BLD-Final | 7/1/2015 | 7/2/2015 | 7/2/2015 | A | PASS |
Dave Hannah
|
|
|
Aaron Phone #: ###-####
|
DOC - Permit Finaled | 7/2/2015 | 7/2/2015 | 7/2/2015 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Footing | 6/29/2015 | 7/1/2015 | 7/1/2015 | A | PASS |
Jim Sly
|
|
|
Sub grade inspector will be there at 2:00 if you want to be there when they are. Aaron will be doing the installation and his cell number is ###-####. Thanks, Rich. Phone #: ###-#### Inspection requested via web by rich prasch
|
PubWorks Subgrade Approval | 7/1/2015 | 7/1/2015 | 7/1/2015 | | DONE |
Jason C. Taylor
|
|
|
***PATIO COVER FOOTINGS**A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 6/26/2015 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 6/18/2015 | 6/18/2015 | 6/18/2015 | A | PASS |
Tisha Gallop
|
|
|
|
Routing Walk-In (PW Hillside) | 6/17/2015 | 6/17/2015 | 6/18/2015 | P | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Inspection Record Card- Bld | | | 6/18/2015 | | DONE |
|
|
|
|
Plan assigned to (LEG) Tisha | 6/18/2015 | | 6/18/2015 | | DONE |
Tisha Gallop
|
|
|
|
1st review completed | | | 6/18/2015 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/18/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/18/2015 | | DONE |
|
|
|
all requirements met
|
Telephone call | | | 6/18/2015 | | DONE |
|
|
|
called Covertech- told them that permit is ready for pick up and fees due
|
Routing Walk-In (Zoning) | 6/17/2015 | 6/17/2015 | 6/17/2015 | A | DONE |
Sue Cummings
|
|
|
|
Application received | | 6/17/2015 | | | |
|
|
|
|