Permit Information
Permit NumberBLD15-02087
StatusFinaled
Name WOOD RIVER BUILDERS
Site Address 562 E ORION CT
Project Name562 e orion
Customer Number 
ePlanReviewYes
Description
Permit for the construction of a new 5,133 sq. ft., two story (main level 3,880 sq. ft., lower level 1,253 sq. ft.) single family dwelling with 4 bedrooms, 6 and a half bathrooms, approximately 613 sq. ft. of covered patio/porch and a 1,200 sq. ft. attached garage per the approved plans, Engineering, ACCA report and any notations. R-1A zoning and setbacks per planning. //leg ***A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/28/20167/29/20167/29/2016APASS
DetailsJim Sly
Bob Phone #: ###-####
DOC - Permit Finaled7/29/20167/29/20167/29/2016PPASS
DetailsJim Sly
PubWorks Occupancy Approval7/12/20167/12/20167/12/2016 DONE
DetailsJason C. Taylor
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
BLD-Other1/20/20161/21/20161/21/2016APART
DetailsTony Young
Bob-- Fire soffit inspection Phone #: ###-####,, ok to start covering with fire treated t &g material
BLD-Other1/19/20161/20/20161/20/2016APART
DetailsTony Young
Bob-- Fire soffit inspection Phone #: ###-####,, material on site
BLD-Energy code compliance11/6/201511/6/201511/6/2015PPASS
DetailsJim Storey
Bob Phone #: ###-####
BLD-Energy code compliance11/5/201511/5/201511/5/2015PNR
DetailsTony Young
Bob Phone #: ###-####
BLD-Framing/Rough-in10/30/201511/2/201511/2/2015APART
DetailsTony Young
Bob Phone #: ###-####,, correction posted
BLD-Other10/28/201510/28/201510/28/2015PPASS
DetailsTony Young
Bob Phone #: ###-####,, soffits ok
BLD-Wall Bracing10/27/201510/28/201510/28/2015APASS
DetailsTony Young
Bob Phone #: ###-####
Plan Modification Accepted  10/12/2015 DONE
new manual j report
Routing - MECHANICAL10/12/2015 10/12/2015 PASS
DetailsTroy James
New manual j report. Contractor to build room for second level furnace.
BLD-Wall Bracing10/6/201510/7/201510/7/2015APART
DetailsDave Hannah
Bob Phone #: ###-#### c/n on site missing holddowns ok to cover ext city plans marked up
BLD-Foundation8/7/20158/7/20158/7/2015PPART
DetailsTony Young
Wall // Pat Phone #: ###-####,, work in progress
BLD-Footing8/6/20158/6/20158/6/2015PPART
DetailsTony Young
Pat Phone #: ###-####,, work in progress
PubWorks Subgrade Approval8/5/20158/5/20158/5/2015 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
Issue PAID IN FULL permit  7/27/2015 DONE
DetailsChristina Prado
Inspection Record Card- Bld  7/27/2015 DONE
DetailsChristina Prado
OVERRIDE  7/23/2015  
Plan assigned to (LEG) Tisha6/22/2015 7/23/2015 DONE
DetailsTisha Gallop
1st review 7/20 L2 ePlan; pending hillside
(make sure subgrade insp scope is in)
Routing PW Grading-Hillside7/21/2015 7/23/2015 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
PLANS/APPL TAKEN TO FRONT DESK  7/23/2015 DONE
Permit Ready to Issue  7/23/2015 DONE
requirements met
Plan resubmittals received  7/21/2015 DONE
Routing - PLAN CHECK7/21/2015 7/21/2015 PASS
DetailsTisha Gallop
1st review completed  7/20/2015 FAIL
pending plan check and PW Grading-Hillside
Routing - PLAN CHECK6/22/2015 7/20/2015 FAIL
DetailsTisha Gallop
Routing PW Grading-Hillside  7/6/2015 FAIL
I have reviewed the permit for the above mentioned address. Please have a Foundation Plan & Grading Plan sent over to your geotechnical engineer (Strata) to address the structure and the adjacent slopes. The columns on the rear (east) seem to be too close to the slope with the elevation given on the foundation plan. The grading plan needs to show the slope away from the structure on the south side as well. I think you may need a small retaining wall there. Also, the foundation plan is incorrect as it shows your columns going 30’ into the ground. I believe you need a well drilling permit for that type of excavation. Let me know if you have any questions.
Routing - MECHANICAL  6/26/2015 PASS
Routing - FIRE6/25/2015 6/25/2015 PASS
DetailsScott Arellano
This home has been evaluated for Fire Department Vehicle access. Approved as shown.
Routing - PLANNING  6/23/2015 PASS
Routing - PUBLIC WORKS6/22/2015 6/23/2015 PASS
DetailsConnie Baumgartner
Routing - Erosion and Sediment6/22/2015 6/22/2015 PASS
DetailsEvan Jenkins
(Site Prep Inspection and Approval Required prior to Any Earth Disturbance)

Permit for the construction of a new 5,133 sq. ft., two story (main level 3,880 sq. ft., lower level 1,253 sq. ft.) single family dwelling with 4 bedrooms, 6 and a half bathrooms, approximately 500 sq. ft. of covered patio/porch and a 1,200 sq. ft. attached garage
Routing - Addressing6/22/2015 6/22/2015 PASS
DetailsEmily Dixon
Intake Approval  6/22/2015 PASS
Intake Approval  6/19/2015 FAIL
NEED to have Erosion and Grading plans stamped by engineer.
Application received  6/17/2015 DONE
Application submitted via PDS Online on Jun 17 2015 2:39PM