Second Notice | | 7/24/2016 | 7/28/2016 | | DONE |
|
|
|
This permit finaled on the web by Joshua Edwards
|
First Notice | | 7/10/2016 | 7/14/2016 | | DONE |
|
|
|
Mailed 7-15-16
|
Print Occupancy Form | | | 6/30/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/30/2016 | | DONE |
|
|
|
|
Permanent Occupancy | | | 6/30/2016 | | DONE |
|
|
|
|
PubWorks Occupancy Approval | 6/23/2016 | 6/23/2016 | 6/23/2016 | | DONE |
Jason C. Taylor
|
|
|
|
BLD-Final | 6/20/2016 | 6/21/2016 | 6/21/2016 | A | CANC |
Phil Shearer
|
|
|
Joe Phone #: ###-####
|
BLD-Final | 6/16/2016 | 6/17/2016 | 6/17/2016 | P | PASS |
Phil Shearer
|
|
|
I would like to be there. Thanks ###-#### Inspection requested via web by Kyle Buzzell
|
FIRE-Final Inspection | 6/16/2016 | 6/17/2016 | 6/17/2016 | A | PASS |
Jim Page
|
|
|
Final life fire safety inspection passed/complete.
|
FIRE-Final Inspection | 6/8/2016 | 6/8/2016 | 6/8/2016 | P | PART |
Jim Page
|
|
|
No fire sprinklers, no fire alarms, fire extinguisher is in place with a current inspection tag. Final life fire safety inspection for clubhouse passed/complete. Cannot final life fire safety inspection for permit until exit gate from pool area has panic hardware installed with path of travel swinging out for gate. Pool area needs to have occupancy placard installed, once these items are corrected/inspected then life fire safety can be finaled.
|
FIRE-Final Inspection | 6/6/2016 | 6/7/2016 | 6/7/2016 | A | FAIL |
Jim Page
|
|
|
No phone number provided for point of contact to give information on inspection fail, fire extinguisher needs to be inspected by a licensed contractor and tagged accordingly, no addressing installed on building at time of inspection. Could not verify operation of exit door located in pool area, door was secured with cable lock at time of inspection.
|
Zoning Approval | 6/7/2016 | 6/7/2016 | 6/7/2016 | | PASS |
Josh Wilson
|
|
|
|
BLD-Conference | 6/2/2016 | 6/2/2016 | 6/2/2016 | P | DONE |
Phil Shearer
|
|
|
Let me know when you can be out here please Inspection requested via web by Kyle Buzzell
|
BLD-Energy code compliance | 3/21/2016 | 3/21/2016 | 3/21/2016 | P | PASS |
Phil Shearer
|
|
|
Inspection requested via web by Kyle Buzzell
|
BLD-Energy code compliance | 3/15/2016 | 3/16/2016 | 3/16/2016 | A | PASS |
Phil Shearer
|
|
|
Air seal
|
BLD-Framing/Rough-in | 3/15/2016 | 3/15/2016 | 3/15/2016 | P | PASS |
Phil Shearer
|
|
|
Inspection requested via web by Kyle Buzzell
|
BLD-Wall Bracing | 3/9/2016 | 3/14/2016 | 3/14/2016 | A | PASS |
Phil Shearer
|
|
|
Need inspection at 9 am so we can cover shear wall. Phone #: ###-#### Inspection requested via web by Kyle Buzzell
|
BLD-Conference | 3/9/2016 | 3/9/2016 | 3/9/2016 | P | DONE |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Buzzell
|
BLD-Wall cover | 2/26/2016 | 2/26/2016 | 2/26/2016 | P | PASS |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Buzzel Exterior only
|
BLD-Foundation | 1/21/2016 | 1/21/2016 | 1/21/2016 | P | PASS |
Phil Shearer
|
|
|
Doug Phone #: ###-####
|
BLD-Footing | 1/19/2016 | 1/20/2016 | 1/20/2016 | A | PASS |
Phil Shearer
|
|
|
DOUG Phone #: ###-####
|
Issue PAID IN FULL permit | | | 12/30/2015 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/30/2015 | | DONE |
|
|
|
|
Expiration Notice | 12/22/2015 | 1/14/2016 | 12/22/2015 | | DONE |
Brittany Hill
|
|
|
|
OVERRIDE | | | 12/18/2015 | | |
|
|
|
|
Routing Off Site - STRUCTURAL | 12/4/2015 | | 12/18/2015 | | PASS |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/18/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/18/2015 | | DONE |
Christina Prado
|
|
|
***ALL REQUIRMENTS MET 12-28-15 /CEV
Need GC form, & revised certificate of value for issuance
|
Routing - PLAN CHECK | 12/4/2015 | | 12/18/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Plan assigned to (TLW) | 9/21/2015 | | 12/18/2015 | | PASS |
Tim L. Woodard
|
|
|
1st Review Complete
|
Routing - PLUMBING | 12/4/2015 | | 12/8/2015 | | PASS |
Daryl Spivey
|
|
|
|
Plan resubmittals received | | | 12/2/2015 | | DONE |
|
|
|
|
Route to Impact Fee Review | 10/1/2015 | 10/4/2015 | 10/5/2015 | | PASS |
Cindy M. Gould
|
|
|
|
Routing PW Flood Plain | 9/22/2015 | | 10/1/2015 | | PASS |
Jim Wyllie
|
|
|
Approved in E-Plan Review. TLW
|
1st review completed | | | 10/1/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/21/2015 | | 10/1/2015 | | FAIL |
Tim L. Woodard
|
|
|
Corrections on E-Plan. TLW
|
Routing - PUBLIC WORKS | 9/21/2015 | | 10/1/2015 | | PASS |
Tim L. Woodard
|
|
|
Approved in E-Plan. TLW
|
Routing Off Site - STRUCTURAL | 9/21/2015 | | 10/1/2015 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing - PLANNING Land Div | 9/21/2015 | | 9/25/2015 | | PASS |
Dave Abo
|
|
|
Lot 18, Block 1 of Barbervalley Townhomes Subdivision #1
|
Routing - MECHANICAL | 9/21/2015 | | 9/24/2015 | | PASS |
Troy James
|
|
|
|
Routing - FIRE | 9/21/2015 | 9/21/2015 | 9/23/2015 | | PASS |
Katie Marron
|
|
|
Review attached to case.
|
Routing PW Sewer Rating | 9/22/2015 | | 9/23/2015 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Design Review | 9/21/2015 | | 9/23/2015 | | PASS |
Josh Wilson
|
|
|
|
Routing PW Drainage | 9/22/2015 | | 9/22/2015 | | PASS |
Brian Murphy
|
|
|
JASON OKED
|
Routing - Addressing | 9/21/2015 | | 9/22/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - Erosion and Sediment | 9/21/2015 | | 9/22/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
(BARBER VALLEY - Clubhouse) Permit for a new 1,814 square foot community clubhouse. New clubhouse for the Barber Valley Townhomes subdivision.
|
Routing - PLUMBING | 9/21/2015 | | 9/21/2015 | | FAIL |
Daryl Spivey
|
|
|
1) provide a civil sheet showing sewer and water services
|
Intake Approval | | | 9/21/2015 | | PASS |
|
|
|
|
Pending Assignment by TLW | 9/21/2015 | | 9/21/2015 | | DONE |
Tim L. Woodard
|
|
|
|
Application received | | | 7/9/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 9 2015 10:16AM
|
Intake Approval | | | 7/9/2015 | | FAIL |
|
|
|
Please provide the following items:
Planning and zonning approval letters.
ESC plan and narraitve.
Special inspection startup form 310 prepared and stamped by the EOR.
Interior and exterior lighting compliance.
Plumbing and Mechanical plans.
Mechanical ComCheck with heating and cooling load calculations.
|