Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD15-02284
StatusFinaled
Name TREASURE VALLEY COMMUNITY TELEVISI
Site Address 6225 W OVERLAND RD
Project NameCoffee Studio
Customer Number 
ePlanReviewNo
Description
**(COFFEE STUDIO)** Application for inspection to determine requirements for issuance of a Certificate of Occupancy for a 160 sq. ft. existing tenant space previously occupied by “Boise City Drive Thru Coffee” under BLD98-03373. NO NEW WORK IS AUTHORIZED UNDER THIS PERMIT. There will be no change to the occupancy. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy  8/29/2016 DONE
BLD-Final7/19/20167/20/20167/20/2016PPASS
DetailsMike Jordan
Lyndsey Phone #: ###-####. Ok for perm occ.
FIRE-Final Inspection7/19/20167/20/20167/20/2016APASS
DetailsTroy Cobbley
Life safety passed
BLD-Final6/30/20167/1/20167/1/2016ANR
DetailsMike Jordan
Lyndsey Phone #: ###-####. Fire/life safety failed.
FIRE-Final Inspection6/30/20167/1/20167/1/2016AFAIL
DetailsTroy Cobbley
Provide address numbers as discussed and remove the thumbturn deadbolt from the door (keyed with sticker is ok) as discussed.
Telephone call  6/30/2016 DONE
Left a message for Lyndsey stating that this permit is going to expire tomorrow 7-1 and will need to be picked up since they are occuping the space.
Issue PAID IN FULL permit  6/30/2016 DONE
BLD-Conference6/29/20166/29/20166/29/2016PFAIL
DetailsMike Jordan
Occupancy Permit is going to expire soon. Just need to make sure the space is not being occupied before letting permit expire if needed. A coorection notice was issued noting to call and schedule life/safety and structural final inspections.
Telephone call  6/23/2016 DONE
Left a message for Lyndsey informing her that this permit is going to expire in eight days and wanted to see how she would like to proceed. Informed her that if Coffee Studio is occupanying the space then this permit would have to be picked up and have the required inspections completed.
Expiration Notice6/7/20166/28/20166/7/2016 DONE
DetailsBrittany Hill
Telephone call  3/31/2016 DONE
Spoke with Lindsay to see if the coffee shop was still going to go into the space on overland. She stated she thought the sign company picked up the occupancy and that she would come in the next week to pick up the permit
Telephone call  9/28/2015 DONE
Left a message for Lyndsey to touch bases if this space is still going to be occupied and if so the permit would need to be picked up and inspections done.
Plan assigned to (JG)7/2/20157/2/20157/8/2015 PASS
DetailsJavier Guzman
Coffee Studio
Routing - PLAN CHECK7/2/2015 7/8/2015 PASS
DetailsJavier Guzman
Case Summary (BLD)  7/8/2015 DONE
DetailsJavier Guzman
1st review completed  7/8/2015 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  7/8/2015 DONE
Permit Ready to Issue  7/8/2015 DONE
please do not re issue-was issued by mistake
Print Occupancy Form  7/8/2015 DONE
Telephone call  7/8/2015 DONE
called Lyndsey to let know permit was ready
Routing - PUBLIC WORKS7/7/2015 7/7/2015 PASS
DetailsJennifer Bruner
Routing - Addressing7/7/2015 7/7/2015 PASS
DetailsJason C. Taylor
Plans ACCEPTED BY PLAN TECH  7/2/2015 DONE
Intake Approval  7/2/2015 PASS
DetailsAdele J Schaffeld-Griffin
Recd Pcfee & Taken To Pln CK  7/2/2015 DONE
Issue PAID IN FULL permit  7/2/2015 DONE
CHANGE STATUS TO (REV)  7/2/2015 DONE
was issued by mistake
First Notice 9/8/2016   
Application received 7/2/2015