Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD15-02232
StatusFinaled
Name OWYHEE ENTERPRISES LLC
Site Address 1028 E HARCOURT RD
Project Name 
Customer Number 
ePlanReviewNo
Description
WUI Zone A; Permit to remove existing 720 sq. ft. two level deck (360 sq. ft. main level, 360 sq. ft. upper level) and replace with new engineered deck of exact same dimensions. All work is to be done according to approved plans, Engineering, Plan Review Notes and current local codes. //leg ***A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/3/20159/4/20159/4/2015APASS
DetailsTony Young
Call 20 mins before // Zach Phone #: ###-####
DOC - Permit Finaled9/4/20159/4/20159/4/2015PPASS
DetailsTony Young
done
BLD-Footing7/16/20157/17/20157/16/2015APART
DetailsTony Young
Zack Phone #: ###-####
PubWorks Subgrade Approval7/14/20157/14/20157/14/2015 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
Issue PAID IN FULL permit  7/7/2015 DONE
DetailsChristina Prado
OVERRIDE  7/2/2015  
Routing Walk-In (BLD)7/2/20157/2/20157/2/2015APASS
DetailsTisha Gallop
Plan assigned to (LEG) Tisha6/29/2015 7/2/2015 DONE
DetailsTisha Gallop
walk in 1st review 6/29; need struct calcs and footing details
Inspection Record Card- Bld  7/2/2015 DONE
Telephone call  7/2/2015 DONE
Called GC- told them permit is ready, fees due and need RP
PLANS/APPL TAKEN TO FRONT DESK  7/2/2015 DONE
Inspection Record Card- Bld  7/2/2015 DONE
Permit Ready to Issue  7/2/2015 DONE
NEED RP
Routing Walk-In (BLD)6/29/20156/29/20156/29/2015PCANC
DetailsTisha Gallop
routed to esc
Routing Walk-In (PW Hillside)6/29/20156/29/20156/29/2015APASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Routing Walk-In (Zoning)6/29/20156/29/20156/29/2015APASS
DetailsTed Vanegas
Routing - Erosion and Sediment6/29/2015 6/29/2015 PASS
DetailsEvan Jenkins
WUI Zone A; Permit to removed existing 720 sq. ft. two level deck (360 sq. ft. main level, 360 sq. ft. upper level) and replace with new deck of exact same dimensions.
Routing - PLAN CHECK6/29/2015 6/29/2015 FAIL
DetailsTisha Gallop
need structural calculations and footing details
1st review completed  6/29/2015 DONE
DetailsTisha Gallop
Application received 6/29/2015