Print Statement | | | 7/11/2016 | | DONE |
|
|
|
|
First Notice | 6/21/2016 | 6/21/2016 | 7/5/2016 | | DONE |
Jim Sly
|
|
|
Completed 7/5/16
|
Print Statement | | | 7/5/2016 | | DONE |
|
|
|
|
Permanent Occupancy UNPAID FEE | | | 7/5/2016 | | DONE |
|
|
|
|
BLD-Final | 6/20/2016 | 6/21/2016 | 6/21/2016 | A | PASS |
Jim Sly
|
|
|
Rod Phone #: ###-####
|
DOC - Permit Finaled | 6/21/2016 | 6/21/2016 | 6/21/2016 | P | PASS |
Jim Sly
|
|
|
|
Zoning Approval | 5/12/2016 | 5/12/2016 | 5/12/2016 | | DONE |
Andrea Tuning
|
|
|
|
Telephone call | | | 5/11/2016 | | DONE |
|
|
|
called John-told him the final was changed from pass to partial and once they get the P & Z inspection passed they need to let Jim Sly know so he can change the part to a pass. Talked to Jim Sly as well so he knows
|
CHANGE STATUS TO (ISS) | | | 5/11/2016 | | DONE |
|
|
|
was finaled by mistake
|
BLD-Final | 4/28/2016 | 4/29/2016 | 4/29/2016 | P | PART |
Jim Sly
|
|
|
would like call ahead Phone #: ###-#### need p&z final
|
DOC - Permit Finaled | 4/29/2016 | 4/29/2016 | 4/29/2016 | P | PASS |
Jim Sly
|
|
|
|
PubWorks Occupancy Approval | 4/4/2016 | 4/4/2016 | 4/4/2016 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Final | 3/31/2016 | 4/1/2016 | 4/1/2016 | A | PART |
Jim Sly
|
|
|
All other inspections are final Phone #: ###-#### Inspection requested via web by steven barth Zoning Bonded BND 16-00031 Andrea T. OK for Temp occ.
|
Temporary Occupancy | 4/1/2016 | 6/30/2016 | 4/1/2016 | | DONE |
Kristal Soland
|
|
|
|
Temporary Occupancy | 4/1/2016 | 6/30/2016 | 4/1/2016 | | DONE |
Kristal Soland
|
|
|
|
Zoning Approval Temp | 4/1/2016 | 4/1/2016 | 4/1/2016 | | DONE |
Andrea Tuning
|
|
|
|
Plan resubmittals received | | | 3/28/2016 | | DONE |
|
|
|
received final reports from Radix-took to Jason Taylor
|
FIRE-Final Inspection | 3/24/2016 | 3/25/2016 | 3/25/2016 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspections complete (FIR15-00793 for underground, FIR15-00865 for overhead) fire alarm inspection complete (FIR15-00902) fire alarm communicator inspection complete (FIR16-00190) Final life fire safety inspection passed/complete.
|
FIRE-Final Inspection | 3/23/2016 | 3/24/2016 | 3/24/2016 | A | CANC |
Jim Page
|
|
|
Inspection request rescheduled for 25MAR16, Steve Phone #: ###-####
|
BLD-Conference | 3/23/2016 | 3/23/2016 | 3/23/2016 | P | PEND |
Tony Young
|
|
|
Prior Final for shell Steve Barth Phone #: ###-#### Inspection requested via web by steven barth,, need trades etc.
|
BLD-Conference | 3/22/2016 | 3/23/2016 | 3/23/2016 | A | PART |
Tony Young
|
|
|
Prior Final for shell Steve Barth Phone #: ###-#### Inspection requested via web by steven barth,, walk through
|
BLD-Energy code compliance | 2/24/2016 | 2/24/2016 | 2/24/2016 | A | PASS |
Mike Jordan
|
|
|
Partial inside walls in order to remove equipment from that bay. Phone #: ###-#### Inspection requested via web by steven barth
|
BLD-Conference | 2/22/2016 | 2/22/2016 | 2/22/2016 | P | PART |
Tony Young
|
|
|
Framing inspection Plumbing is good. Elec called to today. Mech is stub above only. Inspection for insulation. Phone #: ###-#### Inspection requested via web by steven barth,,, walls ok to insulate
|
BLD-Framing/Rough-in | 2/19/2016 | 2/19/2016 | 2/19/2016 | P | PART |
Jim Sly
|
|
|
Framing Phone #: ###-#### Inspection requested via web by steven barth Interior non bearing demising walls OK to cover..........Providing that they do not contain any utilities.
|
BLD-Conference | 2/17/2016 | 2/18/2016 | 2/18/2016 | A | PART |
Tony Young
|
|
|
Demising walls inside the building Phone #: ###-#### Inspection requested via web by steven barth,, 3 demising walls ok pending adding sill bolts within 12" of ends
|
BLD-Wall Bracing | 2/4/2016 | 2/5/2016 | 2/5/2016 | A | PASS |
Tony Young
|
|
|
Sheer inspection. Thankyou. Phone #: ###-#### Inspection requested via web by steven barth,,, exterior ok
|
BLD-Wall Bracing | 1/26/2016 | 1/27/2016 | 1/27/2016 | A | PART |
Tony Young
|
|
|
Partial sheer nail inspection for area to receive electrical switch gear,. Steven Barth contact. Phone #: ###-#### Inspection requested via web by steven barth,, ok
|
CHANGE STATUS TO (ISS) | | | 1/4/2016 | | DONE |
|
|
|
plan mod was picked up
|
Inspection Record Card- Bld | | | 1/4/2016 | | DONE |
|
|
|
|
(F) Reprint permit | | | 1/4/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 12/9/2015 | | |
|
|
|
|
Permit Ready to Issue | | | 12/9/2015 | | DONE |
Christina Prado
|
|
|
****DO NOT RE-ISSUE****
All requirements met
|
Routing - PLUMBING | 12/4/2015 | | 12/8/2015 | | PASS |
Daryl Spivey
|
|
|
|
Plan assigned to (TLW) | 11/10/2015 | | 12/8/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PUBLIC WORKS | 12/4/2015 | | 12/7/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Addressing | 12/4/2015 | | 12/4/2015 | | PASS |
Laura Hunter
|
|
|
|
Routing - PLAN CHECK | 12/4/2015 | | 12/4/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Plan Modification Accepted | | | 11/10/2015 | | DONE |
Christina Prado
|
|
|
Plan mod requested for changes to add deming wall & slab to existing space
|
BLD-Footing | 10/14/2015 | 10/15/2015 | 10/16/2015 | P | PART |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by steven barth Perimeter Fooping OK pending GeoTech Special inspection, tests and approvals.
|
Issue PAID IN FULL permit | | | 10/8/2015 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/8/2015 | | DONE |
|
|
|
|
Telephone call | | | 10/7/2015 | | DONE |
|
|
|
received an email from Kent requesting the fees due. I emailed him back with the fees attached
|
OVERRIDE | | | 10/6/2015 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/6/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/6/2015 | | DONE |
|
|
|
NEEDS ACHD, ALL OTHER REQUIRMENTS MET 10-6-15 //CEV NEED GC form, certificate of value, and RP-10-6-15-RP has been received CAN
|
Plan assigned to (TLW) | 8/3/2015 | | 10/6/2015 | | PASS |
Tim L. Woodard
|
|
|
First review completed.
|
Routing - PLANNING | 10/1/2015 | | 10/2/2015 | | PASS |
David Moser
|
|
|
|
Routing Off Site - STRUCTURAL | 9/29/2015 | | 10/1/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - Design Review | 9/29/2015 | | 10/1/2015 | | PASS |
Andrea Tuning
|
|
|
|
Routing PW Drainage | 9/29/2015 | | 9/30/2015 | | PASS |
Jason C. Taylor
|
|
|
|
Plan resubmittals received | | | 9/29/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/29/2015 | | 9/29/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLANNING | 9/29/2015 | | 9/29/2015 | | FAIL |
David Moser
|
|
|
The trash enclousure is in the irrigation easement. Need approval letter from irrigation district for trash.
|
Routing Off Site - STRUCTURAL | 9/11/2015 | | 9/28/2015 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 9/11/2015 | | 9/28/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Routing PW Drainage | 9/11/2015 | | 9/25/2015 | | FAIL |
Jason C. Taylor
|
|
|
See changemark notes in ePlan.
|
Routing - PLANNING | 9/11/2015 | | 9/18/2015 | | FAIL |
David Moser
|
|
|
The trash enclousure is in the irrigation easement
|
Routing - PLUMBING | 9/11/2015 | | 9/15/2015 | | PASS |
Daryl Spivey
|
|
|
|
Routing - Design Review | 9/11/2015 | | 9/11/2015 | | FAIL |
Andrea Tuning
|
|
|
Relocate the proposed bicycle parking (7 spaces) for Building 3 to meet the dimensional standards and site location required by the current code.
Provide a total of 14-street trees along State Street. If there is not sufficient room to accommodate the 14 required trees, increase the buffer along State Street, eliminate some parking or other approved method to accommodate the trees.
Remove the proposed Spring Snow Crabapple tree located in the interior planters and install the required Class II or Class III tree with low shrubs or other vegetative groundcover in each interior planter island.
Remove the proposed Spring Snow Crabapple and Krauter Veusivus Purple Leaf Plum trees from the interior parking lot planters and hardscape adjacent to the buildings and replace them with the required Class II tree and low growing shrubs or other vegetative groundcover.
Replace the Class II trees that were originally located (now removed) in the two terminal planters near State Street at the main entrance to the site.
Replace the Class II trees that were originally located (now removed) in the two terminal planters near the driveway intersection between the four buildings.
|
Plan resubmittals received | | | 9/11/2015 | | DONE |
|
|
|
|
Route to Impact Fee Review | 8/31/2015 | 9/3/2015 | 9/1/2015 | | PASS |
Cindy M. Gould
|
|
|
|
1st review completed | | | 8/31/2015 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 8/3/2015 | | 8/31/2015 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 8/3/2015 | | 8/31/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Routing PW Drainage | 8/4/2015 | | 8/13/2015 | | FAIL |
Jason C. Taylor
|
|
|
See changemarks in ePlan.
|
Routing PW Environmental | 8/4/2015 | | 8/13/2015 | | PASS |
Rick Christenson
|
|
|
No more than 2 facilities connected to each 1500 gallon Exterior Grease Interceptor.
|
Routing - FIRE | 8/3/2015 | 8/3/2015 | 8/11/2015 | | PASS |
Katie Marron
|
|
|
Comments attached to case.
|
Routing - PLANNING | 8/10/2015 | | 8/10/2015 | | FAIL |
David Moser
|
|
|
I need a copy of the recorded cross access agreement for the site since the service drives cross property lines. The 5 foot wide detached sidewalk along State Street needs to be installed or bonded for before issuance of building permits for the commercial parcels. I need a copy of the cross access easement to the adjacent parcel to the west at the northwest and southwest corners. I believe these easement areas were identified on the approved site plan.
|
Routing PW Solid Waste | 8/4/2015 | | 8/7/2015 | | PASS |
Megan Durrell
|
|
|
Trash Enclosure Gates MUST open at least 120 degrees. Currently designed & drawn at 90 degrees. Please correct.
|
Routing PW Sewer Design | 8/4/2015 | | 8/6/2015 | | PASS |
Kyle S. Rosenmeyer
|
|
|
Connects to sewer service provided by Kensington Apartments sewer extension.
|
Routing - PLUMBING | 8/3/2015 | | 8/6/2015 | | FAIL |
Daryl Spivey
|
|
|
show interceptor venting
|
Routing PW Sewer Rating | 8/4/2015 | | 8/5/2015 | | PASS |
Jennifer Bruner
|
|
|
No plumbing fixtures; no review required.
|
Routing - Design Review | 8/3/2015 | | 8/5/2015 | | FAIL |
Andrea Tuning
|
|
|
Relocate the proposed bicycle parking (7 spaces) for Building 3 to meet the dimensional standards and site location required by the current code.
Provide a total of 14-street trees along State Street. If there is not sufficient room to accommodate the 14 required trees, increase the buffer along State Street, eliminate some parking or other approved method to accommodate the trees.
Remove the proposed Spring Snow Crabapple tree located in the interior planters and install the required Class II or Class III tree with low shrubs or other vegetative groundcover in each interior planter island.
Remove the proposed Spring Snow Crabapple and Krauter Veusivus Purple Leaf Plum trees from the interior parking lot planters and hardscape adjacent to the buildings and replace them with the required Class II tree and low growing shrubs or other vegetative groundcover.
Replace the Class II trees that were originally located (now removed) in the two terminal planters near State Street at the main entrance to the site.
Replace the Class II trees that were originally located (now removed) in the two terminal planters near the driveway intersection between the four buildings.
|
Routing - PUBLIC WORKS | 8/3/2015 | | 8/4/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Erosion and Sediment | 8/3/2015 | | 8/4/2015 | | PASS |
Evan Jenkins
|
|
|
(SIte Prep Inspection and Approval Required Prior to Earth Disturbance)
Construction of a 7,564 SF commercial retail building within the multi-family apartment complex.
NORTH POINT RETAIL BUILDING NUMBER 3
|
Routing - PLANNING Land Div | 8/3/2015 | | 8/4/2015 | | PASS |
Dave Abo
|
|
|
|
Routing - Addressing | 8/3/2015 | | 8/3/2015 | | PASS |
Emily Dixon
|
|
|
|
Pending Assignment by TLW | 8/3/2015 | | 8/3/2015 | | DONE |
Tim L. Woodard
|
|
|
|
Intake Approval | | | 7/31/2015 | | PASS |
|
|
|
|
Intake Approval | | | 7/16/2015 | | FAIL |
Javier Guzman
|
|
|
Please provide:
1. Erosion & Sediment Control (ESC) Narrative, Narrative must be designed for the
specific project, and be prepared and signed by a plan designer certified by Boise City.
|
Application received | | | 7/11/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 11 2015 4:05PM
|