Telephone call | | | 2/25/2016 | | DONE |
|
|
|
Left a message with Mike for Larry. Questions about the final values sent in. wondering if the PLM and MEC were flipped by mistake
|
First Notice | | 12/28/2015 | 1/11/2016 | | DONE |
|
|
|
Mailed 1-12-16
|
BLD-Final | 12/18/2015 | 12/18/2015 | 12/18/2015 | P | PASS |
Jim Storey
|
|
|
|
Zoning Approval | 12/18/2015 | 12/18/2015 | 12/18/2015 | | DONE |
Andrea Tuning
|
|
|
|
Permanent Occupancy | | | 12/18/2015 | | DONE |
|
|
|
|
BLD-Final | 12/15/2015 | 12/16/2015 | 12/16/2015 | P | PASS |
Jim Storey
|
|
|
Larry Phone #: ###-#### final ok pending others
|
BLD-Conference | 12/14/2015 | 12/14/2015 | 12/14/2015 | P | DONE |
Bob Archibald
|
|
|
ADA grab bars in childrens restrooms. Bars behind stools to be installed 1.5" above lids.
|
FIRE-Final Inspection | 12/11/2015 | 12/11/2015 | 12/11/2015 | P | PASS |
Jim Page
|
|
|
No fire sprinklers, fire alarm inspection complete. Life fire safety inspection passed/complete. The northwest door of tenant space (kitchen/dishwasher area) has thumb-turn deadblot on door, instructed to the superintendant of jod that the thumb turn will need to be changed to double key assembly or removed, he instructed to me that the thumb-turn was keyed for construction access and that the thumb-turn will be removed at completion of project.
|
BLD-Ceiling Grid Inspection | 11/24/2015 | 11/24/2015 | 11/24/2015 | P | PASS |
Jim Storey
|
|
|
Larry Phone #: ###-#### pending ele
|
BLD-Energy code compliance | 10/20/2015 | 10/21/2015 | 10/21/2015 | A | PASS |
Jim Storey
|
|
|
Larry Phone #: ###-####
|
BLD-Framing/Rough-in | 10/19/2015 | 10/20/2015 | 10/20/2015 | A | PART |
Jim Storey
|
|
|
Larry Phone #: ###-#### screws 4 corners/ slamer on fire wall/ start rock.
|
Issue PAID IN FULL permit | | | 9/18/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/18/2015 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/18/2015 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/18/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 8/21/2015 | | |
|
|
|
|
Plan assigned to (CJW) | 6/22/2015 | 6/22/2015 | 8/21/2015 | | PASS |
Carl Westfall
|
|
|
KIDS CHOICE DAYCARE (July 10 - 15 days) Level 3 TI - ePlanReview
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/21/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/21/2015 | | DONE |
|
|
|
***MET*** NEED GC form and certificate of value, RP and ACHD---------------ONLY NEED ACHD as of 8-24-15
|
Routing - PLAN CHECK | 8/19/2015 | | 8/21/2015 | | DONE |
Carl Westfall
|
|
|
Routing completed
|
Routing - Erosion and Sediment | 8/19/2015 | | 8/19/2015 | | PASS |
Evan Jenkins
|
|
|
KIDS CHOICE DAYCARE – SOUTH END OF BUILDING) This building does not have a fire sprinkler system. To create an 8,546 square foot daycare tenant space within an existing 10,795 square foot commercial building defined by the existing exterior walls and an existing fire wall (about 13,600 square feet total including canopies). Work is to include 6 restrooms accessible to the disabled (4 using accessible dimensions for children), furring and insulation installed on the inside of exterior walls, interior nonbearing walls, an interior 2-hr fire barrier wall to define the childcare fire area, interior doors, interior windows, new openable exterior windows, new exterior doors, a Type I grease hood, millwork, and finishes. New openings will be created in the existing exterior masonry walls. Work includes steel angle irons, steel plates, and through bolts. Special Inspection is required for welding, grouting, bolting, and epoxy anchors.
|
Plan resubmittals requested | | | 8/19/2015 | | DONE |
|
|
|
|
Plan resubmittals received | | | 8/19/2015 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 8/14/2015 | | 8/17/2015 | | FAIL |
Evan Jenkins
|
|
|
ESC Waiver Request Letter Required Commercial T.I for Approval per BCC -8-17. Evan Jenkins 794.3958
|
Routing Off Site - C.D.H | 8/14/2015 | | 8/17/2015 | | PASS |
Carl Westfall
|
|
|
Natasha Ferney
|
Routing - PLAN CHECK | 8/13/2015 | | 8/14/2015 | | PASS |
Carl Westfall
|
|
|
Drawings approved with redlines
|
Plan resubmittals received | | | 8/13/2015 | | DONE |
|
|
|
|
Routing Off Site - C.D.H | 6/22/2015 | | 7/22/2015 | | FAIL |
|
|
|
A review could not be done. Documents not loaded.
|
Plan resubmittals requested | | | 7/22/2015 | | DONE |
|
|
|
Work flow sent back to the Architect.
|
Plan resubmittals requested | | | 7/17/2015 | | DONE |
|
|
|
|
1st review completed | | | 7/17/2015 | | DONE |
|
|
|
Held up by CDHD. They did not accept the task in ePlanReview until July 22. Called multiple times to get them to do something with it. They need a sit down meeting with the Architect. Since the IBC plan review report was sent on July 17, that was considered to be the 1st review complete date.
|
Routing - PLAN CHECK | 6/22/2015 | | 7/17/2015 | | FAIL |
Carl Westfall
|
|
|
Revised drawings required
|
Routing - FIRE | 6/22/2015 | 6/22/2015 | 7/10/2015 | | PASS |
Scott Arellano
|
|
|
Comments attached to case
|
Routing - PLANNING | 6/22/2015 | | 6/24/2015 | | PASS |
Ted Vanegas
|
|
|
Ted Vanegas - CUP15-00024
ePlanReview show the completed date as July 15, 2015.
|
Routing PW Sewer Rating | 6/23/2015 | | 6/24/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Erosion and Sediment | 6/22/2015 | | 6/23/2015 | | FAIL |
Evan Jenkins
|
|
|
ESC Waiver Request Letter Required for Approval per BCC -8-17. Evan Jenkins 794.3958
(KIDS CHOICE DAYCARE) NEW DAY CARE IN EXISTING BUILDING. Work to include New exterior concrete site work on east side of building.
|
Routing - Addressing | 6/22/2015 | | 6/23/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 6/22/2015 | | 6/23/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Intake Approval | | | 6/22/2015 | | PASS |
Jason Blais
|
|
|
Prescreen approved by Tim Woodard and plan review fees paid.
|
Pending Assignment by JCB | 6/22/2015 | | 6/22/2015 | | DONE |
Jason Blais
|
|
|
|
Routing - PLUMBING | 6/22/2015 | | 6/22/2015 | | PASS |
Bill VanDegrift
|
|
|
See redline notes on floor drains required in 2 restrooms.
|
Plan Reviewer's activity | | | 6/22/2015 | | DONE |
Jason Blais
|
|
|
Emailed architect to have him contact ACHD to evaluate if any additional impact fees are due. Written verification from ACHD shall be provided to our Permit Counter prior to the building permit being issued.
|
Application received | | | 6/17/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 17 2015 10:07AM
|