(TARGET) To remodel an existing 101,850 sq.ft. retail store per approved plans. Exterior work to include new entrance awning, installation of ballards, interior remodel of fitting rooms, check out asiles, and eating area including electrical, mechanical and plumbing work and miscelaneous related interior finishes. This building is fully fire sprinkled any alterations to the fire sprinkler system shall be per NFPA 13 as regulated by Boise Fire. RMH
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 12/15/20151/5/2016 DONE
Print Statement  1/5/2016 DONE
Third Notice 11/14/201512/10/2015 DONE
Second Notice 10/22/201511/9/2015 DONE
sent in mail
First Notice10/2/201510/2/201510/12/2015 DONE
DetailsDave Hannah
Mailed 10-13-15
Letter of compliance/Occupancy  10/5/2015 DONE
Letter of compliance/Occupancy  10/5/2015 DONE
BLD-Final10/1/201510/2/201510/2/2015PDONE
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Robert Snow
BLD-Final10/1/201510/2/201510/2/2015APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Robert Snow
DOC - Permit Finaled10/2/201510/2/201510/2/2015PPASS
DetailsDave Hannah
FIRE-Final Inspection10/1/201510/2/201510/2/2015APASS
DetailsTroy Cobbley
Fire Life Safety Passed
FIRE-Final Inspection9/30/201510/1/201510/1/2015ACANC
DetailsTroy Cobbley
Could not do life safety until the project related fire sprinkler permit is complete.
BLD-Conference9/23/20159/23/20159/23/2015PPASS
DetailsMike Jordan
Exterior Framing Phone #: ###-#### Inspection requested via web by Robert Snow. Contractor has installed the coorect clips per plan on new store front. Ok to cover.
BLD-Conference9/21/20159/22/20159/22/2015AFAIL
DetailsMike Jordan
Exterior framing Phone #: ###-#### Inspection requested via web by Robert Snow. Provide the correct clips per the plan or RFI from engineer specifing that cut metal stud is sufficient.
BLD-Framing/Rough-in9/18/20159/18/20159/18/2015APASS
DetailsMike Jordan
Customer service walls Phone #: ###-#### Inspection requested via web by Robert Snow
BLD-Framing/Rough-in9/15/20159/15/20159/15/2015APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Robert Snow. Interior steel stud wall in fitting room area ok.
BLD-Framing/Rough-in8/27/20158/27/20158/27/2015APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Robert Snow. INterior steel stud framed walls for cafeteria remodel.
BLD-Concrete8/16/20158/17/20158/17/2015APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Robert Snow. #3 rebar in trenced area at slab in the jewlery section of store. ok.
Issue PAID IN FULL permit  7/29/2015 DONE
Telephone call  7/22/2015 DONE
customer called wanted total fees due. I got the GC info so all we need is the rev cert of val and the CG to be filled out
Routing - PLAN CHECK7/14/2015 7/21/2015 PASS
DetailsRon Hill
Routing - FIRE7/16/2015 7/21/2015 PASS
DetailsKatie Marron
Comments attached to plans.
Plan assigned to (R_H)7/14/2015 7/21/2015 PASS
DetailsRon Hill
1st review completed  7/21/2015 PASS
Routing - PLAN CHECK7/21/2015 7/21/2015 PASS
DetailsRon Hill
No Comments attached
PLANS/APPL TAKEN TO FRONT DESK  7/21/2015 DONE
Case Summary (BLD)  7/21/2015  
Permit Ready to Issue  7/21/2015 DONE
DetailsChristina Prado
**ALL REQUIREMENTS MET** Need GC & Revised Cert of Value for issuance
Inspection Record Card- Bld  7/21/2015 DONE
DetailsChristina Prado
Telephone call  7/21/2015 DONE
Left a message for Scott informing him that permit is ready to be picked up just need a GC Form and a Revised Cert of Value
Routing - PLUMBING7/16/2015 7/16/2015 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Routing - PLANNING7/16/2015 7/16/2015 PASS
DetailsAndrea Tuning
Routing - PUBLIC WORKS7/9/2015 7/9/2015 PASS
DetailsJennifer Bruner
Plans ACCEPTED BY PLAN TECH  7/9/2015 DONE
Intake Approval  7/9/2015 PASS
Recd Pcfee & Taken To Pln CK  7/9/2015 DONE
Application received 7/9/2015   
Routing - Addressing7/9/2015   PASS