BLD-Final | 10/7/2016 | 10/7/2016 | 10/7/2016 | P | PASS |
Jim Sly
|
|
|
Daniel Phone #: ###-####
|
DOC - Permit Finaled | 10/7/2016 | 10/7/2016 | 10/7/2016 | P | PASS |
Jim Sly
|
|
|
|
DOC - Permit Finaled | 10/7/2016 | 10/7/2016 | 10/7/2016 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 10/6/2016 | 10/6/2016 | 10/6/2016 | P | FAIL |
Mike Jordan
|
|
|
Dan Phone #: ###-####. INstall handrail in garage stairs. Provide handrail off back patio. provide code compliant handrail to basement. Correction notice issued.
|
BLD-Final | 10/5/2016 | 10/5/2016 | 10/5/2016 | P | NR |
Jim Sly
|
|
|
Dan Phone #: ###-####
|
BLD-Energy code compliance | 8/26/2016 | 8/29/2016 | 8/29/2016 | A | PASS |
Tony Young
|
|
|
Dan Phone #: ###-####
|
BLD-Framing/Rough-in | 8/26/2016 | 8/26/2016 | 8/26/2016 | P | PASS |
Tony Young
|
|
|
Dan Phone #: ###-####
|
BLD-Framing/Rough-in | 8/23/2016 | 8/24/2016 | 8/24/2016 | A | PASS |
Tony Young
|
|
|
To cover // Daniel Phone #: ###-####,, ok to insulate
|
BLD-Wall cover | 8/22/2016 | 8/23/2016 | 8/23/2016 | P | PASS |
Tony Young
|
|
|
To cover // Daniel Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 7/19/2016 | | DONE |
|
|
|
|
(F) Reprint permit | | | 7/19/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 7/18/2016 | | |
|
|
|
|
Plan assigned to (DAF) | 6/27/2016 | 6/27/2016 | 7/18/2016 | | DONE |
David Ferguson
|
|
|
due 6/29 - plan mod failed - left voicemail for Dan 6/29 - need more details, elevations and revised engineering.
|
Inspection Record Card- Bld | | | 7/18/2016 | | DONE |
|
|
|
|
Telephone call | | | 7/18/2016 | | DONE |
|
|
|
Left a message for Daniel informing him that his plans for the plan mod is ready to be picked up and there is an additional fee due
|
Plan Modification Accepted | | | 7/18/2016 | | DONE |
|
|
|
plan mod corrections turned in-received 2 sets of sheet A1, A3, A4, S3, S4 & S5-took to Dave F
|
Routing - PLAN CHECK | 7/18/2016 | | 7/18/2016 | | PASS |
David Ferguson
|
|
|
|
Case Summary (BLD) | | | 7/18/2016 | | DONE |
David Ferguson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/18/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/18/2016 | | DONE |
|
|
|
DO NOT REISSUE PLAN MOD
|
Plan resubmittals received | | | 6/30/2016 | | DONE |
|
|
|
received two copies of sheet A1 and A1.1- gave to Dave
|
Routing - PLAN CHECK | 6/27/2016 | | 6/29/2016 | | FAIL |
David Ferguson
|
|
|
|
Routing - PLANNING | 6/29/2016 | | 6/29/2016 | | PASS |
Colleen T Carroll
|
|
|
Tub/Shower needs to be removed unless approved as an Acessory Dwelling Unit.
|
Plan Modification Accepted | | | 6/27/2016 | | DONE |
|
|
|
received modifications to plan sheets (A3) & (A4)
|
BLD-Energy code compliance | 5/10/2016 | 5/11/2016 | 5/11/2016 | A | PASS |
Dave Hannah
|
|
|
Dan Phone #: ###-####
|
BLD-Framing/Rough-in | 5/5/2016 | 5/6/2016 | 5/6/2016 | A | PASS |
Tony Young
|
|
|
Daniel Phone #: ###-####
|
BLD-Framing/Rough-in | 4/28/2016 | 4/29/2016 | 4/29/2016 | A | FAIL |
Phil Shearer
|
|
|
Daniel Phone #: ###-####. Truss bracing, Missing nails in truss hangers, missing hanger on jack truss, Header over over patio door 2nd floor 2PLY LVL per plans, /beam cap missing screws, Fire blocking mech and plumbing chase, Air seal.
|
Plan Modification Accepted | | | 4/4/2016 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 4/4/2016 | | 4/4/2016 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Aging Inspection | 3/31/2016 | 3/31/2016 | 4/1/2016 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 3/30/2016 | 3/30/2016 | 4/1/2016 | | PEND |
Tony Young
|
|
|
|
BLD-Foundation | 11/16/2015 | 11/17/2015 | 11/17/2015 | A | PART |
Tony Young
|
|
|
Cal Phone #: ###-####,, rebar in place
|
BLD-Footing | 11/16/2015 | 11/16/2015 | 11/16/2015 | P | PASS |
Tony Young
|
|
|
Cal Phone #: ###-####,, porch footings,, front and rear,, ok
|
BLD-Foundation | 10/5/2015 | 10/5/2015 | 10/5/2015 | P | PART |
Tony Young
|
|
|
Cal Phone #: ###-####,, garage and basement wall ok
|
BLD-Footing | 9/8/2015 | 9/8/2015 | 9/8/2015 | P | PART |
Tony Young
|
|
|
Cal Phone #: ###-####,, work in progress
|
Issue PAID IN FULL permit | | | 8/11/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 7/23/2015 | | |
|
|
|
|
Plan assigned to (DAF) | 7/14/2015 | 7/14/2015 | 7/23/2015 | | PASS |
David Ferguson
|
|
|
|
Routing - PLAN CHECK | 7/23/2015 | | 7/23/2015 | | PASS |
David Ferguson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/23/2015 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 7/23/2015 | | DONE |
David Ferguson
|
|
|
|
Permit Ready to Issue | | | 7/23/2015 | | DONE |
|
|
|
ALL REQUIREMENTS MET
|
Inspection Record Card- Bld | | | 7/23/2015 | | DONE |
|
|
|
|
1st review completed | | | 7/16/2015 | | DONE |
David Ferguson
|
|
|
|
Routing - PLAN CHECK | 6/30/2015 | | 7/16/2015 | | PEND |
David Ferguson
|
|
|
Waiting for engineering for basement footing, beam and header
|
Plan assigned to (LEG) Tisha | 6/23/2015 | | 7/14/2015 | | DEFR |
Tisha Gallop
|
|
|
7/06
|
Routing - MECHANICAL | 6/25/2015 | | 6/30/2015 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 6/24/2015 | | 6/25/2015 | | PASS |
Colleen T Carroll
|
|
|
|
Routing - Addressing | 6/23/2015 | | 6/24/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 6/23/2015 | | 6/24/2015 | | PASS |
Connie Baumgartner
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/23/2015 | | DONE |
|
|
|
|
Intake Approval | | | 6/23/2015 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/23/2015 | | DONE |
|
|
|
|
Application received | | 6/23/2015 | | | |
|
|
|
|