Print Statement | | | 7/11/2016 | | DONE |
Christina Prado
|
|
|
|
First Notice | 7/1/2016 | 7/1/2016 | 7/5/2016 | | DONE |
Jim Sly
|
|
|
completed 7/5/16
|
Print Occupancy Form | | | 7/5/2016 | | DONE |
|
|
|
|
Permanent Occupancy | | | 7/5/2016 | | DONE |
|
|
|
|
Print Statement | | | 7/5/2016 | | DONE |
|
|
|
|
BLD-Final | 6/30/2016 | 7/1/2016 | 7/1/2016 | A | PASS |
Jim Sly
|
|
|
Rod Phone #: ###-####
|
DOC - Permit Finaled | 7/1/2016 | 7/1/2016 | 7/1/2016 | P | PASS |
Jim Sly
|
|
|
|
PubWorks Occupancy Approval | 7/1/2016 | 7/1/2016 | 7/1/2016 | | DONE |
Tiffany Lowery
|
|
|
|
Zoning Approval | 6/16/2016 | 6/16/2016 | 6/16/2016 | | DONE |
Andrea Tuning
|
|
|
|
BLD-Final | 4/28/2016 | 4/29/2016 | 4/29/2016 | P | NR |
Jim Sly
|
|
|
would like call ahead Phone #: ###-#### Need Public works and Zoning final
|
FIRE-Final Inspection | 3/28/2016 | 3/28/2016 | 3/28/2016 | P | PASS |
Jim Page
|
|
|
Fire sprinkler inspections complete (FIR15-00792 for underground, FIR15-00910 for overhead) fire alarm inspection complete (FIR15-00901) fire alarm communicator inspection complete (FIR16-00189) Final life fire safety inspection passed/complete
|
Plan resubmittals received | | | 3/28/2016 | | DONE |
|
|
|
received final reports from Radix-took to Jason Taylor
|
FIRE-Final Inspection | 3/24/2016 | 3/25/2016 | 3/25/2016 | A | CANC |
Jim Page
|
|
|
Could not complete life fire safety inspection due to FIR permits still in the issued status. Reminded contractors numorous times about FIR permits needing to be finaled before life fire safety inspection can be completed. Inspection request cancelled, life fire safety will be completed after FIR permits are finaled.
|
FIRE-Final Inspection | 3/23/2016 | 3/24/2016 | 3/24/2016 | A | CANC |
Jim Page
|
|
|
Inspection request rescheduled for 25MAR16, Steve Phone #: ###-####
|
BLD-Final | 3/23/2016 | 3/23/2016 | 3/23/2016 | P | NR |
Tony Young
|
|
|
Wanting final for shell Phone #: ###-#### Inspection requested via web by steven barth,, need trades,, prior notes
|
BLD-Conference | 3/22/2016 | 3/23/2016 | 3/23/2016 | A | PART |
Tony Young
|
|
|
Wanting final for shell Phone #: ###-#### Inspection requested via web by steven barth,, walk through on final.. need all trades,, including ACHD, zoning,, final letter of ok from engineer?,, verify tempered glass locations
|
BLD-Energy code compliance | 1/29/2016 | 2/1/2016 | 2/1/2016 | A | PASS |
Jim Sly
|
|
|
inside insulation and vapor barrier except the lower 4 feet left open until floor area is graded. Phone #: ###-#### Inspection requested via web by steven barth Talked to Steve.......OK to rock lower 4' after vapor barrier pulled back down and concrete floor completed.
|
BLD-Energy code compliance | 1/28/2016 | 1/29/2016 | 1/29/2016 | P | DEFR |
Tony Young
|
|
|
inside insulation and vapor barrier except the lower 4 feet left open until floor area is graded. Phone #: ###-#### Inspection requested via web by steven barth
|
BLD-Framing/Rough-in | 1/25/2016 | 1/26/2016 | 1/26/2016 | A | PART |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by steven barth Fire riser room has plywood on one inside wall with electrical panels attached. Arch to provide fix for maintaing 1 hr wall. OK to insulate.
|
BLD-Wall Bracing | 12/24/2015 | 12/28/2015 | 12/28/2015 | A | PASS |
Tony Young
|
|
|
AM pls. Inspection for shear wall. Phone #: ###-#### Inspection requested via web by steven barth,, exterior ok
|
BLD-Framing/Rough-in | 12/23/2015 | 12/24/2015 | 12/24/2015 | A | PART |
Tony Young
|
|
|
AM pls. Inspection for shear wall. Phone #: ###-#### Inspection requested via web by steven barth,, work in progress
|
BLD-Foundation | 11/2/2015 | 11/3/2015 | 11/3/2015 | P | PASS |
Tony Young
|
|
|
Place concrete at 2pm. Third Party inspection by Geo Tec. Requested inspection after lunch pls. Phone #: ###-#### Inspection requested via web by steven barth,, met engineer on site,, Luke,, he is watching job
|
BLD-Footing | 10/27/2015 | 10/28/2015 | 10/28/2015 | A | PEND |
Dave Hannah
|
|
|
Special inspection performed by Geo Tec AM. Steel for footing. Pour at 11Am Phone #: ###-#### Inspection requested via web by steven barth crew about 90% spec inspection will sign off
|
Print Occupancy Form | | | 10/8/2015 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/2/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 10/1/2015 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/1/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/1/2015 | | DONE |
Christina Prado
|
|
|
nneed RP ***ALL REQUIRMENTS MET 10-2-15 //CEV Need GC, RP, ACHD & Revised certificate of value for issuance
|
Plan assigned to (TLW) | 8/3/2015 | | 10/1/2015 | | PASS |
Tim L. Woodard
|
|
|
First review completed.
|
Routing - Design Review | 9/29/2015 | | 10/1/2015 | | PASS |
Andrea Tuning
|
|
|
|
Routing - PLAN CHECK | 9/29/2015 | | 9/29/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLANNING | 9/29/2015 | | 9/29/2015 | | PASS |
David Moser
|
|
|
The trash enclourse has been moved outside of irrigation easement.
|
Plan resubmittals received | | | 9/29/2015 | | DONE |
|
|
|
|
Routing PW Solid Waste | 9/11/2015 | | 9/28/2015 | | PASS |
Megan Durrell
|
|
|
|
Routing Off Site - STRUCTURAL | 9/11/2015 | | 9/28/2015 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 9/11/2015 | | 9/28/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Routing PW Drainage | 9/11/2015 | | 9/25/2015 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PLANNING | 9/11/2015 | | 9/18/2015 | | FAIL |
David Moser
|
|
|
The trash enclosures are located within the irrigation easement along State Street
|
Routing - PLUMBING | 9/11/2015 | | 9/15/2015 | | PASS |
Daryl Spivey
|
|
|
per plans
|
Plan resubmittals received | | | 9/11/2015 | | DONE |
|
|
|
|
Routing - Design Review | 9/11/2015 | | 9/11/2015 | | FAIL |
Andrea Tuning
|
|
|
Relocate the proposed bicycle parking (7 spaces) for Building 3 to meet the dimensional standards and site location required by the current code.
Provide a total of 14-street trees along State Street. If there is not sufficient room to accommodate the 14 required trees, increase the buffer along State Street, eliminate some parking or other approved method to accommodate the trees.
Remove the proposed Spring Snow Crabapple tree located in the interior planters and install the required Class II or Class III tree with low shrubs or other vegetative groundcover in each interior planter island.
Remove the proposed Spring Snow Crabapple and Krauter Veusivus Purple Leaf Plum trees from the interior parking lot planters and hardscape adjacent to the buildings and replace them with the required Class II tree and low growing shrubs or other vegetative groundcover.
Replace the Class II trees that were originally located (now removed) in the two terminal planters near State Street at the main entrance to the site.
Replace the Class II trees that were originally located (now removed) in the two terminal planters near the driveway intersection between the four buildings.
|
Route to Impact Fee Review | 8/31/2015 | 9/3/2015 | 9/1/2015 | | PASS |
Cindy M. Gould
|
|
|
|
1st review completed | | | 8/31/2015 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 8/3/2015 | | 8/31/2015 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 8/3/2015 | | 8/31/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Routing PW Drainage | 8/4/2015 | | 8/13/2015 | | FAIL |
Jason C. Taylor
|
|
|
see drainage/grading changemark notes in eplan. JCT
|
Routing PW Environmental | 8/4/2015 | | 8/13/2015 | | PASS |
Rick Christenson
|
|
|
Each 1500 gallon interceptor shown to service no more than 2 Suites.
|
Routing - FIRE | 8/3/2015 | 8/3/2015 | 8/11/2015 | | PASS |
Katie Marron
|
|
|
Comments attached to case
|
Routing - PLANNING | 8/10/2015 | | 8/10/2015 | | FAIL |
David Moser
|
|
|
I need a copy of the recorded cross access agreement for the site since the service drives cross property lines. The 5 foot wide detached sidewalk along State Street needs to be installed or bonded for before issuance of building permits for the commercial parcels. I need a copy of the cross access easement to the adjacent parcel to the west at the northwest and southwest corners. I believe these easement areas were identified on the approved site plan. Trash enclosures along State Street are within the irrigation and sewer easements.
|
Routing PW Solid Waste | 8/4/2015 | | 8/7/2015 | | FAIL |
Megan Durrell
|
|
|
Trash enclosure does not meet criteria - inadequate approach & backing distance.
|
Routing PW Sewer Design | 8/4/2015 | | 8/6/2015 | | PASS |
Kyle S. Rosenmeyer
|
|
|
Connects to sewer service provided by the Kensington Apartments sewer extension.
|
Routing PW Sewer Rating | 8/4/2015 | | 8/5/2015 | | PASS |
Jennifer Bruner
|
|
|
No review required; no plumbing fixtures
|
Routing - PLUMBING | 8/3/2015 | | 8/5/2015 | | FAIL |
Daryl Spivey
|
|
|
1) use schedule 40 at water service crossing ( comment only)
2) resubmit showing grease interceptor venting
|
Routing - PLANNING Land Div | 8/3/2015 | | 8/4/2015 | | PASS |
Dave Abo
|
|
|
|
Routing - PUBLIC WORKS | 8/3/2015 | | 8/4/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Erosion and Sediment | 8/3/2015 | | 8/4/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
Construction of a 7,393 SF commercial retail building within the multi-family apartment complex.
North Point Retail Building No. 2
|
Routing - Design Review | 8/3/2015 | | 8/3/2015 | | FAIL |
Andrea Tuning
|
|
|
Relocate the proposed bicycle parking (7 spaces) for Building 3 to meet the dimensional standards and site location required by the current code.
Provide a total of 14-street trees along State Street. If there is not sufficient room to accommodate the 14 required trees, increase the buffer along State Street, eliminate some parking or other approved method to accommodate the trees.
Remove the proposed Spring Snow Crabapple tree located in the interior planters and install the required Class II or Class III tree with low shrubs or other vegetative groundcover in each interior planter island.
Remove the proposed Spring Snow Crabapple and Krauter Veusivus Purple Leaf Plum trees from the interior parking lot planters and hardscape adjacent to the buildings and replace them with the required Class II tree and low growing shrubs or other vegetative groundcover.
Replace the Class II trees that were originally located (now removed) in the two terminal planters near State Street at the main entrance to the site.
Replace the Class II trees that were originally located (now removed) in the two terminal planters near the driveway intersection between the four buildings.
|
Routing - Addressing | 8/3/2015 | | 8/3/2015 | | PASS |
Emily Dixon
|
|
|
|
Pending Assignment by TLW | 8/3/2015 | | 8/3/2015 | | DONE |
Tim L. Woodard
|
|
|
|
Intake Approval | | | 7/31/2015 | | PASS |
|
|
|
|
Intake Approval | | | 7/16/2015 | | FAIL |
Javier Guzman
|
|
|
Please provide:
1. Erosion & Sediment Control (ESC) Narrative, Narrative must be designed for the
specific project, and be prepared and signed by a plan designer certified by Boise City.
|
Application received | | | 7/11/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 11 2015 4:39PM
|