Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD15-02359
StatusFinaled
Name ENGELKE CONSTRUCTION SOLUTIONS LLC
Site Address 4115 S BROADWAY AVE
Project NameTA - Boise, ID
Customer Number 
ePlanReviewYes
Description
(TRAVEL CENTERS OF AMERICA – COUNTRY PRIDE) Permit is to remodel a 6,061 sq. ft. restaurant space within the 20,391 sq. ft. Travel Center of America building. Approval contingent upon adhering to the approved plans on file. Work to include: select demolition of existing nonbearing walls, new lighting fixtures, new acoustic ceiling tiles, new mechanical diffusers, replacing sinks in the existing locations and finishes in compliance with chapter 8 of the 2012 IBC. NOTE: Accessible restrooms for use by public are located within Travel Centers of America building. This building is fully fire sprinklered any alterations or modifications to the sprinkler system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA #13 as regulated by the fire department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
CHANGE STATUS TO (FNL)  12/18/2015 DONE
Passes Final in August
BLD-Final8/11/20158/12/20158/12/2015PPASS
DetailsJim Sly
Brennan Phone #: ###-####
OK for Perm Occ.
FIRE-Final Inspection8/11/20158/11/20158/11/2015PPASS
DetailsTroy Cobbley
Life safety passed
FIRE-Final Inspection8/10/20158/10/20158/10/2015PFAIL
DetailsTroy Cobbley
City approved plans and small documents not on site, repair exit sign from kitchen, provide corrected occupant load sign. Per Scott and I's discussion fire alarm modifications not required at this time for the notification in the Dining Seating area.
BLD-Final8/7/20158/7/20158/7/2015PNR
DetailsJim Storey
Brennan Phone #: ###-####
BLD-Ceiling Grid Inspection8/5/20158/6/20158/6/2015APASS
DetailsJim Storey
brennan Phone #: ###-####
Issue PAID IN FULL permit  8/4/2015 DONE
Inspection Record Card- Bld  8/4/2015 DONE
Plan assigned to (JG)7/21/20157/21/20158/3/2015 PASS
DetailsJavier Guzman
8/03 pending CDH for1st review, TA - Boise, ID
Routing Off Site - C.D.H7/21/2015 8/3/2015 PASS
DetailsJavier Guzman
signed off in eplan by Tammie McCarter of Central District Health also email sent to me on 8/3/2015 stating Project for TRavel Center Will be approved today on you're eplan review.
Tammie McCarter
CDHD
1st review completed  8/3/2015 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  8/3/2015 DONE
Permit Ready to Issue  8/3/2015 DONE
DetailsChristina Prado
**ALL REQUIREMENTS MET** Need GC & Revised certificate of value for issuance-8-4-15 received by fax
Routing - PLAN CHECK7/21/2015 7/29/2015 PASS
DetailsJavier Guzman
Routing - FIRE7/22/20157/22/20157/24/2015 PASS
DetailsKatie Marron
Comments attached to case.
Routing - Addressing7/21/2015 7/21/2015 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS7/21/2015 7/21/2015 PASS
DetailsBeverly Mountain
No change in customer service area. bam
Intake Approval  7/21/2015 PASS
DetailsCarl D Madsen
Intake Approval  7/15/2015 FAIL
1. Form 304 registered design professional for.
2. Please review the plan submittal requirements. The plan sheets are required to be uploaded as single sheets and not as a packet.
3. I tappears that there are some minor alteration to the exterior of the building a the entrnace doors. Zoning approval is required for any exterior alterations. Please provide a zoning approval letter. Contact Josh Wilson at
###-####.
4. I would encourage you to make an appointment with CDHD to get your plans approved as it is usually a quicker process than when we route the plans electronically to them.
Application received  7/9/2015 DONE
Application submitted via PDS Online on Jul 9 2015 12:18PM