BLD-Conference | 5/10/2016 | 5/10/2016 | 5/13/2016 | P | PASS |
Jim Sly
|
|
|
|
DOC - Permit Finaled | 5/13/2016 | 5/13/2016 | 5/13/2016 | P | PASS |
Jim Sly
|
|
|
|
BLD-Aging Inspection | 5/9/2016 | 5/9/2016 | 5/10/2016 | | CANC |
Jim Sly
|
|
|
|
Plan assigned to (LEG) Tisha | 6/19/2015 | | 6/24/2015 | | DONE |
Tisha Gallop
|
|
|
6/19 solar panels; routed to fire
|
Routing - PLAN CHECK | 6/23/2015 | | 6/24/2015 | | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 6/24/2015 | | DONE |
Javier Guzman
|
|
|
1st review not entered on 6/19 when failed
|
Case Summary (BLD) | | | 6/24/2015 | | DONE |
Javier Guzman
|
|
|
|
Inspection Record Card- Bld | | | 6/24/2015 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/24/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/24/2015 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 6/24/2015 | | DONE |
Christina Prado
|
|
|
|
Routing - FIRE | 6/19/2015 | 6/19/2015 | 6/23/2015 | | PASS |
Scott Arellano
|
|
|
Approved with alternative roof access and ventilation points provided.
|
Plan resubmittals received | | | 6/23/2015 | | DONE |
|
|
|
received; engineer approval letter, solar panel calcs, plans
|
Routing Walk-In (BLD) | 6/19/2015 | 6/19/2015 | 6/19/2015 | A | FAIL |
Tisha Gallop
|
|
|
need engineering for roof mounting
|
Routing Walk-In (BLD) | 6/18/2015 | 6/18/2015 | 6/18/2015 | P | CANC |
Tisha Gallop
|
|
|
no contact
|
Application received | | 6/18/2015 | | | |
|
|
|
|
Routing - PLAN CHECK | | | | | |
Tisha Gallop
|
|
|
|