DOC - Permit Finaled | | | 9/14/2015 | | DONE |
|
|
|
as per david hannah sign-off
|
BLD-Final | 8/17/2015 | 8/17/2015 | 8/17/2015 | P | PASS |
Dave Hannah
|
|
|
Korrey Phone #: ###-####
|
Issue PAID IN FULL permit | | | 7/1/2015 | | DONE |
|
|
|
|
Telephone call | | | 6/30/2015 | | DONE |
|
|
|
called and left messege for customer with the fees due, bond, and sewer cap needed.
|
OVERRIDE | | | 6/22/2015 | | |
|
|
|
|
Telephone call | | | 6/22/2015 | | DONE |
|
|
|
called Jason to let know permit is ready and how much is owed. Also that we need the bvond and sewer cap-sent him a email stating what the bond is and how he can pay
|
Routing - Erosion and Sediment | 6/22/2015 | | 6/22/2015 | | PASS |
Andy J. Long
|
|
|
ESC site map and SWPPP narative submitted for site demolition and new vertical construction. Environmentally sensitve. Plans approved, valid PD and RP designated. Site BMP preparation inspection REQUIRED.
|
Routing - FRONT DESK | 6/22/2015 | | 6/22/2015 | | PASS |
Andy J. Long
|
|
|
|
Permit Ready to Issue | | | 6/22/2015 | | DONE |
|
|
|
need bond, sewer cap-plans are in the commercial drawer (N)
|
Plans ACCEPTED BY PLAN TECH | | | 6/19/2015 | | DONE |
|
|
|
|
Application received | | 6/19/2015 | | | |
|
|
|
|