Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD15-02285
StatusFinaled
Name JONES ERIK G
Site Address 816 S HARDING ST
Project Name 
Customer Number 
ePlanReviewNo
Description
Homeowner was red tagged by an inspector while performing a remodel. Scope of work includes raising the roof on the north side of the house to create a larger 2nd story. No bathroom will be allowed due to low ceiling height therefore there will be one large room. Owner is installing 4 new windows, one will be required to meet egress. All work to be per local codes and the approved plans and attached engineering. **DAF**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/8/20163/8/20163/8/2016PPASS
DetailsMike Jordan
Erik-after 3:00 if possible Phone #: ###-####
DOC - Permit Finaled3/8/20163/8/20163/8/2016PPASS
DetailsMike Jordan
BLD-Aging Inspection2/5/20162/5/20162/5/2016 PEND
DetailsPhil Shearer
BLD-Aging Inspection2/4/20162/4/20162/4/2016 PEND
DetailsPhil Shearer
BLD-Wall cover9/23/20159/23/20159/23/2015PCANC
DetailsMike Jordan
Eric Phone #: ###-####
BLD-Energy code compliance9/23/20159/23/20159/23/2015PPASS
DetailsMike Jordan
Eric Phone #: ###-####
BLD-Framing/Rough-in9/15/20159/15/20159/15/2015PPASS
DetailsPhil Shearer
erik Phone #: ###-####. Pending MEC inspection
BLD-Framing/Rough-in8/19/20158/20/20158/20/2015APART
DetailsPhil Shearer
Eric Phone #: ###-####. Roof OK to cover
Routing Walk-In (BLD)7/13/20157/13/20157/13/2015PPASS
DetailsDavid Ferguson
Inspection Record Card- Bld  7/13/2015 DONE
DetailsDavid Ferguson
Case Summary (BLD)  7/13/2015 DONE
DetailsDavid Ferguson
PLANS/APPL TAKEN TO FRONT DESK  7/13/2015 DONE
Issue PAID IN FULL permit  7/13/2015 DONE
Permit Ready to Issue  7/13/2015 DONE
DetailsBrittany Hill
CHANGE STATUS TO (ISS)  7/13/2015 DONE
DetailsBrittany Hill
Routing Walk-In (Zoning)7/2/20157/2/20157/2/2015PDONE
DetailsSue Cummings
Routing Walk-In (BLD)7/2/20157/2/20157/2/2015PFAIL
DetailsTisha Gallop
need structural engineering and roof framing plans. ceilig height above bathroom sinks is insufficient
1st review completed  7/2/2015 FAIL
Application received 7/2/2015