike Jordan
Wall and footing rebar inspection am. Concrete pour at 1 pm
Contact Tom Hayes with Andersen Construction for any questions, phone number is listed above Phone #: ###-#### Inspection requested via web by Tom Hayes. Work in progress, pend. special inspection.
BLD-Conference3/9/20163/10/20163/10/2016APASS
DetailsDave Hannah
Footing Rebar inspections Grids 2-9 and B-H
Note:: Pouring real early today, Dave Hannah Looked at Wednesday afternoon
Contact: Tom Hayes Phone #: ###-#### Inspection requested via web by Tom Hayes
BLD-Conference2/25/20163/1/20163/1/2016ADONE
DetailsDave Hannah
Duel Phone #: ###-####
Issue PAID IN FULL permit  1/8/2016 DONE
Inspection Record Card- Bld  1/8/2016 DONE
Extend Review Timeline  11/25/2015 DONE
1st 180 days granted by Jason B. See documents
Expiration Notice11/18/201512/10/201511/18/2015 DONE
DetailsBrittany Hill
Print Statement  9/18/2015 DONE
OVERRIDE  9/2/2015  
Plan assigned to (TLW)6/23/2015 9/2/2015 PASS
DetailsTim L. Woodard
Due 7/24
Routing - PLAN CHECK8/25/2015 9/2/2015 PASS
DetailsTim L. Woodard
Approved. Comments and Concerns will be addressed with the Shell and Core Permit. TLW
Routing PW Sewer Design8/25/2015 9/2/2015 PASS
DetailsKyle S. Rosenmeyer
Routing PW Geothermal8/25/2015 9/2/2015 PASS
DetailsTim L. Woodard
Approved in E-Plan Review. TLW
Routing Off Site - STRUCTURAL8/25/2015 9/2/2015 PASS
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  9/2/2015 DONE
Permit Ready to Issue  9/2/2015 DONE
DetailsChristina Prado
All requirements met
Plan resubmittals received  8/25/2015 DONE
Routing Off Site - STRUCTURAL7/24/2015 8/13/2015 FAIL
DetailsTim L. Woodard
Refer to changemarks on the drawings. TLW
Routing PW Environmental7/24/2015 8/13/2015 PASS
DetailsRick Christenson
Approved in E-Plan. TLW
Routing - PLAN CHECK7/24/2015 8/13/2015 PASS
DetailsTim L. Woodard
Route to Impact Fee Review7/21/20157/24/20158/12/2015 PASS
DetailsCindy M. Gould
Waiting for shell and core permit.
Routing PW Drainage7/24/2015 8/6/2015 PASS
DetailsBrian Murphy
Routing PW Sewer Design7/24/2015 8/6/2015 FAIL
DetailsKyle S. Rosenmeyer
Add contractor note: Contact Boise Public Works 48 hours prior to capping existing sewer services or connecting new services to the sewer main to schedule an inspection and obtain plug/tap permits.
Also, update sewer notes on cover page.
Routing - Addressing8/6/2015 8/6/2015 PASS
DetailsEmily Dixon
Routing PW Geothermal7/24/2015 7/30/2015 FAIL
DetailsJavier Guzman
Geothermal service application required. Contact Boise Public Works, Jon Gunnerson, 208.384.3935.
Routing - FIRE7/27/20157/27/20157/29/2015 PASS
DetailsScott Arellano
Attached comments to plans. Final approval pending approved code alternate request.
Routing - Addressing7/24/2015 7/28/2015 FAIL
DetailsEmily Dixon
Parcels need to be consolidated.
Routing - PLANNING Land Div7/24/2015 7/27/2015 PASS
DetailsDave Abo
Parcel A of ROS 10162. (ROS15-00053) N.O.B.P signed by Planning Director on 7/8/15.
Routing PW Solid Waste6/23/2015 7/20/2015 PASS
DetailsMegan Durrell
Approved in E-Plan. TLW
Routing - PLUMBING7/20/2015 7/20/2015 PASS
DetailsDaryl Spivey
Per plan and ISPC.
1st review completed  7/20/2015 DONE
Routing - PLAN CHECK6/23/2015 7/20/2015 FAIL
DetailsTim L. Woodard
Refer to corrections in E-Plan Review. TLW
Routing - PUBLIC WORKS6/23/2015 7/20/2015 PASS
DetailsTim L. Woodard
Refer to E-Plan Review. TLW
Routing Off Site - STRUCTURAL6/23/2015 7/20/2015 FAIL
DetailsTim L. Woodard
Routing - PLANNING Land Div7/17/2015 7/17/2015 PASS
DetailsDave Abo
ROS recorded on July 7, 2015 ROS10162
Notice of Buildable Parcel recorded on 7/8/15.
Todd Tucker signed off in ePlan on 6/25/15.
Routing PW Environmental6/23/2015 7/14/2015 PASS
DetailsRick Christenson
Contacted for verification of exterior interceptors, will review when plumbing fixtures are added.
Routing - FIRE7/6/2015 7/8/2015 FAIL
DetailsKatie Marron
Report attached to case and emailed to architect.
Routing PW Drainage6/23/2015 7/6/2015 PASS
DetailsBrian Murphy
Routing PW Sewer Design6/23/2015 6/30/2015 FAIL
DetailsKyle S. Rosenmeyer
Add contractor note: Contact Boise Public Works 48 hours prior to capping existing sewer services or connecting new services to the sewer main to schedule an inspection and obtain plug/tap permits.
Also, update sewer notes on cover page.
Routing - MECHANICAL6/23/2015 6/29/2015 PASS
DetailsTroy James
No mechanical review. Reference only sheets.
Routing - PLUMBING6/23/2015 6/29/2015 FAIL
DetailsDaryl Spivey
An engineered stamped set of plans required for plumbing review.
Routing PW Geothermal6/23/2015 6/25/2015 FAIL
DetailsJon R. Gunnerson
Application for geothermal service required. Contact Public Works Geothermal, Jon Gunnerson @ ###-####.
Routing - Design Review6/23/2015 6/23/2015 PASS
DetailsSarah Schafer
Approved per DRH15-00152.
Pending Assignment by TLW6/23/2015 6/23/2015 DONE
DetailsTim L. Woodard
Routing PW Street Lights6/23/2015 6/23/2015 PASS
DetailsMike D Hedge
Street light information to be on next plan submission.
Routing - Addressing6/23/2015 6/23/2015 FAIL
DetailsEmily Dixon
Parcels need to be consolidated.
Routing - Erosion and Sediment6/23/2015 6/23/2015 PASS
DetailsEvan Jenkins
(Site Prep Inspection and Approval Required Prior to Any Earth Disturbance)

Podium Permit Application for a new 7 story mixed use project. Also includes site improvements/landscaping and parking areas. New sewer mains, power etc...
Intake Approval  6/19/2015 FAIL
DetailsAdele J Schaffeld-Griffin
Please complete and upload the completed 502 check list. Once this is receive I will begin the prescreen.
Intake Approval  6/19/2015 PASS
DetailsTim L. Woodard
Application received  6/15/2015 DONE
Application submitted via PDS Online on Jun 15 2015 3:10PM