PubWorks Occupancy Approval | 5/17/2016 | 5/17/2016 | 5/17/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
|
Letter of compliance/Occupancy | | | 5/17/2016 | | DONE |
|
|
|
|
Letter of compliance/Occupancy | | | 12/11/2015 | | DONE |
|
|
|
|
BLD-Final | 12/4/2015 | 12/7/2015 | 12/7/2015 | A | PASS |
Jim Storey
|
|
|
Sandy Phone #: ###-####
|
DOC - Permit Finaled | 12/7/2015 | 12/7/2015 | 12/7/2015 | P | PASS |
Jim Storey
|
|
|
final ok pw bond in place
|
Routing PW Grading-Hillside | 12/7/2015 | | 12/7/2015 | | PASS |
Jim Wyllie
|
|
|
Received bonding for completion of drainage and landscaping facilities. Okay to permit Temporary Occupancy.
Jim Wyllie / ###-####
|
BLD-Final | 12/3/2015 | 12/3/2015 | 12/3/2015 | P | FAIL |
Jim Storey
|
|
|
Call for access code - Sandy Phone #: ###-#### need public works final for roof drainage// need continous handrail.
|
Plan Modification Accepted | | | 11/16/2015 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 11/16/2015 | | 11/16/2015 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Energy code compliance | 9/25/2015 | 9/28/2015 | 9/28/2015 | A | PASS |
Jim Storey
|
|
|
Tom Phone #: ###-####
|
BLD-Framing/Rough-in | 9/23/2015 | 9/24/2015 | 9/24/2015 | A | PASS |
Jim Storey
|
|
|
Tom Phone #: ###-####
|
BLD-Footing | 8/17/2015 | 8/18/2015 | 8/18/2015 | A | PASS |
Jim Storey
|
|
|
Jared Phone #: ###-####
|
PubWorks Subgrade Approval | 8/17/2015 | 8/17/2015 | 8/17/2015 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 8/10/2015 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Bld | | | 8/10/2015 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 8/5/2015 | | |
|
|
|
|
Routing - PLAN CHECK | 8/5/2015 | | 8/5/2015 | | PASS |
David Ferguson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/5/2015 | | DONE |
David Ferguson
|
|
|
|
Permit Ready to Issue | | | 8/5/2015 | | DONE |
|
|
|
ALL REQUIREMENTS MET
|
Plan assigned to (DAF) | 7/29/2015 | 7/29/2015 | 8/3/2015 | | FAIL |
David Ferguson
|
|
|
1st review completed 8/3/15
|
1st review completed | | | 8/3/2015 | | FAIL |
David Ferguson
|
|
|
|
Routing - PLAN CHECK | 7/15/2015 | | 8/3/2015 | | FAIL |
David Ferguson
|
|
|
|
Plan assigned to (LEG) Tisha | 7/15/2015 | | 7/29/2015 | | DEFR |
Tisha Gallop
|
|
|
8/5 L2 ePlan
|
Routing - MECHANICAL | 7/28/2015 | | 7/28/2015 | | PASS |
Troy James
|
|
|
|
Routing PW Grading-Hillside | 7/15/2015 | | 7/23/2015 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - MECHANICAL | 7/15/2015 | | 7/22/2015 | | FAIL |
Troy James
|
|
|
emailed opsrey corrections
|
Routing - FIRE | 7/15/2015 | 7/15/2015 | 7/20/2015 | | PASS |
Scott Arellano
|
|
|
No comments attached. This project has been evaluated for Fire Department vehicle access.
|
Routing - Erosion and Sediment | 7/15/2015 | | 7/20/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
WUI Zone A; Permit for the construction of a new 3263 sq. ft., two story (first story 2180 sq. ft., second story 1083 sq. ft.) single family dwelling with 4 bedrooms, 2.5 bathrooms, approximately 220 sq. ft. of covered patio’s/porches and 1100 sq. ft. attached garage
|
Routing - PLANNING | 7/15/2015 | | 7/15/2015 | | PASS |
Sue Cummings
|
|
|
setbacks are per the plat notes.
|
Routing - Addressing | 7/15/2015 | | 7/15/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 7/15/2015 | | 7/15/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/15/2015 | | DONE |
|
|
|
|
Intake Approval | | | 7/15/2015 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/15/2015 | | DONE |
|
|
|
|
Application received | | | 6/26/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 26 2015 2:38PM
|