Information based on query as of Sunday, June 23, 2024.
Permit Information
Permit NumberBLD15-02068
StatusFinaled
Name JON RANDALL CONSTRUCTION
Site Address 3050 S SHOSHONE ST
Project NameHoliday Inn Express
Customer Number 
ePlanReviewYes
Description
(HOLIDAY INN EXPRESS - SWIMMING POOL) To construct a 25 foot by 18 foot rectangular new indoor swimming pool within hotel building per approved plans. NOTE: all egress, lighting, etc. was reviewed under BLD15-00516. This permit is strictly for the structural pool, electrical within the pool, access into the pool, new plumbing, and pool finishes only. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/14/20169/14/20169/14/2016PPASS
DetailsJim Storey
DOC - Permit Finaled9/14/20169/14/20169/14/2016PPASS
DetailsJim Storey
BLD-Final8/26/20168/29/20168/29/2016APASS
DetailsMike Jordan
John-Pool Phone #: ###-####
FIRE-Final Inspection8/26/20168/26/20168/26/2016PPASS
DetailsTroy Cobbley
Life safety passed
FIRE-Final Inspection8/25/20168/25/20168/25/2016PFAIL
DetailsTroy Cobbley
No approved plans on site. No inspection performed.
Print Occupancy Form  8/24/2016 DONE
BLD-Final8/17/20168/18/20168/19/2016ANR
DetailsJim Storey
Jon Phone #: ###-#### pending others
BLD-Final8/10/20168/11/20168/12/2016ANR
DetailsJim Storey
Jon Phone #: ###-#### pending trade permits
BLD-Aging Inspection8/9/20168/9/20168/11/2016 FAIL
DetailsJim Storey
BLD-Aging Inspection8/8/20168/8/20168/11/2016 FAIL
DetailsJim Storey
Issue PAID IN FULL permit  9/24/2015 DONE
Inspection Record Card- Bld  9/24/2015 DONE
OVERRIDE  9/17/2015  
Routing - FIRE9/16/20159/16/20159/17/2015 PASS
DetailsScott Arellano
Revised comments attached to case.
Permit Ready to Issue  9/17/2015 DONE
Need RP, GC and Revise Cert of Value-GC turned permit app in so all we need now is the GC form-received GC Form so all requirements me
Plan assigned to (TLW)8/24/2015 9/17/2015 DONE
DetailsTim L. Woodard
1st review complete - Level 3 TI - ePlanReview - Holiday Inn Express Pool
Plan resubmittals received  9/16/2015 DONE
Routing - PLAN CHECK9/16/2015 9/16/2015 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK8/24/2015 9/15/2015 PASS
DetailsTim L. Woodard
1st review completed  9/15/2015 DONE
Routing - PLANNING8/24/2015 8/31/2015 PASS
DetailsLeon Letson
Leon Letson - CUP14-00081
Routing - Design Review8/24/2015 8/28/2015 PASS
DetailsJosh Wilson
DRH14-00415
Routing - MECHANICAL8/24/2015 8/26/2015 PASS
DetailsTroy James
Indoor swimming pool - ventilation
Routing - FIRE8/24/20158/24/20158/25/2015 FAIL
DetailsScott Arellano
Comments attached to case and emailed to architect.
Routing - PLUMBING8/24/2015 8/25/2015 PASS
DetailsBill VanDegrift
Routing - Addressing8/24/2015 8/24/2015 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS8/24/2015 8/24/2015 PASS
DetailsJennifer Bruner
Routing - Erosion and Sediment8/24/2015 8/24/2015 PASS
DetailsEvan Jenkins
(HOLIDAY INN EXPRESS - SWIMMING POOL) To construct a new indoor swimming pool within hotel building.
Pending Assignment by JCB8/24/2015 8/24/2015 DONE
DetailsJason Blais
Routing PW Sewer Rating8/24/2015 8/24/2015 PASS
DetailsJennifer Bruner
Intake Approval  8/21/2015 PASS
DetailsJason Blais
Prescreen approved by Carl Madsen and plan review fees paid.
Intake Approval  8/17/2015 FAIL
Intake Approval  6/22/2015 FAIL
DetailsCarl Westfall
(6-22-15) Please fill out and upload to the Documents Folder Form #538 - Commercial Swimming Pool and Spa Submittal Checklist. We have already discussed this requirement. Provide all the applicable documents and drawings noted on the form. If you have questions call Carl J. Westfall at ###-####.
Intake Approval  6/17/2015 FAIL
DetailsCarl Westfall
The drawings and documents were moved and arranged to be compatible with our ePlanReview standards. This is intended to be instructional only. Please follow the standard.

1) A plan intake checklist was uploaded to illustrate what is required. Please down load the checklist from the City’s web page and completely fill it out. Upload the completed document into the documents folder. Provide everything that is noted and that applies to this project.

2) The uploaded drawing sheets are 11” x 8-1/2”. If these are printed out at this size they will be unreadable. Please upload drawings that will print out as the actual size they were when they were created.

A plan intake review will be done when a complete application is submitted.
Application received  6/16/2015 DONE
Application submitted via PDS Online on Jun 16 2015 3:29PM
First Notice9/14/20169/14/2016   
DetailsJim Storey