PubWorks Occupancy Approval | 10/21/2016 | 10/21/2016 | 10/21/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Final | 9/30/2016 | 10/3/2016 | 10/3/2016 | A | PASS |
Tony Young
|
|
|
Todd Phone #: ###-####
|
DOC - Permit Finaled | 10/3/2016 | 10/3/2016 | 10/3/2016 | P | PASS |
Tony Young
|
|
|
|
PubWorks Occupancy Approval | 10/3/2016 | 10/3/2016 | 10/3/2016 | | DONE |
Jason C. Taylor
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Final | 9/30/2016 | 9/30/2016 | 9/30/2016 | P | PART |
Tony Young
|
|
|
Todd Phone #: ###-####,, ok pending hillside approval
|
BLD-Final | 9/29/2016 | 9/30/2016 | 9/30/2016 | A | NR |
Tony Young
|
|
|
Todd Phone #: ###-####
|
BLD-Final | 9/28/2016 | 9/29/2016 | 9/29/2016 | A | NR |
Tony Young
|
|
|
Todd Phone #: ###-####,, walk through,, needs guard rail per code,, needs fire caulking,, hill side
|
BLD-Conference | 9/22/2016 | 9/23/2016 | 9/23/2016 | P | DONE |
Phil Shearer
|
|
|
Todd Phone #: ###-####
|
BLD-Aging Inspection | 7/15/2016 | 7/15/2016 | 7/22/2016 | | PEND |
Tony Young
|
|
|
|
BLD-Other | 3/3/2016 | 3/4/2016 | 3/4/2016 | A | PASS |
Tony Young
|
|
|
Rod Phone #: ###-####,, soffit cover
|
BLD-Wall Bracing | 3/2/2016 | 3/3/2016 | 3/3/2016 | P | PASS |
Tony Young
|
|
|
Rod Phone #: ###-####,, interior shear drywall bracing ok
|
BLD-Other | 2/18/2016 | 2/18/2016 | 2/18/2016 | P | PASS |
Tony Young
|
|
|
Rod-soffits Phone #: ###-####
|
BLD-Other | 2/17/2016 | 2/18/2016 | 2/18/2016 | A | PEND |
Tony Young
|
|
|
Rod-soffits Phone #: ###-####
|
BLD-Framing/Rough-in | 2/17/2016 | 2/17/2016 | 2/17/2016 | P | PEND |
Tony Young
|
|
|
Rod-soffits Phone #: ###-####,, ok pending electrical pass
|
BLD-Energy code compliance | 2/9/2016 | 2/9/2016 | 2/9/2016 | P | PASS |
Mike Jordan
|
|
|
Rob Phone #: ###-####
|
BLD-Framing/Rough-in | 1/11/2016 | 1/12/2016 | 1/12/2016 | P | PASS |
Tony Young
|
|
|
Pat Phone #: ###-####,, ok except for soffits,, ok to insulate
|
Plan Modification Accepted | | | 12/22/2015 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 12/22/2015 | | 12/22/2015 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Wall Bracing | 12/2/2015 | 12/3/2015 | 12/3/2015 | P | PASS |
Tony Young
|
|
|
Rod Phone #: ###-####
|
BLD-Wall Bracing | 12/2/2015 | 12/2/2015 | 12/2/2015 | P | NR |
Jim Storey
|
|
|
Rod Phone #: ###-####
|
BLD-Wall Bracing | 12/1/2015 | 12/2/2015 | 12/2/2015 | A | NR |
Dave Hannah
|
|
|
Rod Phone #: ###-####
|
BLD-Foundation | 10/7/2015 | 10/8/2015 | 10/8/2015 | A | PART |
Tony Young
|
|
|
Bill Phone #: ###-####
|
PubWorks Subgrade Approval | 10/7/2015 | 10/7/2015 | 10/7/2015 | | DONE |
Jason C. Taylor
|
|
|
***FRONT PORCH AREA ONLY***A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 10/6/2015 | 10/6/2015 | 10/6/2015 | P | PASS |
Phil Shearer
|
|
|
Bill Phone #: ###-####
|
BLD-Foundation | 9/23/2015 | 9/24/2015 | 9/24/2015 | P | PART |
Tony Young
|
|
|
Bill Phone #: ###-####
|
BLD-Foundation | 9/21/2015 | 9/22/2015 | 9/22/2015 | A | PART |
Jim Sly
|
|
|
pour 11:30AM; Bill Phone #: ###-#### Select walls OK
|
BLD-Footing | 9/11/2015 | 9/11/2015 | 9/11/2015 | P | PART |
Tony Young
|
|
|
Bill Phone #: ###-####
|
BLD-Footing | 9/10/2015 | 9/11/2015 | 9/11/2015 | A | PART |
Tony Young
|
|
|
Bill Phone #: ###-####,, basement ftgs wip ok
|
BLD-Footing | 9/10/2015 | 9/10/2015 | 9/10/2015 | P | PART |
Tony Young
|
|
|
Bill Phone #: ###-####,, not ready all the way
|
PubWorks Subgrade Approval | 9/9/2015 | 9/9/2015 | 9/9/2015 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 8/24/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/24/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/24/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 8/18/2015 | | |
|
|
|
|
Routing - MECHANICAL | 8/18/2015 | | 8/18/2015 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | 8/18/2015 | | 8/18/2015 | | PASS |
David Ferguson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/18/2015 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 8/18/2015 | | |
|
|
|
|
Permit Ready to Issue | | | 8/18/2015 | | DONE |
|
|
|
requirements met
|
Plan assigned to (DAF) | 8/12/2015 | 8/12/2015 | 8/13/2015 | | FAIL |
David Ferguson
|
|
|
due 8/14 L2 ePlan
|
Routing - PLANNING | 8/13/2015 | | 8/13/2015 | | PASS |
David Moser
|
|
|
|
1st review completed | | | 8/13/2015 | | FAIL |
David Ferguson
|
|
|
|
Routing - PLAN CHECK | 7/23/2015 | | 8/13/2015 | | FAIL |
David Ferguson
|
|
|
|
Plan assigned to (LEG) Tisha | 7/23/2015 | | 8/12/2015 | | DEFR |
Tisha Gallop
|
|
|
8/14 L2
|
Routing - PUBLIC WORKS GRADING | 7/23/2015 | | 8/4/2015 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - PLANNING | 7/23/2015 | | 7/27/2015 | | FAIL |
David Moser
|
|
|
required to wait until 10 day appeal period is over on 7-31-15
|
Routing - Addressing | 7/23/2015 | | 7/23/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 7/23/2015 | | 7/23/2015 | | PASS |
Connie Baumgartner
|
|
|
|
CHANGE STATUS TO (REV) | | | 7/23/2015 | | DONE |
|
|
|
plan review fees paid
|
Intake Approval | | | 7/23/2015 | | PASS |
|
|
|
plan review fees paid
|
Routing - Erosion and Sediment | 7/23/2015 | | 7/23/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
Authorized with Conditions to Narrative
Permit for the construction of a new 5519 sq. ft., three story (first story 2623 sq. ft., second story 1551 sq. ft. and basement 1345 sq. ft.) single family dwelling with 4 bedrooms, 3.5 bathrooms, approximately 483 sq. ft. of covered patio/porch and a 1486 sq. ft. attached garage
|
Routing - MECHANICAL | 7/23/2015 | | 7/23/2015 | | FAIL |
Troy James
|
|
|
|
Intake Approval | | | 7/22/2015 | | FAIL |
|
|
|
Need fees paid
|
Intake Approval | | | 7/22/2015 | | FAIL |
|
|
|
Upload and label plans/drawings individually ***ESC, Biuilding Section & Mechanical MET*** Needs Erosion & Sediment Control Narrative, Building Cross Section, Mechanical equipment locations
|
Routing - FIRE | 7/23/2015 | | 7/22/2015 | | PASS |
Scott Arellano
|
|
|
This structure has been evaluated for Fire Department Vehicle Access. No separate comments are attached.
|
CHANGE STATUS TO (PND) | | | 7/22/2015 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 7/16/2015 | | 7/16/2015 | | PASS |
Andy J. Long
|
|
|
ESC plan submitted and approved under ESC15-00345. This permit covers pre-construction site prep, retaining wall, and SFH construction. No further ESC review needed, permit issued seperately from BLD with approvals.
|
Application received | | | 7/6/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 6 2015 4:16PM
|
Plans ACCEPTED BY PLAN TECH | | | | | DONE |
|
|
|
|
Override - Parcel Holds | | | | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | | | DONE |
|
|
|
|