BLD-Final | 10/23/2015 | 10/26/2015 | 10/26/2015 | A | PASS |
Phil Shearer
|
|
|
call ahead for access; Cameron Phone #: ###-####
|
DOC - Permit Finaled | 10/26/2015 | 10/26/2015 | 10/26/2015 | P | PASS |
Phil Shearer
|
|
|
|
BLD-Energy code compliance | 9/8/2015 | 9/9/2015 | 9/9/2015 | P | PASS |
Phil Shearer
|
|
|
Cameron Phone #: ###-####
|
BLD-Framing/Rough-in | 9/9/2015 | 9/9/2015 | 9/9/2015 | P | PASS |
Phil Shearer
|
|
|
Cameron Phone #: ###-####
|
BLD-Framing/Rough-in | 9/3/2015 | 9/8/2015 | 9/8/2015 | A | PART |
Mike Jordan
|
|
|
Cameron Phone #: ###-####. ok to insulate. provide truss engineering on energy code inspection.
|
BLD-Framing/Rough-in | 9/3/2015 | 9/4/2015 | 9/4/2015 | A | NR |
Mike Jordan
|
|
|
Cameron Phone #: ###-####. Mech rough in inspection failed.
|
BLD-Wall Bracing | 8/25/2015 | 8/26/2015 | 8/26/2015 | A | PASS |
Jim Storey
|
|
|
Cameron Phone #: ###-####
|
BLD-Foundation | 7/31/2015 | 7/31/2015 | 7/31/2015 | P | PASS |
Phil Shearer
|
|
|
Bill Phone #: ###-####
|
BLD-Footing | 7/29/2015 | 7/30/2015 | 7/30/2015 | P | PASS |
Jim Storey
|
|
|
Bill Phone #: ###-####
|
BLD-Footing | 7/28/2015 | 7/29/2015 | 7/29/2015 | P | CANC |
Jim Storey
|
|
|
Bill Phone #: ###-####
|
OVERRIDE | | | 7/28/2015 | | |
|
|
|
|
Plan assigned to (BJM) | 7/23/2015 | 7/23/2015 | 7/28/2015 | | DONE |
Brian McGowan
|
|
|
|
Telephone call | | | 7/28/2015 | | DONE |
Christina Prado
|
|
|
Called Cameron to advise permit is ready for pick up and gave fees due
|
Issue PAID IN FULL permit | | | 7/28/2015 | | DONE |
Christina Prado
|
|
|
|
Case Summary (BLD) | | | 7/28/2015 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/28/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/28/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/28/2015 | | DONE |
|
|
|
ALL REQUIREMENTS MET
|
Routing - PLAN CHECK | 7/15/2015 | | 7/28/2015 | | PASS |
Brian McGowan
|
|
|
|
1st review completed | | | 7/24/2015 | | FAIL |
Brian McGowan
|
|
|
REScheck does not match the proposed house, the Manual J needs to be verified that it is in conjunction with the REScheck and proposed home.
|
Plan assigned to (LEG) Tisha | 7/8/2015 | | 7/23/2015 | | DEFR |
Tisha Gallop
|
|
|
7/20
|
Routing - MECHANICAL | 7/10/2015 | | 7/15/2015 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 7/9/2015 | | 7/10/2015 | | PASS |
Susan Riggs
|
|
|
|
Routing - PUBLIC WORKS | 7/8/2015 | | 7/9/2015 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 7/8/2015 | | 7/8/2015 | | PASS |
Jason C. Taylor
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/8/2015 | | DONE |
|
|
|
|
Intake Approval | | | 7/8/2015 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/8/2015 | | DONE |
|
|
|
|
Application received | | 7/7/2015 | | | |
|
|
|
|
Routing - PLAN CHECK | 7/24/2015 | | | | FAIL |
Brian McGowan
|
|
|
REScheck does not match home. Maual J does not match REScheck. Emailed Stephanie at Jayo construction requesting resubmitted REScheck and MAnual J that mathcehs the new REScheck and plans.
|