Permit Information
Permit NumberBLD15-02260
StatusFinaled
Name JSE ENTERPRISES LLC
Site Address 6921 W TARGEE ST
Project NameKirk Braun Storage Building
Customer Number 
ePlanReviewYes
Description
(KIRK BRAUN STORAGE BUILDING) Permit is to construct a new 5,600 square foot office / warehouse building. Approval contingent upon adhering to the approved plans on file. Work to include: new foundation, new wood frame exterior walls, new pre-manufactured roof truss system, associated site improvements, interior walls to define an office area and restroom, new plumbing, new electrical, new mechanical, accessible doors / hardware, and interior finishes in compliance with chapter 8 of the 2012 IBC. This building is not Fire Sprinklered. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 4/22/20165/11/2016 DONE
mailed 5-12-16
First Notice 3/25/20164/12/2016 DONE
sent in mail 4-13-16
Permanent Occupancy  3/15/2016 DONE
BLD-Final3/14/20163/14/20163/14/2016PPASS
DetailsPhil Shearer
Zoning Approval3/11/20163/11/20163/11/2016 DONE
DetailsAndrea Tuning
PubWorks Occupancy Approval1/7/20161/7/20161/7/2016 DONE
DetailsTiffany Lowery
BLD-Final12/30/201512/31/20151/4/2016ANR
DetailsPhil Shearer
Jeff Phone #: ###-####
BLD-Final12/29/201512/30/201512/30/2015PCANC
DetailsPhil Shearer
Phone #: ###-####

MUST PAY ACHD IMPACT FEES PRIOR TO FINAL CO INSPECTION - SEE CHRISTINA WITH QUESTIONS
FIRE-Final Inspection12/29/201512/29/201512/29/2015PPASS
DetailsTroy Cobbley
Life safety passed. Contractor to remove the exit sign between the warehouse and office area due to the locking door. Sign is not shown on plans.
Print Occupancy Form  12/4/2015 DONE
BLD-Energy code compliance11/19/201511/20/201511/20/2015APASS
DetailsJim Sly
Jeff Phone #: ###-####
BLD-Framing/Rough-in11/19/201511/19/201511/19/2015PPASS
DetailsPhil Shearer
Jeff Phone #: ###-####
BLD-Wall Bracing10/12/201510/12/201510/12/2015PPASS
DetailsPhil Shearer
Jeff Phone #: ###-####
BLD-Footing9/8/20159/9/20159/9/2015APART
DetailsPhil Shearer
Jeff Phone #: ###-####
BLD-Foundation8/27/20158/27/20158/27/2015PPASS
DetailsPhil Shearer
Jeb Phone #: ###-####
BLD-Footing8/24/20158/25/20158/25/2015PPASS
DetailsPhil Shearer
Jeff Phone #: ###-####
Issue PAID IN FULL permit  8/11/2015 DONE
Print Occupancy Form  8/11/2015 DONE
Route to Impact Fee Review8/10/20158/13/20158/10/2015 PASS
DetailsCindy M. Gould
Telephone call  8/10/2015 DONE
Spoke with Neil informing him that the permit is ready we just need to know who the RP is going to be and need a 302 and 306 from the GC
OVERRIDE  8/7/2015  
Routing - FIRE8/7/2015 8/7/2015 PASS
DetailsKatie Marron
Approved with conditions for proposed new fire hydrant, see attached review report.
Routing - PLAN CHECK8/4/2015 8/7/2015 PASS
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  8/7/2015 DONE
Permit Ready to Issue  8/7/2015 DONE
NEED GC, RP and Revised Cert of Value- ALL REQUIRMENTS MET 8/11/15 //CEV
Plan assigned to (TLW)7/6/2015 8/7/2015 PASS
DetailsTim L. Woodard
Routing PW Sewer Design8/6/2015 8/6/2015 PASS
DetailsKyle S. Rosenmeyer
Routing - Design Review8/4/2015 8/4/2015 PASS
DetailsAndrea Tuning
Plan resubmittals received  8/4/2015 DONE
DetailsTim L. Woodard
Routing - PUBLIC WORKS7/6/2015 7/28/2015 PASS
DetailsTim L. Woodard
Routing PW Drainage7/7/2015 7/28/2015 PASS
DetailsBrian Murphy
Routing Off Site - STRUCTURAL7/6/2015 7/27/2015 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK7/6/2015 7/27/2015 FAIL
DetailsTim L. Woodard
1st review completed  7/27/2015 DONE
DetailsTim L. Woodard
Routing PW Environmental7/7/2015 7/22/2015 PASS
DetailsRick Christenson
Routing PW Sewer Rating7/7/2015 7/21/2015 PASS
DetailsJennifer Bruner
Routing PW Sewer Design7/7/2015 7/13/2015 FAIL
DetailsKyle S. Rosenmeyer
Spoke with Aspen Engineers 7/13. Expecting an additional utility sheet to be uploaded to eplan review.
Routing PW Street Lights7/7/2015 7/8/2015 PASS
DetailsMike D Hedge
No new street light requirements.
Routing - FIRE7/6/2015 7/8/2015 FAIL
DetailsKatie Marron
Report attached to case and emailed to architect.
Routing - Erosion and Sediment7/6/2015 7/7/2015 PASS
DetailsEvan Jenkins
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)

A 5,600 square foot storage building with a small office area.
Routing - MECHANICAL7/6/2015 7/7/2015 PASS
DetailsTroy James
Routing - PLUMBING7/6/2015 7/7/2015 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Routing - PLANNING Land Div7/6/2015 7/7/2015 PASS
DetailsDave Abo
Parcel B of ROS #9995. See ROS14-00069.
Routing - Addressing7/6/2015 7/7/2015 PASS
DetailsEmily Dixon
Routing - Design Review7/6/2015 7/7/2015 FAIL
DetailsAndrea Tuning
Construct a 5-foot concrete sidewalk on the west side of the building.
Intake Approval  7/6/2015 PASS
Pending Assignment by TLW7/6/2015 7/6/2015 DONE
DetailsTim L. Woodard
Application received  7/1/2015 DONE
Application submitted via PDS Online on Jul 1 2015 10:58AM