BLD-Final | 7/30/2015 | 7/30/2015 | 7/30/2015 | P | DONE |
Tony Young
|
|
|
Final can be done at anytime you are in the area. Thanks. Phone #: ###-#### Inspection requested via web by rich prasch
|
DOC - Permit Finaled | 7/30/2015 | 7/30/2015 | 7/30/2015 | P | PASS |
Tony Young
|
|
|
done
|
BLD-Final | 7/29/2015 | 7/30/2015 | 7/30/2015 | A | DEFR |
Tony Young
|
|
|
Final can be done at anytime you are in the area. Thanks. Phone #: ###-#### Inspection requested via web by rich prasch
|
BLD-Footing | 7/24/2015 | 7/27/2015 | 7/27/2015 | A | PASS |
Tony Young
|
|
|
Jimmy Phone #: ###-####
|
PubWorks Subgrade Approval | 7/27/2015 | 7/27/2015 | 7/27/2015 | | DONE |
Jason C. Taylor
|
|
|
**4 COLUMN PADS***A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 7/24/2015 | 7/24/2015 | 7/24/2015 | P | PEND |
Tony Young
|
|
|
Jimmy Phone #: ###-####,, ok after soils report
|
Permit Ready to Issue | | | 7/22/2015 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/22/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/13/2015 | | DONE |
|
|
|
requirements met
|
Telephone call | | | 7/13/2015 | | DONE |
|
|
|
called Rich to let know permit is ready and how much is owed-left message on his cell phone
|
Routing Walk-In (BLD) | 7/11/2015 | 7/11/2015 | 7/11/2015 | A | PASS |
Javier Guzman
|
|
|
|
Case Summary (BLD) | | | 7/11/2015 | | DONE |
Javier Guzman
|
|
|
|
Inspection Record Card- Bld | | | 7/11/2015 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/11/2015 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 7/10/2015 | 7/10/2015 | 7/10/2015 | A | PASS |
Leon Letson
|
|
|
|
Routing Walk-In (PW Hillside) | 7/10/2015 | 7/10/2015 | 7/10/2015 | A | PASS |
Leon Letson
|
|
|
Prior to scheduling a footing inspection, applicant's geotechnical engineer shall submit a letter approving the footing subgrade.
Jim Wyllie / ###-####
|
Routing Walk-In (BLD) | 7/10/2015 | 7/10/2015 | 7/10/2015 | A | FAIL |
Javier Guzman
|
|
|
need engineering for the hillside footing
|
1st review completed | | | 7/10/2015 | | FAIL |
Javier Guzman
|
|
|
|
Application received | | 7/10/2015 | | | |
|
|
|
|