BLD-Final | 7/22/2015 | 7/22/2015 | 7/22/2015 | P | PASS |
Tony Young
|
|
|
Jim Phone #: ###-####
|
DOC - Permit Finaled | 7/22/2015 | 7/22/2015 | 7/22/2015 | P | PASS |
Tony Young
|
|
|
signed paperwork,,, no electrical at this point
|
BLD-Footing | 7/15/2015 | 7/15/2015 | 7/15/2015 | P | PASS |
Tony Young
|
|
|
James Phone #: ###-####
|
BLD-Foundation | 7/15/2015 | 7/15/2015 | 7/15/2015 | P | PASS |
Tony Young
|
|
|
James Phone #: ###-####,, post ok
|
BLD-Framing/Rough-in | 7/15/2015 | 7/15/2015 | 7/15/2015 | P | PASS |
Tony Young
|
|
|
James Phone #: ###-####
|
Routing Walk-In (BLD) | 7/9/2015 | 7/9/2015 | 7/9/2015 | P | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 7/9/2015 | | DONE |
Javier Guzman
|
|
|
|
Inspection Record Card- Bld | | | 7/9/2015 | | DONE |
Javier Guzman
|
|
|
|
Case Summary (BLD) | | | 7/9/2015 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/9/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/9/2015 | | DONE |
|
|
|
all requirments met
|
Issue PAID IN FULL permit | | | 7/9/2015 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 7/8/2015 | 7/8/2015 | 7/8/2015 | A | FAIL |
Tisha Gallop
|
|
|
need calcs for the lateral and uplift engineering detail and need engineering for full structure including gravity loads for footings.
|
Routing Walk-In (Zoning) | 7/1/2015 | 7/1/2015 | 7/1/2015 | P | DONE |
Leon Letson
|
|
|
OK to make use of driveway off front. New single-car garage to replace existing single-car parking space.
|
Routing Walk-In (BLD) | 7/1/2015 | 7/1/2015 | 7/1/2015 | P | FAIL |
Tisha Gallop
|
|
|
need engineering for pole structure
|
Application received | | 7/1/2015 | | | |
|
|
|
|