BLD-Final | 11/30/2015 | 12/1/2015 | 12/1/2015 | P | PASS |
Jim Storey
|
|
|
Bryan Phone #: ###-####
|
DOC - Permit Finaled | 12/1/2015 | 12/1/2015 | 12/1/2015 | P | PASS |
Jim Storey
|
|
|
|
BLD-Energy code compliance | 10/1/2015 | 10/2/2015 | 10/2/2015 | A | PASS |
Jim Storey
|
|
|
Brian Phone #: ###-####
|
BLD-Framing/Rough-in | 9/30/2015 | 10/1/2015 | 10/1/2015 | A | PASS |
Jim Storey
|
|
|
Bryan Phone #: ###-####
|
BLD-Framing/Rough-in | 9/25/2015 | 9/28/2015 | 9/28/2015 | P | FAIL |
Jim Storey
|
|
|
Bryan Phone #: ###-#### c/n on site
|
BLD-Foundation | 8/3/2015 | 8/4/2015 | 8/4/2015 | A | PASS |
Jim Storey
|
|
|
wall // Tyler Phone #: ###-####
|
BLD-Footing | 7/31/2015 | 8/3/2015 | 8/3/2015 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-####
|
Issue PAID IN FULL permit | | | 7/28/2015 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 7/27/2015 | | |
|
|
|
|
Plan assigned to (BJM) | 7/15/2015 | 7/15/2015 | 7/27/2015 | | DONE |
Brian McGowan
|
|
|
|
Telephone call | | | 7/27/2015 | | DONE |
|
|
|
called Doug- left message that permit is ready for pick up and fees due
|
Routing - PLAN CHECK | 7/27/2015 | | 7/27/2015 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 7/27/2015 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/27/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/27/2015 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 7/27/2015 | | DONE |
|
|
|
all requirements met
|
Plan resubmittals received | | | 7/24/2015 | | DONE |
|
|
|
resubmittals received 2 sets of sheets A-102, S-101, S-107 & A-104-took to Brian M
|
1st review completed | | | 7/20/2015 | | FAIL |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 7/1/2015 | | 7/20/2015 | | FAIL |
Brian McGowan
|
|
|
Further information required.
1. Shear/lateral at two story Entry. Tall walls for balloon framing.
2. Beam at front Entry arch and detail of framing.
3. Post sizes and connections at Entry and Patio.
4. Review dimensions and wall widths at Entry/Flex compared to upper floor. Wall widths must match from second floor to footing or stem wall.
5. Using Continuous sheathing method you must provide
2'-0" at braced wall corners or a hold down. Add a hold down at the Mst Bath shower corner and another at the corner of the lower Bath.
6. Foundation Plan ; show all hold downs on Foundation Plan, show 2x6 pony walls as needed at two story Entry and under Upper Floor exterior wall, call out post base, pier size and footing size for posts at Patio and Entry.
|
Routing - PLANNING | 6/29/2015 | | 7/16/2015 | | PASS |
Sue Cummings
|
|
|
|
Plan assigned to (LEG) Tisha | 6/25/2015 | | 7/15/2015 | | DEFR |
Tisha Gallop
|
|
|
7/08
|
Routing - MECHANICAL | 6/29/2015 | | 7/1/2015 | | PASS |
Troy James
|
|
|
|
Routing - Addressing | 6/25/2015 | | 6/26/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 6/26/2015 | | 6/26/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/25/2015 | | DONE |
|
|
|
|
Intake Approval | | | 6/25/2015 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/25/2015 | | DONE |
|
|
|
|
Application received | | 6/25/2015 | | | |
|
|
|
|